  • Q1. Working purpos
  • Q2. How to E. T. S work
  • Ans. 

    ETS (Educational Testing Service) is a non-profit organization that develops and administers standardized tests.

    • ETS develops and administers tests like the GRE, TOEFL, and Praxis exams.

    • The organization also offers research and assessment services for educational institutions.

    • ETS uses computer-based testing and scoring for many of its exams.

    • The organization has faced criticism for its role in the standardized testing in

  • Answered by AI

I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is the previous job role ?
  • Q2. What is the percentage of bitumen in DBM ?
  • Ans. 

    The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.

    • DBM stands for Dense Bituminous Macadam, which is a type of road construction material.

    • The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.

    • The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.

    • Higher percentages of bitumen a...

  • Answered by AI
  • Q3. Why you want change your company ?
  • Q4. What is your salary expectation ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't expect genuine to salary hike, really so sad to genuine salary negotiation Person .

I applied via Naukri.com and was interviewed in Feb 2021. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Welding, qc, daily activities
  • Q2. Ndt test, valve industry

Interview Preparation Tips

Interview preparation tips for other job seekers - Little knowledge required but confidence is important

I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Everything related to our field
  • Q2. Past and current project contributions
  • Q3. What do you think about SPCPL

Interview Preparation Tips

Interview preparation tips for other job seekers - Being a professional firm, professional interview and presentation needs to clear

I applied via Recruitment Consulltant and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Discussion about Past experience and projects. Relaxed atmosphere. Normal interview

Interview Preparation Tips

Interview preparation tips for other job seekers - Be relaxed. Explain work and experience. Also projects.

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of Making Minor Bridge?
  • Ans. 

    The process of making a minor bridge involves planning, design, construction, and inspection.

    • 1. Planning phase involves determining the location, size, and type of bridge needed.

    • 2. Design phase includes creating detailed drawings and calculations for the bridge structure.

    • 3. Construction phase involves building the foundation, supports, and deck of the bridge.

    • 4. Inspection phase ensures the bridge meets safety and quali...

  • Answered by AI
  • Q2. How do you assure piling Point ?
  • Ans. 

    Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.

    • Conduct soil investigation to determine soil conditions and suitability for piling.

    • Select appropriate piling equipment based on soil conditions and project requirements.

    • Monitor the piling process to ensure proper installation and alignment of piles.

    • Perform load tests on completed

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why do you change your last Company?
  • Q2. What your salary Expectations ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident towards your Knowledge
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Execution of Elevated Viaduct (ROB) 6.2KM 1200 numbers pile (Friction & end Bearing Pile) Foundation ROB Pile Cap and Pier, PSC T-Type Pier Cap, Post Tensioning Girder,Bow string (ROB) structure box interc...
  • Ans. 

    The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.

    • Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.

    • Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...

  • Answered by AI
  • Q2. Preparation of the planning of site execution day by day as per available drawing. Planning & indenting daily requirement of Labour, Construction Machinery, and Materials &Formwork. Organizing various dail...

Interview Preparation Tips

Interview preparation tips for other job seekers - I certify also that all relative document pertaining my qualifications areon my file and is readily accessible in the case needed further.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Why leave the previous company?
  • Q2. Tell us something about yourself
Round 3 - Assignment 

Total 3 rounds of interview were conducted

Round 4 - HR 

(1 Question)

  • Q1. Salary is getting higher

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 259 Interviews
TCE Interview Questions
3.8
 • 248 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 115 Interviews
Apco Infratech Interview Questions
3.7
 • 113 Interviews
Worley Interview Questions
4.1
 • 111 Interviews
View all

Akshay Construction Reviews and Ratings

based on 5 reviews

1.7/5

Rating in categories

1.4

Skill development

1.4

Work-life balance

1.3

Salary

1.2

Job security

1.3

Company culture

1.3

Promotions

1.2

Work satisfaction

Explore 5 Reviews and Ratings
Civil Site Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Land Surveyor
4 salaries
unlock blur

₹3.6 L/yr - ₹4.3 L/yr

Site Engineer
3 salaries
unlock blur

₹3.5 L/yr - ₹6 L/yr

Junior Engineer Civil
3 salaries
unlock blur

₹1.8 L/yr - ₹2.8 L/yr

Explore more salaries
Compare Akshay Construction with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview