i
Afcons Infrastructure
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Walk-in and was interviewed before Nov 2020. There was 1 interview round.
I applied via Company Website
Electrician test and all questions
I applied via Walk-in and was interviewed in Oct 2023. There was 1 interview round.
ELCB stands for Earth Leakage Circuit Breaker and MCB stands for Miniature Circuit Breaker.
ELCB is a safety device used to protect against electrical shock caused by earth faults.
MCB is a type of circuit breaker that automatically switches off electrical circuits during abnormal conditions.
ELCB detects current leakage to earth and disconnects the circuit, while MCB protects against overloads and short circuits.
MCB (Miniature Circuit Breaker) provides overload protection by automatically switching off the circuit when current exceeds the rated capacity.
MCB trips when current exceeds its rated capacity to prevent overheating and potential fire hazards.
Overload protection is essential to protect electrical appliances and wiring from damage.
Examples of MCB overload protection include tripping when too many devices are connected ...
posted on 12 Jul 2024
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
To decide how to work in safety in electrical equipment
One safety hazard in electrical protection is electric shock.
Electric shock can occur when coming into contact with live electrical parts.
Proper grounding and insulation of electrical equipment is essential to prevent electric shock.
Regular maintenance and inspections of electrical systems can help identify potential hazards.
Using personal protective equipment such as insulated gloves and safety goggles can reduce the ...
I applied via Job Portal and was interviewed in Mar 2022. There was 1 interview round.
Wiring and boards are essential components of electrical systems.
Wiring refers to the physical connections between electrical components.
Boards are used to organize and control the flow of electricity.
Proper wiring and board design are crucial for safety and efficiency.
Examples of boards include circuit breaker panels and control boards for industrial machinery.
posted on 20 Jun 2024
I am most familiar with programming languages such as Python, Java, and C++.
Python
Java
C++
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 11 May 2022
I applied via Company Website and was interviewed in May 2022. There were 3 interview rounds.
Single phase has one live wire and one neutral wire, while three phase has three live wires and one neutral wire.
Single phase is used for smaller loads like household appliances.
Three phase is used for larger loads like industrial machinery.
Single phase has a lower power output compared to three phase.
Three phase is more efficient and cost-effective for high power applications.
Single phase has a voltage of 230V while t...
The kW required for a 2 hp motor depends on the efficiency of the motor.
The efficiency of the motor needs to be known to calculate the kW required.
The formula to calculate kW is kW = hp x 0.746 / efficiency.
Assuming an efficiency of 80%, the kW required for a 2 hp motor would be 1.49 kW.
Electrician ITI NCVT college
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
Senior Engineer
436
salaries
| ₹5 L/yr - ₹18 L/yr |
Planning Engineer
202
salaries
| ₹4.5 L/yr - ₹12 L/yr |
Civil Engineer
191
salaries
| ₹2 L/yr - ₹10.5 L/yr |
Executive Engineer
171
salaries
| ₹3.5 L/yr - ₹11.9 L/yr |
Engineer
164
salaries
| ₹3.5 L/yr - ₹10.3 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA