Q301. In your civil building works, there is any pre-stressed & Pre-cast concrete works are proposed
Yes, pre-stressed and pre-cast concrete works are commonly proposed in civil building projects for their structural benefits and efficiency.
Pre-stressed concrete involves applying compressive stresses to the concrete before it is subjected to loads, increasing its strength and durability.
Pre-cast concrete elements are manufactured off-site and then transported to the construction site for assembly, saving time and labor costs.
Examples of pre-stressed concrete elements include...read more
Q302. BBS of as per drawing and shuttering coast and time bond
BBS refers to Bar Bending Schedule which is used to calculate the steel reinforcement required in a concrete structure. Shuttering cost and time bond are related to the formwork used for casting concrete.
BBS is important to ensure the strength and durability of the concrete structure.
Shuttering cost and time bond are important factors to consider in the overall project cost and timeline.
Proper planning and execution of formwork can save time and money in the construction proc...read more
Q303. Details of pile works, pile cap works, steel structure, PEB structure and structural design.
Pile works involve driving piles into the ground to provide foundation support. Pile cap works are used to distribute loads from the structure to the piles. Steel and PEB structures are types of building frameworks, with PEB being pre-engineered. Structural design involves creating plans for the building's framework and support system.
Pile works involve driving piles (concrete, steel, timber) into the ground to support the foundation of a structure.
Pile cap works are construc...read more
Q304. Give details of electrical power distribution works you have carried out.
I have managed electrical power distribution works for various projects.
Managed the installation and maintenance of electrical distribution systems
Coordinated with contractors and engineers to ensure compliance with safety regulations
Developed project plans and schedules for power distribution projects
Oversaw the procurement of materials and equipment for electrical works
Conducted regular inspections and tests to ensure proper functioning of power distribution systems
Q305. Give details on different tools you have used in MEP designing.
I have used various tools in MEP designing including AutoCAD, Revit, Navisworks, and Trimble.
AutoCAD - Used for creating 2D drawings and drafting.
Revit - Used for creating 3D models and generating construction documents.
Navisworks - Used for clash detection and coordination among different MEP disciplines.
Trimble - Used for accurate field measurements and layout.
Other tools - Used Excel for calculations, Bluebeam for document management, and BIM 360 for collaboration.
Q306. How can manage prOjet and team?
To manage a project and team effectively, a project manager must have strong leadership skills, clear communication, and the ability to prioritize tasks and delegate responsibilities.
Establish clear goals and objectives for the project
Create a detailed project plan with defined tasks, timelines, and resources
Assign roles and responsibilities to team members based on their skills and expertise
Communicate regularly with the team to provide updates, address concerns, and ensure ...read more
Share interview questions and help millions of jobseekers 🌟
Q307. How did you improve project profits margins
I improved project profit margins by implementing cost-saving measures, negotiating better vendor contracts, and optimizing resource allocation.
Identified and eliminated unnecessary expenses
Negotiated lower prices with vendors for materials and services
Optimized resource allocation to reduce waste and improve efficiency
Q308. How would you do asset management
Asset management involves tracking and optimizing the lifecycle of assets to maximize their value and minimize costs.
Create an inventory of all assets, including their details and current condition
Implement a system to track the location and movement of assets
Establish maintenance schedules and procedures to ensure assets are well-maintained
Monitor asset performance and usage to identify opportunities for optimization
Implement strategies for asset disposal or replacement when...read more
Project Manager Jobs
Q309. Project Managements methodology, Am I familiar with?
Yes, I am familiar with various project management methodologies such as Agile, Waterfall, Scrum, and Lean.
Agile methodology focuses on iterative development and collaboration between cross-functional teams.
Waterfall methodology follows a linear sequential approach to project management.
Scrum is a framework within which people can address complex adaptive problems, while productively and creatively delivering high value products.
Lean methodology aims to minimize waste and max...read more
Q310. What is the cost persft of residential building?
The cost per sqft of residential building varies depending on location, materials used, and other factors.
