Filter interviews by
Billing engineering is the process of calculating and preparing invoices for construction projects.
It involves analyzing project costs and creating detailed invoices for clients.
Billing engineers ensure that all costs are accurately recorded and billed to the client.
They also work closely with project managers and accountants to ensure that invoices are prepared in a timely manner.
Examples of tasks include preparing pr...
A billing engineer is responsible for preparing and submitting invoices for construction projects.
Prepares and submits invoices for construction projects
Calculates costs and quantities of materials used
Ensures accuracy of billing information
Communicates with clients and project managers
Tracks project expenses and progress
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 23 Oct 2020
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
posted on 20 Nov 2020
I applied via Campus Placement and was interviewed before Nov 2019. There were 5 interview rounds.
Escalation is the increase in cost or price of goods or services over time due to various factors.
Escalation is significant in construction projects where the cost of materials and labor can increase over time.
It is important to factor in escalation when creating project budgets and timelines.
The formula for escalation is: Escalated Cost = Base Cost x (1 + Escalation Rate)^Number of Years
For example, if the base cost o...
Penalty is a punishment for breach of contract while liquidity damages compensate for financial loss due to breach.
Penalty is a fixed amount agreed upon in the contract as a punishment for breach of contract.
Liquidity damages compensate for the actual financial loss suffered due to breach of contract.
Penalty is usually higher than the actual loss suffered while liquidity damages are calculated based on the actual loss.
...
Basic Price variation refers to the change in the cost of materials or labor used in a project.
Basic Price variation is a common clause in construction contracts.
It allows for adjustments to the contract price based on changes in the cost of materials or labor.
The variation can be positive or negative, depending on whether the cost has increased or decreased.
The variation is usually calculated using an agreed-upon form...
Yes, basic price variation is beneficial for a contract.
Basic price variation allows for adjustments to be made to the contract price based on changes in market conditions or material costs.
This helps to ensure that the contractor is not unfairly burdened with unexpected costs and can maintain profitability.
It also provides a level of transparency and accountability in the contract, as both parties are aware of the pot...
There are various types of contracts in construction projects. Each has its own advantages and drawbacks.
Types of contracts include lump sum, cost-plus, time and material, and unit price contracts.
Lump sum contracts provide a fixed price for the entire project, but can lead to disputes over changes.
Cost-plus contracts reimburse the contractor for all costs plus a fee, but can lead to inflated costs.
Time and material co...
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
based on 1 review
Rating in categories
Site Engineer
9
salaries
| ₹2.3 L/yr - ₹7.8 L/yr |
Senior Engineer
4
salaries
| ₹4.2 L/yr - ₹5.8 L/yr |
Junior Engineer
4
salaries
| ₹2.2 L/yr - ₹3.9 L/yr |
Civil Site Engineer
4
salaries
| ₹1.7 L/yr - ₹3.8 L/yr |
Civil Engineer
4
salaries
| ₹2 L/yr - ₹3.1 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies