Upload Button Icon Add office photos

Aarti Industries

Compare button icon Compare button icon Compare

Filter interviews by

Aarti Industries Mechanical Maintenance Engineer Interview Questions, Process, and Tips

Updated 14 Dec 2023

Top Aarti Industries Mechanical Maintenance Engineer Interview Questions and Answers

View all 7 questions

Aarti Industries Mechanical Maintenance Engineer Interview Experiences

2 interviews found

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Last company you worked in?
  • Ans. 

    I worked at XYZ Company, a manufacturing firm specializing in automotive components.

    • Responsible for conducting preventive maintenance on production machinery

    • Troubleshoot and repair mechanical issues on equipment

    • Collaborated with production team to ensure minimal downtime

    • Implemented new maintenance procedures to improve efficiency

  • Answered by AI
  • Q2. Why you left last job?
  • Ans. In recession period i lost my job. My company was facing financial crises from last 6 months and finally they given lay off to 41 emoloyees in single day.
  • Answered Anonymously
  • Q3. Are you ready to relocate or daily updown fir job?
  • Ans. 

    Yes, I am willing to relocate or commute daily for the job.

    • I am open to relocating for the right opportunity.

    • I am willing to commute daily if necessary.

    • I understand the importance of flexibility in the job market.

  • Answered by AI
  • Q4. What are your salary expectations?
  • Q5. As per company policy and my experience.
  • Q6. Where are you currently located?
Round 3 - Technical 

(12 Questions)

  • Q1. Tell me about yourself.
  • Ans. I done it in marathi. Name, experience, education and currently going upskilling courses and my family background. (I think he was not ready to listen or take interview as he kept his camera off in googlelive interaction and asked me to make my camera on. )
  • Answered Anonymously
  • Q2. What equipments are you handled?
  • Ans. 

    I have handled a wide range of equipment in my role as a Mechanical Maintenance Engineer.

    • Pumps and compressors

    • Conveyors and material handling equipment

    • Boilers and heat exchangers

    • HVAC systems

    • Generators and power distribution systems

    • Machine tools and production equipment

    • Hydraulic and pneumatic systems

    • Crane and lifting equipment

    • Instrumentation and control systems

  • Answered by AI
  • Q3. Why did you leave your last company?
  • Ans. Company was going through financial crises and given 41 employees lay off at that time. (Please mention recession period instead of saying above. As he want to listen only & only corporate world technical words)
  • Answered Anonymously
  • Q4. Why your performance was not good?
  • Ans. I once again replied with same companies financial crises situation from last six months.
  • Answered Anonymously
  • Q5. How many employees from department got lay off?
  • Q6. I replied with 3 out of 6 including our manager.
  • Q7. What was product of your last company?
  • Ans. I replied with intermediate pharmaceutical , nucleoside, speciality chemical and petroleum products. (He manager was intersted in pharmaceutical exp only)
  • Answered Anonymously
  • Q8. If i opened centrifugal pump tell?
  • Ans. 

    When opening a centrifugal pump, it is important to follow proper procedures to ensure safety and prevent damage.

    • Before opening the pump, ensure that it is isolated from the power source and all pressure has been relieved.

    • Inspect the pump for any signs of damage or wear, such as leaks, cracks, or excessive vibration.

    • Check the pump's impeller and casing for any debris or blockages that may affect its performance.

    • If nece...

  • Answered by AI
  • Q9. How the vacuum created in steam ejector?
  • Ans. 

    Vacuum is created in a steam ejector through the principle of jet propulsion.

    • Steam ejectors use high-pressure steam to create a low-pressure environment.

    • The steam enters the nozzle of the ejector and expands, creating a high-velocity jet.

    • This high-velocity jet entrains and compresses the surrounding gas or vapor, reducing its pressure.

    • The entrained gas or vapor is then discharged through the diffuser, creating a vacuum...

  • Answered by AI
  • Q10. Due to high steam from ventury the cycloids is created in entering area in very quick time so creating vacuum. (Don't tell "keep it short and simple" Pattern. Tell in theory way in velocity and pressure ...
  • Q11. 1 torr=? Mmof hg
  • Ans. 

    1 torr is equal to 0.03937 mm of Hg.

    • 1 torr is a unit of pressure equal to 1/760th of standard atmospheric pressure.

    • mm of Hg is a unit of pressure commonly used in vacuum systems.

    • To convert torr to mm of Hg, multiply by 0.03937.

    • Example: 1 torr = 1 * 0.03937 mm of Hg = 0.03937 mm of Hg.

