Filter interviews by
I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.
I work in the field of software engineering.
Developing and maintaining software applications
Designing and implementing software solutions
Collaborating with cross-functional teams
Troubleshooting and debugging software issues
Ensuring code quality and adherence to best practices
I applied via Job Portal
I appeared for an interview before Mar 2024, where I was asked the following questions.
Effective project handling involves planning, communication, and adaptability to ensure successful outcomes.
Define clear project goals and objectives to align the team.
Utilize project management tools like Jira or Trello for tracking progress.
Conduct regular team meetings to discuss updates and challenges.
Implement Agile methodologies to adapt to changes quickly.
Document all processes and decisions for future reference
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
posted on 24 Dec 2024
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
posted on 9 Aug 2023
The pourstrip is a critical component for support in quality control. Its removal could lead to potential issues in product packaging and quality assurance.
Loss of structural integrity in packaging
Increased risk of contamination or tampering
Difficulty in handling and storage of products
Potential impact on product shelf life and quality
Need for alternative support measures or redesign of packaging
Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking and ensure proper curing.
Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking.
Pour strips are typically used in large concrete pours to control the placement and curing of the concrete.
The timing of pour strips will depend on the size and complexity of the pr...
Shuttering can be managed without removing supports under slab and pourstrip by using adjustable props and beams.
Use adjustable props to support the slab and pourstrip while removing the shuttering.
Install beams to transfer the load from the slab to the props, allowing the supports to be removed.
Ensure proper alignment and spacing of props and beams to distribute the load evenly.
Regularly check and adjust the props and...
Checks in concrete include slump test, air content test, temperature monitoring. At column and slab junction, check for proper reinforcement placement, formwork alignment, and concrete pouring.
Perform slump test to ensure proper consistency of concrete
Check air content to ensure proper durability and workability
Monitor temperature to prevent issues like thermal cracking
At column and slab junction, check reinforcement p...
posted on 6 Jan 2025
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
Production Engineer
10
salaries
| ₹1.5 L/yr - ₹2.9 L/yr |
Quality Engineer
7
salaries
| ₹1.8 L/yr - ₹5.4 L/yr |
QA Engineer
6
salaries
| ₹3 L/yr - ₹3.3 L/yr |
Senior Production Engineer
4
salaries
| ₹4.5 L/yr - ₹7.1 L/yr |
Senior Operations Manager
4
salaries
| ₹14 L/yr - ₹14 L/yr |
Signature Global
Sunteck Realty
Pittie Group
Pin Click