Upload Button Icon Add office photos

Filter interviews by

Aditya Cement Works Interview Questions and Answers

Updated 14 Apr 2023

Aditya Cement Works Interview Experiences

Popular Designations

4 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Introduce yourself, how u manage crowd, how u manage union, how to get intel, how to make liaison, what is action on accident or incident. How u manage casuality.
  • Ans. What r u doing presently. Which job u doing, what r duty performing. What is salary expectation, why u like to join pvt instead a good govt job in hand.
  • Answered by Sk Tiwari
  • Q2. How much time you take to join, what is your strength, can u adjustment yourself in remote location.
  • Q3. Do u know about Aditya Birla group, Ultratech cement.
  • Q4. Why u shifting from previous job?.
  • Q5. Do u have previous experience in manufacturing industry.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare about yourself, what u have did in past. Always on positive side.

Senior Officer Interview Questions asked at other Companies

Q1. How you can Increase Selling of Banks Products and how you can connect more and more persons With Bank.????
View answer (7)
Round 1 - HR 

(5 Questions)

  • Q1. Past experince and future planing to improve the present work culture.
  • Q2. Salary and expectations..
  • Q3. Planing pertains to have a constant liasioning with local admin.
  • Q4. How to reduce the budget..
  • Ans. 

    To reduce budget, we can analyze expenses, negotiate with vendors, and prioritize spending.

    • Analyze expenses to identify areas where costs can be cut

    • Negotiate with vendors to get better deals and discounts

    • Prioritize spending to focus on essential items and reduce unnecessary expenses

  • Answered by AI
  • Q5. How to control transport activity.
  • Ans. 

    Transport activity can be controlled through proper planning, monitoring, and communication.

    • Develop a transportation plan that includes routes, schedules, and contingency plans.

    • Monitor transportation activities in real-time using GPS tracking and other technologies.

    • Communicate with drivers and other stakeholders to ensure adherence to the transportation plan.

    • Implement safety protocols and training programs to minimize ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aditya Cement Works General Manager interview:
  • Local liasioning with nearbyvillagers
Interview preparation tips for other job seekers - Since Aditya Birla group is a brand name hence wants to hire disciplined , honest and dedicated manpower.Subject knowledge is also a main criteria to face the selection board.be specific and give a proper reply do not go out of track.

General Manager Interview Questions asked at other Companies

Q1. If we do 100% Banking, End of the Month Bank gives us Statement, Which account can be easily tracked from the Statement
View answer (2)

Interview Questionnaire 

3 Questions

  • Q1. Tell me about yourself
  • Q2. Tell me about skills
  • Q3. Tell me about industry

Sales & Marketing Interview Questions asked at other Companies

Q1. 1) what are the benefits of mutual fund and why someone should invest in mutual fund rather than direct equity?
View answer (10)

I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Differences between preventive and predective maintenance.
  • Ans. 

    Preventive maintenance is scheduled maintenance to prevent equipment failure, while predictive maintenance uses data to predict when maintenance is needed.

    • Preventive maintenance is performed on a regular basis to prevent equipment failure.

    • Predictive maintenance uses data and analytics to predict when maintenance is needed.

    • Preventive maintenance is time-based, while predictive maintenance is condition-based.

    • Preventive m...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - During interview be always positive attitude ,good listener,and make a good eye contact with interviewer.

Maintenance Sr.Engineer Interview Questions asked at other Companies

Q1. Differences between preventive and predective maintenance.
View answer (2)

Aditya Cement Works interview questions for popular designations

 General Manager

 (1)

 Maintenance Sr.Engineer

 (1)

 Sales & Marketing

 (1)

 Senior Officer

 (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Diesel Generator: A Reliable Power Source
A diesel generator is a self-contained power generating unit that combines a diesel engine with an electric generator (often an alternator). It's a versatile and widely used source of electricity, particularly in situations where a reliable power supply is crucial.
How Diesel Generators Work
* Diesel Engine: The diesel engine, fueled by diesel fuel, acts as the prime mover. It converts the chemical energy of the fuel into mechanical energy through combustion.
* Electric Generator: The mechanical energy from the engine is transferred to the generator, which converts it into electrical energy. This electrical energy can then be used to power various appliances and equipment.
Applications of Diesel Generators
* Backup Power: Diesel generators are commonly used as backup power sources for homes, businesses, hospitals, and critical infrastructure during power outages.
* Remote Locations: In areas with limited or no access to the grid, diesel generators provide a reliable source of electricity for various applications.
* Construction Sites: Diesel generators power tools and equipment on construction sites, ensuring work can continue even in remote locations.
* Off-Grid Living: Individuals living off the grid often rely on diesel generators for their electricity needs.
* Data Centers: Diesel generators provide backup power to ensure the continuous operation of critical data centers.
Advantages of Diesel Generators
* Reliability: Diesel engines are known for their durability and reliability, making them suitable for demanding applications.
* Fuel Efficiency: Modern diesel engines offer excellent fuel efficiency, reducing operating costs.
* Wide Power Range: Diesel generators are available in a wide range of sizes and power capacities, catering to various needs.
* Easy Maintenance: Diesel generators are relatively easy to maintain and service.
Disadvantages of Diesel Generators
* Noise: Diesel generators can be noisy, which may be a concern in certain settings.

Round 2 - One-on-one 

(3 Questions)

  • Q1. Transformer & protection
  • Q2. Breaker & protection
  • Q3. Motor panel Feeder & protection
Round 3 - One-on-one 

(2 Questions)

  • Q1. Motor & Motor protection
  • Q2. All types panel & protection
  • Ans. 

    Panel and protection systems are essential components in electrical engineering for controlling and safeguarding electrical circuits.

    • Different types of panels include distribution panels, control panels, and instrumentation panels.

    • Protection systems include overcurrent protection, earth fault protection, and differential protection.

    • Panels are used to house electrical components and provide a safe environment for operat...

  • Answered by AI
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Not Selected

I was interviewed in Aug 2024.

Round 1 - Behavioral 

(1 Question)

  • Q1. Stability study you did for API?

Interview Preparation Tips

Interview preparation tips for other job seekers - Completely time waste for me, 7 round of interview. Every intimation come just before 2-3 days time. Facing so much difficulties to take part on every interview, although I did that. My office is 22 km from my office; so you imagine the problem I have faced to come to home at 3 PM, 4 PM etc etc. Every interview they are 3-4 min late, Not only that, they ask to write answer of questions just after interview and told to send via HR the soft copy, this happened twice. Then HR assessment 50 maks behavioral question answer on Sunday and I have to submit by Sunday. Finally after qualifiing all the rounds I have the opportunity to visit Chennai R&D. They given me flight tkt on morning 7AM, Airport is too far from my home how can I reach there so early. Still I managed, I have reached there 8:50 AM My interview started on 12:30 PM.. Director level person asking questions which I don't have any sort of experience or understanding or written in my resume....then why they have selected my resume. Completely disgusting and irritating and disheartening. I will never ever apply Saint Gobain in my entire life, I will not allow my son and even any of my friends to apply Saint Gobain. Terrible organization as per my understanding, thank you God that I have not selected there.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. Why are you Leaving your present company, My opinion is don't week ness your present company Presented to HR
  • Q2. What are you Role seen next Five years in my Prestigious organisation , My opinion is we are do hard work and reaching Sr Manager Quality Post that is my Aim.
Round 2 - Technical 

(2 Questions)

  • Q1. What are you know Tiles IS code
  • Q2. How are you do Materials Testing and Design Mix Preparation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and don't preventive previous Company Week ness,
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. The Electrical technician job description entails participating in independent maintenance related training activities organized by the field operations teams and coordinating shutdowns to ensure that ...
  • Q2. Commercial and Industrial Electrical Maintenance is the process of regularly inspecting, testing, cleaning, and repairing electrical systems and components to ensure they are safe and functioning Prope...
  • Q3. The technician’s role also includes participating in planning, ensuring effective spare parts management, and supervising continuous project improvement.
  • Q4. Electrical technicians perform various functions, depending on the particular operations of the company or organization they work with. However, their role is majorly to ensure effective repairs and mainte...

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical safety
Power suppliers
Electrical troubleshooting
PLC Electrical control panel
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. What are the standards for scaffolding codes?
  • Q2. What are the different types of scaffolding erection?
  • Q3. What type of use material for safety purchase
  • Q4. How to safe Erection
  • Q5. Identify risk and hazard

Interview Preparation Tips

Interview preparation tips for other job seekers - We are erecting scaffolding according to the company's standards.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. AutoCAD question
  • Q2. Autocad related questions
Round 2 - Technical 

(2 Questions)

  • Q1. AutoCAD related questions
  • Q2. AutoCAD related questions
Round 3 - Technical 

(1 Question)

  • Q1. AutoCAD related questions

Aditya Cement Works Interview FAQs

How many rounds are there in Aditya Cement Works interview?
Aditya Cement Works interview process usually has 1-2 rounds. The most common rounds in the Aditya Cement Works interview process are HR and Resume Shortlist.
What are the top questions asked in Aditya Cement Works interview?

Some of the top questions asked at the Aditya Cement Works interview -

  1. Differences between preventive and predective maintenan...read more
  2. How to control transport activi...read more
  3. How to reduce the budge...read more

Tell us how to improve this page.

Aditya Cement Works Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 740 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
KEC International Interview Questions
4.0
 • 297 Interviews
Tata Technologies Interview Questions
3.6
 • 257 Interviews
TCE Interview Questions
3.8
 • 247 Interviews
View all

Aditya Cement Works Reviews and Ratings

based on 6 reviews

4.5/5

Rating in categories

4.4

Skill development

4.4

Work-life balance

4.4

Salary

4.5

Job security

4.4

Company culture

4.4

Promotions

4.4

Work satisfaction

Explore 6 Reviews and Ratings
Senior Engineer
5 salaries
unlock blur

₹7 L/yr - ₹10.5 L/yr

Assistant Manager
4 salaries
unlock blur

₹8 L/yr - ₹14 L/yr

Engineer
3 salaries
unlock blur

₹4.5 L/yr - ₹6 L/yr

Hvac Engineer
3 salaries
unlock blur

₹3.6 L/yr - ₹3.9 L/yr

Explore more salaries
Compare Aditya Cement Works with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview