Premium Employer

i

This company page is being actively managed by Adani Group Team. If you also belong to the team, you can get access from here

Adani Group Verified Tick

Compare button icon Compare button icon Compare
3.9

based on 1.4k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern
filter salaries All Filters

722 Adani Group Jobs

Assistant Manager - Cell Maintenance

4-8 years

₹ 5.4 - 18.03L/yr (AmbitionBox estimate)

tooltip
This is an estimate of the average salary range for this position. It has not been reviewed by the company, and the actual salary may differ.

Gujarat

Assistant Manager - Cell Maintenance

Adani Group

posted 16hr ago

Job Role Insights

Flexible timing

Job Description

Purpose/Objective

    To Manage and handle the shift as Shift Incharge in Cell Maintenance department with the following requirement : 1)Should have very good exposure on Manufacturing facility at larger scale. 2)Improving OEE, TPM Activities, and process stability. 3)Responsible for Machine Up time, Breakthrough improvements and spare parts management. 4)Provide resources for implementing identified action plan to minimize down time.

Key Responsibilities of Role

    • Around 04~08 years of relevant experience in Machine / Plant Maintenance. • Incumbent shall be responsible for maintaining Equipment up time. • Solving machine breakdowns during shift. • Responsible for Safety of self and subordinates during shift, following all established safety SOPs. • Responsible for QMS in Compliance with ISO 9000:2008. •Knowlege of PLC drives, Scada and Vaccuum pumps• Cluster InCharge. • Maintaining and updating shift activity MIS. • Managing manpower in shift. • planning and undertaking Preventive maintenance • supervising engineering and technical staff• Making SOPs • Repairing of faulty Equipment parts. • Fill all daily/PM check sheets. • Ensuring Implementation of Corrective & Preventive Actions (CAPA).

Technical Competencies

    Understanding of technical specifications of equipment. ,Thorough knowladge of Machines / Equipments ,PLC/Robotics/Drives (AC &DC)/Automation,Pneumatic / Vacuum system ,Knowledge of SAP ,Vendor Management,Inventory Management

Qualifications and Experience

    Educational Qualification: M. Tech. / BE / B. Tech. Experience: 4-8Years

Employment Type: Full Time, Permanent

Read full job description

Adani Group Interview Questions & Tips

Prepare for Adani Group Assistant Manager roles with real interview advice

Top Adani Group Assistant Manager Interview Questions

Q1. What IS Codes do you follow for structural steel fabrication and erection works?
View answers (13)
Q2. Did you fabricate Built Up Sections? If yes, please explain the requirement of Built Up sections over Rolled Sections? What are the common p ... read more
View answers (6)
Q3. Please explain briefly the step wise process of fabrication and erection of a storage tank as per standard API code.
View answers (2)
View all 9 questions

What people at Adani Group are saying

3.6
 Rating based on 133 Assistant Manager reviews

Likes

No work only relax

Dislikes

A hell lot of politics. If you can please your manager then only you’ll get promotion and appraisals. Very low increment. HR first promote themselves then look for other departments promotions.

Read 133 reviews

Assistant Manager salary at Adani Group

reported by 749 employees
₹4.6 L/yr - ₹15 L/yr
23% more than the average Assistant Manager Salary in India
View more details

What Adani Group employees are saying about work life

based on 1.4k employees
51%
70%
47%
97%
Flexible timing
Monday to Saturday
No travel
Day Shift
View more insights

Adani Group Benefits

Submitted by Company
Job Training
Health Insurance
Soft Skill Training
Cafeteria
Submitted by Employees
Health Insurance
Job Training
Soft Skill Training
Free Transport
Cafeteria
Team Outings +6 more
View more benefits

Compare Adani Group with

Reliance Industries

4.0
Compare

Tata Group

4.2
Compare

Bharti Enterprises

3.8
Compare

Hindustan Unilever

4.2
Compare

Infosys

3.7
Compare

Wipro

3.7
Compare

Mahindra & Mahindra

4.1
Compare

ITC

4.0
Compare

HDFC Bank

3.9
Compare

Bajaj Group

3.8
Compare

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

Torrent Power

3.8
Compare

Tata Power

4.0
Compare

Eaton Corporation

4.0
Compare

Reliance Power

4.1
Compare

L&T Power

3.9
Compare

Hitachi Energy

4.1
Compare

Tata Power Solar

4.1
Compare

Inox Wind

3.8
Compare

Similar Jobs for you

Maintenance Coordinator at Eurotec Engineering Corporation

Navi Mumbai

2-7 Yrs

₹ 1.75-3 LPA

Maintenance Executive at Agrostarc Pvt. Ltd.

Virar

2-7 Yrs

₹ 3-7 LPA

Maintenance Engineer at Nipro India Corporation

Pune

4-6 Yrs

₹ 4.5-5 LPA

Mechanical Maintenance Engineer at Dalmia Cement

Lanka

2-6 Yrs

₹ 4-6 LPA

Maintenance Incharge at Jaipuria Institute of Management Studies

Ghaziabad

4-7 Yrs

₹ 2-3 LPA

Maintenance Incharge at Jaipuria Institute of Management Studies

Ghaziabad

4-7 Yrs

₹ 2-3 LPA

Assistant Manager Electrical Maintenance at Piaggio

Baramati

5-10 Yrs

₹ 4-8 LPA

Instrument Engineer at Dalmia Cement

Lanka

2-6 Yrs

₹ 4-6 LPA

Electrical Maintenance Engineer at Dalmia Cement

Lanka

3-7 Yrs

₹ 4.5-6.5 LPA

Senior Engineer at LE Mei Plastic Manufacturing

Noida, Greater Noida

6-11 Yrs

₹ 3.75-7 LPA

Adani Group Ahmedabad Office Location

View all
Ahmedabad Office
Headquarter
Shantigram, Near Vaishnodevi Circle, S G Highway, Ahmedabad-382421, Gujarat, India Ahmedabad
382421

Assistant Manager - Cell Maintenance

4-8 Yrs

Gujarat

21hr ago·via naukri.com

Deputy Manager - Locomotive

0-17 Yrs

Gonda

19hr ago·via naukri.com

Associate Lead Civil

3-6 Yrs

Hyderabad / Secunderabad

19hr ago·via naukri.com

Deputy Manager - S&T

0-17 Yrs

Gonda

19hr ago·via naukri.com

Graduate Trainee - C&I Maintenance

0-1 Yrs

Gonda

19hr ago·via naukri.com

Design Coordinator (Civil)

7-12 Yrs

Gurgaon / Gurugram

19hr ago·via naukri.com

Industrial Practice Lead

14-14 Yrs

Kolkata

19hr ago·via naukri.com

Deputy Manager -Safety Raipur

5-12 Yrs

Raipur

19hr ago·via naukri.com

Deputy Manager - Quality Assurance & Control

11-14 Yrs

Mumbai

19hr ago·via naukri.com

Estimation Engineer - MEP

5-6 Yrs

Ahmedabad

19hr ago·via naukri.com
write
Share an Interview