i
Ace Designers
Filter interviews by
Clear (1)
I applied via Job Portal and was interviewed before Aug 2022. There was 1 interview round.
Top trending discussions
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
The major cost driver in wiring harness is the cost of raw materials, labor, and complexity of the design.
Cost of raw materials such as copper wires and connectors
Labor costs for assembly and installation
Complexity of the design impacting production time and skill level required
Volume of production affecting economies of scale
I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Sep 2020. There were 4 interview rounds.
I was interviewed in Feb 2017.
I applied via Naukri.com and was interviewed before May 2020. There were 5 interview rounds.
I applied via Referral and was interviewed before Nov 2021. There were 3 interview rounds.
Introduction initiated by 3 people. 2 people starts technical discussion. 1 started managerial discussion
I applied via Naukri.com and was interviewed in Nov 2019. There were 4 interview rounds.
based on 1 interview
Interview experience
Engineer
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Engineer Trainee (Get)
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Bosch
Godrej & Boyce Manufacturing
Larsen & Toubro Limited