i
Aarvee Associates
Filter interviews by
Water content and specific gravity are important parameters in soil analysis.
Water content refers to the amount of water present in soil, expressed as a percentage of the soil's total weight.
Specific gravity is the ratio of the density of a substance to the density of a reference substance (usually water) at a specific temperature.
Water content affects the soil's physical properties, such as its ability to retain moist...
Soil degradation refers to the decline in soil quality and fertility due to various factors.
It is caused by factors such as erosion, deforestation, overuse of chemical fertilizers, and pollution.
Soil degradation leads to reduced agricultural productivity, loss of biodiversity, and increased vulnerability to droughts and floods.
Examples of soil degradation include desertification in arid regions, soil erosion from inten...
A borehole is a narrow, deep hole drilled into the ground to extract water, oil, gas, or minerals.
Boreholes are commonly used for water supply in areas where surface water is scarce.
They can also be used for geothermal energy extraction.
Boreholes are typically drilled using specialized equipment, such as rotary drilling rigs.
The depth of a borehole can vary depending on its purpose, ranging from a few meters to several...
Liquid limit and plastic limit are soil properties used to determine the behavior of soil under different moisture conditions.
Liquid limit is the moisture content at which a soil transitions from a liquid to a plastic state.
Plastic limit is the moisture content at which a soil transitions from a plastic to a semi-solid state.
These limits are determined through laboratory tests using specific apparatus and procedures.
Th...
Top trending discussions
I applied via LinkedIn and was interviewed in Oct 2023. There was 1 interview round.
V/F speed control is a method of controlling the speed of an AC motor by varying the frequency and voltage supplied to the motor.
V/F speed control is commonly used in applications where precise speed control is not required, such as fans, pumps, and conveyor belts.
By adjusting the frequency and voltage supplied to the motor, the speed of the motor can be controlled without the need for complex control systems.
This meth...
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
Medium tough level test, strong basics required in all fields of civil.
A float can be made zero in critical path tasks by reducing the duration of non-critical tasks.
Identify non-critical tasks that have float
Shorten the duration of non-critical tasks to eliminate float
Focus on tasks that have the highest float value to reduce overall project duration
Baseline schedule is the original planned schedule for a project, used as a reference point for tracking progress.
Baseline schedule is created at the beginning of a project to establish the original plan for project activities and timelines.
It serves as a benchmark for comparing actual progress and identifying deviations from the original plan.
Changes to the baseline schedule may require formal approval and documentati...
I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.
It was around 10 minutes long and questioning was about Civil structures related as Bending moment etc.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
326
salaries
| ₹3.6 L/yr - ₹11 L/yr |
Manager
119
salaries
| ₹6.5 L/yr - ₹19 L/yr |
Field Engineer
119
salaries
| ₹1.6 L/yr - ₹4.2 L/yr |
Site Engineer
93
salaries
| ₹2.7 L/yr - ₹6.6 L/yr |
Civil Engineer
84
salaries
| ₹2.7 L/yr - ₹7.8 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International