  • Answered by AI
  • Q12. 759 mm of hg
  • Ans. 

    759 mm of hg is a unit of pressure measurement.

    • mm of hg is a common unit used to measure pressure.

    • 759 mm of hg is equivalent to 1012.8 millibars or 14.1 pounds per square inch (psi).

    • It is often used in meteorology to measure atmospheric pressure.

    • In mechanical maintenance, it can be used to monitor pressure in systems or equipment.

    • For example, if a pressure gauge reads 759 mm of hg, it indicates the pressure exerted by

  • Answered by AI
Round 4 - Technical 

(3 Questions)

  • Q1. Tell me about parameters you observed in clean room area.
  • Ans. 

    In a clean room area, parameters observed include air quality, temperature, humidity, particle count, and pressure differentials.

    • Air quality is monitored to ensure low levels of contaminants.

    • Temperature is controlled to maintain a stable environment for sensitive equipment.

    • Humidity levels are regulated to prevent moisture-related issues.

    • Particle count is measured to ensure cleanliness and prevent contamination.

    • Pressure...

  • Answered by AI
  • Q2. TELL ME ABOUTE AHU
  • Ans. It is Air handling unit used for providing specific or required condition in clean room area for that filters of 10,5 & 0.5 micron installed. It is consisting of cooling and heating lined over which filtered air is allowed to pass through damper system.
  • Answered Anonymously
  • Q3. Tell me mechanical seal types.
  • Ans. 

    Mechanical seal types include cartridge seals, component seals, and bellows seals.

    • Cartridge seals are pre-assembled units that are easy to install and replace.

    • Component seals are made up of separate rotating and stationary parts.

    • Bellows seals use a flexible metal bellows to provide a dynamic seal.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Use only english language for interview as manager may not know how & what to ask in marathi language.
Use technical words like run out of shaft, clean room area, etc what I miss in.
Reactor parts full details and it will be better for each to have equipment details too.
Prefer face to face interview rather than google live as manager will not turn on camera and ask you to keep your camera on so you will feel like giving interview.

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Vacuum pumps
  • Q2. Centrifugal pumps

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident and answer it correctly

Mechanical Maintenance Engineer Interview Questions Asked at Other Companies

Q1. What is valve and its types What is coupling and it's types Pump ... read more
Q2. 1. Types of Pump 2. Types of casing 3. Plant process 4. Major mai ... read more
asked in Sodexo
Q3. Types of mechanical seal and how to take mechanical seal number
Q4. How much thikness wire rope used in 15 ton e.o.t crane
Q5. what is pump? types of pump how to do pump overhauling ? types of ... read more

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jan 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Any vacancy ur your company supervisor, technician??
  • Q2. Can u try my interview.?
  • Q3. Any vacancy in technician, supervisor ??
  • Q4. Please I work ur company can u try.?

Interview Preparation Tips

Interview preparation tips for other job seekers - I have 6,7 year experience with maintenance job.
I me working hear technician post..
I mean Diploma electrical engineering.
So I can try new company join..
So please can u try interview in your company.

Interview Questionnaire 

3 Questions

  • Q1. About reactor and it's maintenance, Hoist preventive maintenance, Gearbox
  • Q2. How to do preventive of water seal
  • Ans. 

    Preventive maintenance of water seal involves regular inspection, cleaning, and replacement of worn-out parts.

    • Inspect water seal regularly for signs of wear and tear

    • Clean water seal and surrounding area to prevent buildup of debris

    • Replace worn-out parts such as gaskets and O-rings

    • Ensure proper lubrication of moving parts

    • Monitor water levels and pressure to prevent leaks

    • Train operators on proper use and maintenance of w

  • Answered by AI
  • Q3. How we select different gearboxes
  • Ans. 

    Gearboxes are selected based on torque, speed, power, and application requirements.

