Filter interviews by
I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.
The 164 notification is a notification sent by a system to alert users of a specific event or action.
The 164 notification typically includes important information or updates that users need to be aware of.
It can be triggered by various events such as system errors, completed tasks, or new messages.
Users may receive the 164 notification through email, text message, or within the system itself.
A winch machine is used for lifting or pulling heavy objects using a motor-driven cable or rope.
Used in construction for lifting heavy materials
Commonly used in off-road vehicles for recovery purposes
Found on boats for raising and lowering anchors
Can be used in forestry for dragging logs
I applied via Walk-in and was interviewed in Oct 2023. There was 1 interview round.
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
Adani Green Energy interview questions for designations
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.
Collect data on equipment usage and fuel consumption
Calculate fuel efficiency by dividing fuel consumption by equipment usage
Compare fuel efficiency across different equipment to identify outliers
Identify factors that may affect fuel efficiency, such as maintenance or operator behavior
Top trending discussions
I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.
Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.
Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.
Collaborated wi...
The working process of a project involves planning, execution, monitoring, and completion.
Planning phase includes defining project goals, scope, and deliverables.
Execution phase involves assigning tasks, managing resources, and implementing the project plan.
Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.
Completion phase involves finalizing deliverables, conducting proj
The question is asking about the process from survey execution to billing and closure.
Survey execution involves designing and distributing surveys to collect data.
Data collected from surveys is then analyzed and processed.
Based on the analysis, billing is done for the services provided.
Finally, the project is closed, and any remaining tasks or documentation are completed.
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Common way of demolition is through controlled implosion.
Controlled implosion is a method where explosives are strategically placed to bring down a structure in a controlled manner.
Another common method is mechanical demolition using equipment like wrecking balls, excavators, or bulldozers.
Selective demolition involves dismantling specific parts of a structure while leaving the rest intact.
Deconstruction is a sustainab...
Vibration time of concrete is the duration for which concrete is vibrated to remove air bubbles and ensure proper compaction.
Vibration time varies based on factors like mix design, slump, size of pour, and type of vibrator used.
Typically, vibration time ranges from 10-30 seconds per foot of concrete thickness.
Over-vibration can lead to segregation of aggregates, while under-vibration can result in honeycombing.
Proper v...
I applied via Referral and was interviewed in Dec 2023. There were 3 interview rounds.
About power plants activities
TPS stands for Transactions Per Second, a metric used to measure the number of transactions processed in a system within a second.
TPS is a key performance indicator for systems handling high volumes of transactions.
It is commonly used in the context of payment processing systems, online banking, and stock trading platforms.
Higher TPS indicates better system performance and scalability.
For example, a payment gateway may...
5S is a methodology used for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate needed tools, parts, and instructions from unneeded items.
Set in order: Arrange items so they are easy to use and label them to eliminate searching.
Shine: Clean the work area and equipment regularly.
Standardize: Establish ...
Interview experience
based on 80 reviews
Rating in categories
Assistant Manager
457
salaries
| ₹5.4 L/yr - ₹16.1 L/yr |
Senior Engineer
328
salaries
| ₹3.5 L/yr - ₹10.7 L/yr |
Deputy Manager
254
salaries
| ₹7.5 L/yr - ₹19.6 L/yr |
Electrical Engineer
175
salaries
| ₹2.5 L/yr - ₹8.5 L/yr |
Engineer
171
salaries
| ₹2.5 L/yr - ₹9 L/yr |
Tata Power
Azure Power
ReNew
Hero Future Energies