Water content and specific gravity are important parameters in soil analysis.
Water content refers to the amount of water present in soil, expressed as a percentage of the soil's total weight.
Specific gravity is the ratio of the density of a substance to the density of a reference substance (usually water) at a specific temperature.
Water content affects the soil's physical properties, such as its ability to retain moist...
Soil degradation refers to the decline in soil quality and fertility due to various factors.
It is caused by factors such as erosion, deforestation, overuse of chemical fertilizers, and pollution.
Soil degradation leads to reduced agricultural productivity, loss of biodiversity, and increased vulnerability to droughts and floods.
Examples of soil degradation include desertification in arid regions, soil erosion from inten...
A borehole is a narrow, deep hole drilled into the ground to extract water, oil, gas, or minerals.
Boreholes are commonly used for water supply in areas where surface water is scarce.
They can also be used for geothermal energy extraction.
Boreholes are typically drilled using specialized equipment, such as rotary drilling rigs.
The depth of a borehole can vary depending on its purpose, ranging from a few meters to several...
Liquid limit and plastic limit are soil properties used to determine the behavior of soil under different moisture conditions.
Liquid limit is the moisture content at which a soil transitions from a liquid to a plastic state.
Plastic limit is the moisture content at which a soil transitions from a plastic to a semi-solid state.
These limits are determined through laboratory tests using specific apparatus and procedures.
Th...
Top trending discussions
I applied via LinkedIn and was interviewed in Oct 2023. There was 1 interview round.
V/F speed control is a method of controlling the speed of an AC motor by varying the frequency and voltage supplied to the motor.
V/F speed control is commonly used in applications where precise speed control is not required, such as fans, pumps, and conveyor belts.
By adjusting the frequency and voltage supplied to the motor, the speed of the motor can be controlled without the need for complex control systems.
This meth...
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
Medium tough level test, strong basics required in all fields of civil.
A float can be made zero in critical path tasks by reducing the duration of non-critical tasks.
Identify non-critical tasks that have float
Shorten the duration of non-critical tasks to eliminate float
Focus on tasks that have the highest float value to reduce overall project duration
Baseline schedule is the original planned schedule for a project, used as a reference point for tracking progress.
Baseline schedule is created at the beginning of a project to establish the original plan for project activities and timelines.
It serves as a benchmark for comparing actual progress and identifying deviations from the original plan.
Changes to the baseline schedule may require formal approval and documentati...
I applied via Referral and was interviewed in May 2023. There were 3 interview rounds.
Some building material questions
I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.
It was around 10 minutes long and questioning was about Civil structures related as Bending moment etc.
I applied via Campus Placement and was interviewed in Jan 2024. There was 1 interview round.
It was quiet easy test.
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
Interview experience
based on 1 review
Rating in categories
Assistant Manager
215
salaries
| ₹3 L/yr - ₹10.1 L/yr |
Field Engineer
131
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Manager
125
salaries
| ₹6.5 L/yr - ₹19 L/yr |
Site Engineer
90
salaries
| ₹2.7 L/yr - ₹7 L/yr |
Engineer
68
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Megha Engineering & Infrastructures
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company