Filter interviews by
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
A vernier is a type of scale used for precise measurements in engineering and machining.
Vernier scales are used to measure small distances with high accuracy.
They consist of a main scale and a sliding vernier scale that allows for interpolation of measurements.
The working principle of a vernier involves aligning the zero marks of the main scale and vernier scale to obtain a precise reading.
Vernier calipers and micromet...
AC and DC currents differ in terms of direction and usage. Basic electrical components include resistors, capacitors, inductors, and diodes.
AC current changes direction periodically, while DC current flows in one direction constantly
AC current is used for household appliances and power distribution, while DC current is used in batteries and electronic devices
Basic electrical components include resistors (limit current ...
I applied via Approached by Company
I applied via Referral and was interviewed in Apr 2024. There were 2 interview rounds.
Defect prevention can be achieved through various methods such as implementing quality control processes, conducting thorough inspections, and continuous improvement efforts.
Implementing quality control processes to catch defects early on
Conducting thorough inspections at various stages of production
Utilizing statistical process control to monitor and improve processes
Implementing error-proofing techniques to prevent h...
Yazaki interview questions for popular designations
I applied via Campus Placement
Get interview-ready with Top Yazaki Interview Questions
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
posted on 12 Dec 2024
I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing breakdowns and improving overall equipment efficiency.
It involves regular maintenance, cleaning, and inspection of equipment.
TPM also includes training employees to take better care of equipment and involve them in maintenance activities.
Example: Implementing TPM in a ...
Yes, I am proficient in Excel macros and have experience using them in PPC management.
I have created automated reports using Excel macros to streamline PPC campaign analysis.
I have used Excel macros to manipulate large sets of data for keyword research and bid management.
I am comfortable writing and editing VBA code to enhance the functionality of Excel macros.
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
Top trending discussions
The duration of Yazaki interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 161 interviews
Interview experience
based on 2.3k reviews
Rating in categories
Junior Engineer
511
salaries
| ₹1.5 L/yr - ₹5.3 L/yr |
Assistant Manager
392
salaries
| ₹4.8 L/yr - ₹13.8 L/yr |
Engineer
313
salaries
| ₹1.8 L/yr - ₹7.4 L/yr |
Senior Engineer
298
salaries
| ₹3.8 L/yr - ₹10 L/yr |
Production Engineer
296
salaries
| ₹1.2 L/yr - ₹7 L/yr |
Bosch
Samvardhana Motherson Group
MRF Tyres
Ceat Tyres