Manpower in shift can be handled by proper planning, communication, training, and monitoring.
Create a shift schedule that ensures adequate coverage and proper distribution of workload.
Communicate clearly with employees about their shift timings, responsibilities, and expectations.
Provide training to employees on their roles and responsibilities during the shift.
Monitor the performance and productivity of employees duri...
The project involved designing and implementing a new production process to improve efficiency and reduce costs.
Identify areas for improvement in current production process
Research and analyze different production methods and technologies
Design and implement new production process
Test and optimize the new process for efficiency and cost-effectiveness
Overcoming is the act of successfully dealing with or overcoming a challenge, obstacle, or difficulty.
Identifying the challenge or obstacle
Developing a plan or strategy to address it
Taking action to implement the plan
Persisting through setbacks or failures
Learning from the experience to improve future outcomes
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
Motors convert electrical energy into mechanical energy, while generators convert mechanical energy into electrical energy.
Motors use electricity to produce motion, while generators use motion to produce electricity
Motors have a rotor that spins within a stator, while generators have a rotor that is turned by an external force
Examples of motors include electric fans and washing machines, while examples of generators in
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
posted on 10 Apr 2024
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 2 interview rounds.
The list count of vernier caliper is 20.
Vernier caliper has two scales - main scale and vernier scale.
The main scale has 10 divisions, each division is 1 mm.
The vernier scale has 9 divisions, each division is 0.9 mm.
The list count is the number of smallest divisions on the vernier scale that coincide with a division on the main scale.
In case of vernier caliper, the list count is 20.
5S is a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke. 5M is a method for improving workplace safety and efficiency. KPI stands for Key Performance Indicator.
5S focuses on organizing the workplace to improve efficiency and reduce waste.
5M stands for Man, Machine, Material, Method, and Measurement and is used to identify areas for improvement in workp...
I applied via Approached by Company and was interviewed before Sep 2023. There were 2 interview rounds.
I admire your organization's commitment to innovation and sustainability.
Strong focus on innovation in production processes
Commitment to sustainability practices
Positive company culture that values employee growth and development
based on 6 reviews
Rating in categories
Design Engineer
261
salaries
| ₹3.2 L/yr - ₹8.5 L/yr |
Senior Design Engineer
218
salaries
| ₹5 L/yr - ₹11.2 L/yr |
Product Engineer
182
salaries
| ₹7.3 L/yr - ₹17 L/yr |
CAE Engineer
54
salaries
| ₹5.7 L/yr - ₹11.5 L/yr |
Assistant Engineering Manager
48
salaries
| ₹11.5 L/yr - ₹21.5 L/yr |
Faurecia
Lear Corporation
Magna International
Bharat Forge