I am familiar with various manufacturing processes such as casting, machining, welding, and additive manufacturing.
Casting: involves pouring molten metal into a mold to create a desired shape
Machining: involves removing material from a workpiece to achieve the desired shape and size
Welding: involves joining two or more pieces of metal by melting them together
Additive manufacturing: involves building a part layer by lay
Heavy fabrication rate refers to the cost or rate at which heavy fabrication work is done.
Heavy fabrication rate can vary depending on the complexity of the project, materials used, and location.
Factors such as labor costs, equipment costs, and overhead expenses can also impact the heavy fabrication rate.
For example, the heavy fabrication rate for a large steel structure may be higher than the rate for a smaller projec...
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
posted on 25 Feb 2022
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
A prolongation claim can be prepared by identifying the additional costs incurred due to delays and providing evidence to support the claim.
Identify the cause of delay and the impact it had on the project timeline and budget
Document all additional costs incurred due to the delay, including labor, materials, and equipment
Provide evidence to support the claim, such as daily reports, change orders, and correspondence with...
Delay analysis involves identifying the causes of delay and determining their impact on the project timeline.
Identify the critical path of the project
Determine the planned vs actual timeline for each activity
Identify any changes or disruptions that occurred during the project
Quantify the impact of each delay on the project timeline
Use a recognized methodology such as the As-Planned vs As-Built or Time Impact Analysis
Co...
I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.
posted on 28 Dec 2020
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Design Executive
29
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Design Engineer
25
salaries
| ₹2.1 L/yr - ₹5 L/yr |
Quality Executive
11
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Purchase Engineer
11
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Assembly Fitter
10
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
GAMMON INDIA
Karam Industries
Ray Engineering
MaRS Planning & Engineering Services