The cost per sqft can range from $100 to $500 or more.
Location plays a big role in determining the cost per sqft.
Materials used also affect the cost per sqft.
Other factors like labor costs, permits, and design complexity can also impact the cost per sqft.
Q311. Grades of concrete, Grades of steel, Types of cement, Is RMC or manual concreting economical??
The grades of concrete, steel, and types of cement affect the cost of RMC or manual concreting.
Higher grades of concrete and steel increase the cost of both RMC and manual concreting.
Different types of cement have varying costs and may affect the overall cost of the project.
RMC may be more economical for larger projects with consistent concrete needs, while manual concreting may be more cost-effective for smaller projects or those with irregular concrete needs.
Factors such as...read more
Q312. You have become a jumping frog by switching companys
I have gained valuable experience and skills by working in different companies.
I have adapted to different work environments and cultures
I have learned to quickly understand new processes and systems
I have developed a diverse skill set by working on various projects
I have built a strong network of professionals in different industries
Q313. How to process the waste material?
Waste material can be processed through methods such as recycling, composting, and waste-to-energy technologies.
Separate waste into different categories for recycling
Compost organic waste to create nutrient-rich soil
Utilize waste-to-energy technologies to convert waste into electricity or heat
Q314. What we get after process of waste?
After the process of waste, we get byproducts, recycled materials, energy, and compost.
Byproducts such as methane gas or ash can be generated from waste processing
Recycled materials like paper, plastic, glass, and metal can be recovered from waste
Energy can be produced through waste-to-energy processes like incineration or anaerobic digestion
Compost can be created from organic waste through decomposition
Q315. How would you facilitate estimations for a sprint?
I would facilitate estimations for a sprint by involving the team in a collaborative process, using techniques like Planning Poker.
Involve the entire team in the estimation process to ensure buy-in and accuracy
Use techniques like Planning Poker to facilitate collaborative estimation
Break down user stories into smaller tasks for more accurate estimations
Consider historical data and team velocity when making estimations
Q316. Technology management what does that mean?
Technology management involves the planning, implementation, and maintenance of technology systems and infrastructure.
It includes identifying technology needs and goals
Developing strategies to meet those needs and goals
Selecting and implementing appropriate technology solutions
Managing and maintaining technology systems and infrastructure
Ensuring security and compliance with regulations
Examples include managing a company's IT department or overseeing the implementation of a n...read more
Q317. What agile methodologies have you implemented?
I have implemented Scrum and Kanban methodologies in previous projects.
Implemented Scrum framework for daily stand-up meetings, sprint planning, and retrospectives
Utilized Kanban board for visualizing workflow and tracking progress
Facilitated regular backlog grooming sessions to prioritize tasks and user stories
Q318. What is homologation, and why is it required?
Homologation is the process of certifying that a product meets the regulatory standards and requirements set by a governing body.
Homologation ensures that products are safe, reliable, and meet quality standards before they can be sold in the market.
It involves testing and certification processes to verify compliance with regulations.
Examples include vehicle homologation to ensure cars meet safety and emissions standards before being sold to consumers.
Q319. Have you done survey of any site ?
Yes, I have conducted surveys of various sites for project planning and execution.
Conducted surveys to gather information on site conditions, constraints, and opportunities
Used various tools and techniques such as GPS, laser levels, and drone mapping
Analyzed survey data to identify potential risks and opportunities for project success
Presented survey findings to project stakeholders and incorporated feedback into project plans
Q320. Have you prepared any tender documents?
Yes, I have prepared tender documents.
I have prepared tender documents for various projects in my previous roles.
I am familiar with the process of creating a comprehensive tender document that includes project scope, timelines, budget, and evaluation criteria.
I have also worked with legal teams to ensure that the tender documents comply with all relevant laws and regulations.
One example of a tender document I prepared was for a construction project that required detailed spec...read more
Q321. How many types of insulators have ?
There are several types of insulators used in various industries and applications.