    • Determine the required torque and speed for the application

    • Select a gearbox with a suitable gear ratio to achieve the desired output speed and torque

    • Consider the power requirements and ensure the gearbox can handle the load

    • Choose a gearbox with the appropriate mounting and shaft configuration for the application

    • Examples of gearboxes incl

  • Answered by AI

Senior Engineer Interview Questions & Answers

SRF user image Veeravalli Lakshmiprasad

posted on 17 Oct 2019

I applied via Naukri.com and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. R22 production
  • Q2. HCl scrubbing,Neutralisation column
  • Q3. Distillation columns,compressors and their trouble shooting

Interview Preparation Tips

Interview preparation tips for other job seekers - On Aug 17,2019..I attended an interview for the post of Senior Production Engineer in SRF,Dahej,Gujarat.I am fortunate enough that I have got very similar process experience that what SRF is manufacturing.Being a professional chemical engineer for 7 years in Hindustan Fluorocarbons Ltd,I answered almost all the questions for what the interview panel had asked me.Infact I prepared for more Monomer plant questions but they confined to R22 plant only.Then later asked about my family background and raised concerns about my relocation to gujarat for the reason being that my wife works in Infosys,Hyderabad.My wife has the facility to work from home hence I assured them of my relocation to Gujarat if given the opportunity.But HR Divya Chauhan has put it ON HOLD for the same reason.Thanks for their wonderful hospitality and flight charges reimbursement.Definitely one day I will join in SRF and explore myself to the better challenges.

I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Turbine operation activities
  • Ans. 

    Turbine operation activities involve monitoring and controlling the performance of turbines in power plants.

    • Monitoring turbine speed, temperature, and pressure

    • Adjusting turbine controls to maintain optimal performance

    • Performing routine maintenance and inspections

    • Troubleshooting and repairing turbine malfunctions

    • Collaborating with other engineers and technicians to ensure safe and efficient operation

  • Answered by AI
  • Q2. Power Plant Description
  • Ans. 

    A power plant is a facility that generates electricity by converting various forms of energy into electrical energy.

    • Power plants can use various sources of energy such as coal, natural gas, nuclear, hydro, wind, and solar.

    • The energy is converted into electrical energy through various processes such as combustion, steam turbines, and generators.

    • Power plants are typically divided into two categories: base load plants and...

  • Answered by AI
  • Q3. Hrsg bolier & ges fule etc work
  • Q4. Cooling Tower etc work
  • Q5. Turbine fild work etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Turbine operation & field operation work
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. GLR, pump, compressor, cooling tower, Graphite type heat exchanger
  • Q2. Inlet temp and out let temp

Interview Preparation Tips

Interview preparation tips for other job seekers - Glass line reactor, chiller, cooling tower, pump, compressor,
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Include aptitude questions

Round 2 - One-on-one 

(1 Question)

  • Q1. Basic questions and questions related to your feild

Interview Preparation Tips

Topics to prepare for Atul Assistant Manager interview:
  • Communication Skills
Interview preparation tips for other job seekers - Be confident and give your best
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Domain related questions
  • Q2. Previous job related questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Introduction & Personal questions

Round 2 - HR 

(2 Questions)

  • Q1. Process regarding & cross question
  • Q2. HTO & MTO question
Round 3 - Technical 

(2 Questions)

  • Q1. Package & work responsibility
  • Q2. Others

Interview Preparation Tips

Interview preparation tips for other job seekers - I like this company policy bheviour & work culture.

Aarti Industries Interview FAQs

How many rounds are there in Aarti Industries Mechanical Maintenance Engineer interview?
Aarti Industries interview process usually has 4 rounds. The most common rounds in the Aarti Industries interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in Aarti Industries Mechanical Maintenance Engineer interview?

Some of the top questions asked at the Aarti Industries Mechanical Maintenance Engineer interview -

  1. Tell me about parameters you observed in clean room ar...read more
  2. If i opened centrifugal pump te...read more
  3. How the vacuum created in steam eject...read more

Tell us how to improve this page.

Aarti Industries Mechanical Maintenance Engineer Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

SRF Interview Questions
4.2
 • 178 Interviews
UPL Interview Questions
4.1
 • 174 Interviews
PI Industries Interview Questions
4.0
 • 105 Interviews
Atul Interview Questions
3.9
 • 83 Interviews
Deepak Nitrite Interview Questions
4.0
 • 43 Interviews
View all
Aarti Industries Mechanical Maintenance Engineer Salary
based on 36 salaries
₹3.3 L/yr - ₹6.3 L/yr
5% less than the average Mechanical Maintenance Engineer Salary in India
View more details

Aarti Industries Mechanical Maintenance Engineer Reviews and Ratings

based on 6 reviews

4.2/5

Rating in categories

4.4

Skill development

4.1

Work-life balance

4.0

Salary

4.0

Job security

3.9

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 6 Reviews and Ratings
Assistant Manager
608 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
579 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive
525 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Plant Operator
338 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
321 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Aarti Industries with

Vinati Organics

4.0
Compare

Atul

3.9
Compare

Navin Fluorine International

3.9
Compare

Solvay Specialities

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview