I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
BBS in construction stands for Bar Bending Schedule.
BBS is a document that provides details about the reinforcement steel bars used in a construction project.
It includes information about the size, shape, quantity, and placement of the bars.
BBS helps in estimating the required amount of steel, planning the cutting and bending of bars, and ensuring proper reinforcement in the structure.
Example: BBS for a column may spec...
Mix ratio M 25 is a concrete mix design that consists of 1 part cement, 1 part fine aggregate, and 2 parts coarse aggregate.
M 25 mix ratio is commonly used in construction for structural applications.
The mix ratio represents the proportions of different materials used in the concrete mix.
For M 25, the ratio is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone chips or g...
The number of zones in a u grider varies depending on the specific design and requirements.
The number of zones in a u grider can range from 1 to multiple zones.
Zones are typically created to divide the grider into sections for better load distribution and structural stability.
The number of zones may be determined by factors such as the length and span of the grider, the load it needs to support, and the design specific...
To calculate zone A, zone B, and zone C, you need to know the total area and the dimensions of each zone.
Determine the total area of the site
Calculate the area of zone A by subtracting the combined area of zones B and C from the total area
Calculate the area of zone B using the given dimension
Calculate the area of zone C by subtracting the area of zone B from the total area
Ensure the units of measurement are consistent
Working at heights requires proper safety measures and equipment.
Use appropriate safety harnesses and fall protection systems.
Ensure scaffolding and ladders are secure and stable.
Follow safety guidelines and regulations.
Provide proper training to workers on working at heights.
Regularly inspect and maintain equipment and tools.
Implement safety barriers and guardrails.
Use aerial lifts or platforms for safe access to elev...
I behave as a civil engineer by being professional, organized, and detail-oriented.
I maintain a professional demeanor at all times, treating colleagues and clients with respect.
I am organized in my work, keeping track of project timelines, budgets, and resources.
I pay attention to details, ensuring accuracy in calculations, measurements, and documentation.
I communicate effectively with team members, subcontractors, and...
posted on 26 Sep 2022
I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.
I prioritize efficient progress, worker safety, and effective manpower management.
I closely monitor project timelines and identify areas where progress can be expedited.
I implement strategies such as streamlining processes, optimizing resource allocation, and utilizing technology to increase productivity.
For example, in my previous role as a Civil Foreman, I introduced a new scheduling system that reduced project compl...
I applied via Walk-in and was interviewed before Feb 2023. There were 6 interview rounds.
Any questions asking related civil construction
Behavior is must be staff & company
Safety related questions
posted on 10 Mar 2021
posted on 17 Jan 2022
I applied via Job Portal and was interviewed before Jan 2021. There were 12 interview rounds.
I am an experienced Civil Foreman with a strong background in managing construction projects and leading teams.
Over 10 years of experience in the construction industry
Proven track record of successfully completing projects on time and within budget
Expertise in interpreting blueprints and ensuring compliance with building codes
Skilled in coordinating and supervising construction activities
Strong leadership and communica...
posted on 15 Jul 2017
I was interviewed in May 2018.
There are 25.4 millimeters in 1 inch.
1 inch is equal to 25.4 millimeters.
The conversion factor from inches to millimeters is 25.4.
To convert inches to millimeters, multiply the number of inches by 25.4.
For example, 2 inches is equal to 50.8 millimeters (2 x 25.4).
There are 1000 millimeters in 1 meter.
1 meter is equal to 1000 millimeters.
The conversion factor from meters to millimeters is 1000.
To convert meters to millimeters, multiply the length in meters by 1000.
I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.
The pour sequence refers to the order in which concrete is poured into formwork during construction.
The pour sequence is determined based on the design requirements, structural considerations, and weather conditions.
It is important to follow the pour sequence to ensure proper curing and strength of the concrete.
For example, in a multi-story building construction, the pour sequence may start from the bottom floors and w...
U-girder is a type of precast concrete girder used in bridge construction.
U-girders are shaped like the letter 'U' and are commonly used in bridge projects.
They are precast off-site and transported to the construction site for installation.
U-girders provide structural support and are often used in combination with other bridge components.
They are designed to distribute the load of the bridge deck and traffic to the bri
posted on 11 May 2018
I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.
The number of manpower required in a 1000 sqmt area for a 7-day slab cycle and how to provide jack lapping in the cuplock system.
To determine the number of manpower required, consider the efficiency and productivity of the workers.
Factors such as the complexity of the slab, experience of the workers, and availability of equipment should be taken into account.
For example, if each worker can cover 50 sqmt per day, then 1...
based on 3 reviews
Rating in categories
Store Incharge
7
salaries
| ₹1.5 L/yr - ₹12 L/yr |
Civil Supervisor
6
salaries
| ₹7.2 L/yr - ₹13.5 L/yr |
Mechanical Engineer
6
salaries
| ₹6 L/yr - ₹14.4 L/yr |
Mechanical Technician
5
salaries
| ₹0.6 L/yr - ₹6 L/yr |
Document Controller
5
salaries
| ₹2.2 L/yr - ₹8.6 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Reliance Industries