Porcelain insulators
Glass insulators
Polymer insulators
Ceramic insulators
Composite insulators
Silicone rubber insulators
Air gap insulators
Pin insulators
Suspension insulators
Post insulators
Q322. MS project views and project management principles
MS Project views help visualize project data, while project management principles guide the planning and execution of projects.
MS Project views such as Gantt Chart, Task Sheet, and Resource Sheet help in visualizing project timelines, tasks, and resource allocation.
Project management principles like defining scope, setting objectives, creating a schedule, and monitoring progress are essential for successful project execution.
Using MS Project views in conjunction with project ...read more
Q323. What is the Role of SME's ?
SMEs play a crucial role in providing specialized knowledge and expertise to guide project teams.
SMEs provide subject matter expertise and guidance to project teams.
They contribute their specialized knowledge to ensure project success.
SMEs help in defining project requirements and identifying potential risks.
They assist in developing project plans and strategies.
SMEs collaborate with project managers to ensure effective communication and coordination.
Examples of SMEs include ...read more
Q324. How does smart meter comunicate ?
Smart meters communicate using various technologies such as cellular, Wi-Fi, Zigbee, and power line communication.
Smart meters use cellular networks to communicate with the utility company's servers.
Wi-Fi is used for communication between the smart meter and the home area network (HAN).
Zigbee is a wireless communication protocol used for communication between smart meters and other devices in the HAN.
Power line communication (PLC) uses the existing power lines to transmit dat...read more
Q325. what kind of reports were shared to clients ?
Various project status reports, budget reports, risk assessment reports, and progress reports were shared with clients.
Project status reports detailing current progress and milestones achieved
Budget reports outlining financial expenditures and forecasts
Risk assessment reports identifying potential risks and mitigation strategies
Progress reports showcasing overall project advancement and timelines
Client feedback reports summarizing feedback received and action items taken
Q326. Flushing method of chilled water and testing commission of hvac system
Flushing method and testing commissioning of HVAC system involves removing debris and ensuring proper functioning.
Flushing method involves circulating a cleaning solution through the system to remove debris and contaminants.
Testing commissioning involves checking all components of the HVAC system to ensure they are functioning properly.
Proper flushing and testing commissioning are essential for the efficient operation of the HVAC system and to prevent issues in the future.
Q327. How much temperature require for cover plate melt
The temperature required for a cover plate to melt depends on the material of the cover plate.
The melting temperature of different materials varies.
Common cover plate materials include plastic, metal, and glass.
Plastic cover plates typically melt at temperatures around 150-200 degrees Celsius.
Metal cover plates have higher melting points, ranging from 1000-1500 degrees Celsius.
Glass cover plates have even higher melting points, typically above 1500 degrees Celsius.
Q328. Challenges faced Process Improvement ideas Use case discussion
Challenges faced, process improvement ideas, and use case discussion for Project Manager role
Challenges faced: managing stakeholder expectations, resource allocation, and project scope
Process improvement ideas: implementing agile methodologies, automating manual processes, and improving communication channels
Use case discussion: discussing a recent project and identifying areas for improvement based on feedback from stakeholders
Q329. DOD vs DOR vs acceptance criteria
DOD vs DOR vs acceptance criteria
Definition: DOD (Definition of Done) is a checklist of criteria that a product must meet before it can be considered complete.
Definition: DOR (Definition of Ready) is a checklist of criteria that a user story must meet before it can be worked on.
Acceptance Criteria: Specific conditions that a product must meet to be accepted by the customer.
DOD ensures the quality of the final product, DOR ensures the readiness of a user story for development,...read more
Q330. Can you explain various workflow techniques?
Workflow techniques are methods used to streamline and optimize the flow of work within a project.
One popular workflow technique is Agile, which focuses on iterative development and collaboration.
Another technique is Waterfall, where tasks are completed sequentially in a linear fashion.
Kanban is a visual workflow technique that emphasizes limiting work in progress and continuous delivery.
Scrum is a framework that involves small, self-organizing teams working in sprints to del...read more
Q331. How much weight is taken in design of structure.
The weight taken in the design of a structure depends on various factors such as the type of structure, materials used, and intended use.
The weight of the structure is a crucial consideration in the design process as it affects the structural integrity and safety.
Different types of structures have different weight requirements. For example, a bridge needs to be designed to support the weight of vehicles and pedestrians.
The materials used in the construction also impact the we...read more
Q332. What is refrigeration cycle? Commissioning stages of Data center?
The refrigeration cycle is a process that removes heat from a space and transfers it to the external environment.
The refrigeration cycle consists of four main components: compressor, condenser, expansion valve, and evaporator.
The compressor compresses the refrigerant gas, raising its temperature and pressure.
The high-pressure refrigerant then flows to the condenser, where it releases heat to the surroundings and condenses into a liquid.
The liquid refrigerant passes through th...read more
Q333. Team Management & Scenarios for Team management in different different situation
Effective team management involves adapting to different scenarios and situations.
Understand the strengths and weaknesses of team members
Communicate clearly and regularly with the team
Delegate tasks based on individual skills and interests
Provide support and resources to help team members succeed
Address conflicts and challenges promptly and professionally
Adjust management style to fit the needs of the team and project
Examples: remote team management, cross-functional team man...read more
Q334. Tell me about cam and follower mechanism and types
A cam and follower mechanism is a mechanical system where a cam rotates and imparts motion to a follower.
Cam is a rotating element that gives motion to the follower
Follower is a sliding or rotating element that follows the motion of the cam
Types of cam and follower mechanisms include: radial cam, plate cam, and cylindrical cam
Applications include engines, pumps, and printing presses
Q335. What is cost and financial management
Cost and financial management involves planning, controlling, and monitoring project expenses to ensure they stay within budget.
Developing a detailed budget for the project
Tracking expenses and comparing them to the budget
Identifying cost-saving opportunities
Forecasting future expenses
Ensuring financial resources are allocated efficiently
Analyzing financial data to make informed decisions
Q336. How you will manage escalation and stakeholders
I will establish clear communication channels and protocols to manage escalation and stakeholders effectively.
Identify potential issues and stakeholders involved
Establish communication channels and protocols for escalation
Regularly update stakeholders on project progress and any issues
Address stakeholder concerns promptly and transparently
Involve stakeholders in decision-making process when appropriate
Maintain positive relationships with stakeholders
Examples: weekly status me...read more
Q337. Items wise rate and labour rate and covering rate as per area
The question is asking for the rates of items, labor, and coverage per area.
Items rate refers to the cost of materials needed for the project.
Labor rate refers to the cost of the workers involved in the project.
Covering rate refers to the amount of area that can be covered by the materials.
Examples of items rate include the cost of cement, steel, and wood.
Examples of labor rate include the cost of carpenters, electricians, and plumbers.
Examples of covering rate include the ar...read more
Q338. How did you save logs to Azure from function APP?
Logs can be saved to Azure from a Function App by using Azure Application Insights or Azure Blob Storage.
Use Azure Application Insights to automatically collect and store logs from the Function App.
Configure the Function App to send logs to Azure Blob Storage by writing logs to a storage account.
Utilize Azure Monitor to view and analyze the logs stored in Azure Blob Storage.
Q339. How to controlled scope of work
Scope of work can be controlled by defining clear objectives, creating a detailed project plan, and monitoring progress regularly.
Define clear objectives and deliverables
Create a detailed project plan with timelines and milestones
Identify potential risks and develop contingency plans
Regularly monitor progress and adjust the plan as needed
Communicate changes and updates to stakeholders
Q340. What are the tests for bearing capacity of soil
Tests for bearing capacity of soil include Standard Penetration Test, Cone Penetration Test, Plate Load Test, and Shear Strength Test.
Standard Penetration Test measures the resistance of soil to penetration by a standard sampler driven by a standard weight.
Cone Penetration Test measures the resistance of soil to penetration by a cone with a standard base area and a standard rate of penetration.
Plate Load Test measures the load-carrying capacity of soil by applying a load to a...read more
Q341. What is oop(object oriented programming)
OOP is a programming paradigm that organizes code into objects with properties and behaviors.
OOP focuses on creating reusable code through the use of classes and objects.
It emphasizes encapsulation, inheritance, and polymorphism.
Example: In Java, a class represents a blueprint for creating objects with defined attributes and methods.
Q342. What are important terminologies of Scrum?
Important Scrum terminologies include Product Backlog, Sprint, Daily Standup, Sprint Review, Sprint Retrospective.
Product Backlog
Sprint
Daily Standup
Sprint Review
Sprint Retrospective
Q343. What is WSJF? How to calculate that?
WSJF stands for Weighted Shortest Job First. It is a prioritization technique used in Agile development.
WSJF helps in prioritizing the backlog items based on their business value, time criticality, risk reduction, and opportunity enablement.
The formula to calculate WSJF is (Business Value + Time Criticality + Risk Reduction + Opportunity Enablement) / Job Size.
The higher the WSJF score, the higher the priority of the backlog item.
WSJF is used to ensure that the team is workin...read more
Q344. Do you agree for background verification?
Yes, I agree for background verification.
I understand the importance of background verification in ensuring the credibility and trustworthiness of employees.
I have nothing to hide and am confident in my professional history and qualifications.
I am willing to provide any necessary documentation or information for the verification process.
Q345. How do to track project progress?
Project progress can be tracked through regular status updates, milestone tracking, and using project management tools.
Regular status updates from team members to track tasks completed and any roadblocks
Tracking milestones to ensure project is on schedule
Utilizing project management tools like Gantt charts or Kanban boards to visualize progress
Conducting regular meetings to discuss progress and address any issues
Using key performance indicators (KPIs) to measure project succe...read more
Q346. How do you contribute to Profit Margin?
I contribute to profit margin by optimizing project timelines, reducing costs, and maximizing resources.
Optimizing project timelines to ensure efficient use of resources
Reducing costs through effective budget management and negotiation with vendors
Maximizing resources by assigning tasks effectively and utilizing team members' strengths
Implementing cost-saving measures such as automation or process improvements
Identifying and capitalizing on opportunities for revenue generatio...read more
Q347. How do you track project progress?
I track project progress using project management software, regular status meetings, progress reports, and milestone tracking.
Utilize project management software to track tasks, timelines, and milestones
Hold regular status meetings with team members to discuss progress and address any issues
Generate progress reports to provide stakeholders with updates on project status
Track milestones to ensure project is on schedule and within budget
Q348. What is the lifecycle of a project?
The project lifecycle consists of initiation, planning, execution, monitoring and controlling, and closing phases.
Initiation: Define the project, set goals, and obtain approval.
Planning: Develop a roadmap, allocate resources, and create a schedule.
Execution: Implement the plan, manage resources, and communicate progress.
Monitoring and Controlling: Track performance, make adjustments, and address issues.
Closing: Finalize deliverables, obtain acceptance, and close out the proje...read more
Q349. What is the process of transformer testing?
Transformer testing involves various tests to ensure the transformer's performance and safety.
Routine tests include turns ratio test, insulation resistance test, and winding resistance test.
Type tests include temperature rise test, short-circuit test, and impulse test.
Special tests may include noise level test, partial discharge test, and dielectric tests.
Testing is crucial to ensure the transformer meets specifications and standards for efficiency and safety.
Q350. Are you familiar with SaaS product offering?
Yes, SaaS stands for Software as a Service which is a cloud-based software delivery model.
SaaS products are accessed through the internet and do not require installation on local devices.
SaaS products are subscription-based and offer scalability and flexibility.
Examples of SaaS products include Salesforce, Dropbox, and Google Apps.
Interview Questions of Similar Designations
Top Interview Questions for Project Manager Related Skills
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month