Upload Button Icon Add office photos

Filter interviews by

WTP Cost Management India Interview Questions, Process, and Tips

Updated 6 Dec 2024

Top WTP Cost Management India Interview Questions and Answers

WTP Cost Management India Interview Experiences

Popular Designations

8 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What's your full name 🤣🤣
  • Q2. How early and convincingly join the company 🤣🤣

Interview Preparation Tips

Topics to prepare for WTP Cost Management India Intermediate Quantity Surveyor interview:
  • Self motives
Interview preparation tips for other job seekers - They are short of manpower. No one ready to join them due hectic and toxic work culture. Very easy interview process and they will try to convince you to join company throughout all the process 🤣🤣
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. General question about work experience,
  • Q2. Notice periord, expected ctc
Round 2 - One-on-one 

(2 Questions)

  • Q1. Question about code books
  • Q2. Market rates, boq rates

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Explain Refrigeration cycle
  • Ans. 

    Refrigeration cycle is a process in which a refrigerant absorbs heat from a low-temperature space and releases it in a high-temperature space.

    • The refrigeration cycle consists of four main components: compressor, condenser, expansion valve, and evaporator.

    • The refrigerant enters the compressor as a low-pressure gas and leaves as a high-pressure, high-temperature gas.

    • In the condenser, the refrigerant releases heat and cha...

  • Answered by AI
  • Q2. How to create BOQ
  • Ans. 

    Creating a Bill of Quantities involves breaking down construction project into items with quantities and costs.

    • Start by analyzing the project drawings and specifications to identify all the elements and materials required.

    • Measure and quantify each item accurately using standard measurement units.

    • Organize the items into trade categories for easier reference.

    • Assign unit rates or prices to each item based on market rates ...

  • Answered by AI

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 11 Jan 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. All subjects discussing
  • Q2. Water treatment plant
  • Q3. WTP/STP/ETP/RO plant

Interview Preparation Tips

Topics to prepare for WTP Cost Management India Site Engineer interview:
  • WTP
  • Water Treatment Plant
  • WWTP
Interview preparation tips for other job seekers - Mechanical engineering department and working on WTP/STP/ETP/RO plant regarding problems

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (3)

WTP Cost Management India interview questions for popular designations

 Quantity Surveyor

 (4)

 Assistant Manager

 (1)

 Intermediate Quantity Surveyor

 (1)

 Junior Quantity Surveyor

 (1)

 Site Engineer

 (1)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Assignment 

Assignment round interview is just to check you drawing interpretation skills and drafting skills.

Interview Preparation Tips

Topics to prepare for WTP Cost Management India Quantity Surveyor interview:
  • AutoCAD
Interview preparation tips for other job seekers - Good place to work for a fresher.

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Basics of civil engineering
Round 3 - Technical 

(4 Questions)

  • Q1. AutoCAD and Excel. Your will be given a drawing. your task is to capture all the quantity related to Construction and type and share the summary and quantity in a excel sheet. Respective TL will review and...
  • Q2. Method of measurement for a wall paint
  • Ans. 

    The method of measurement for wall paint is typically calculated in square meters.

    • Measure the length and height of the wall to be painted

    • Multiply the length and height to get the total square meters

    • Take into account any doors or windows that will not be painted

    • Calculate the amount of paint needed based on the square meter measurement

    • Consider the type of paint and number of coats needed for accurate measurement

  • Answered by AI
  • Q3. Types of foundations and their uses
  • Ans. 

    Foundations are the base of any structure. They are classified based on the type of soil and the load-bearing capacity of the structure.

    • Shallow foundations: used for light structures on stable soil

    • Deep foundations: used for heavy structures on unstable soil

    • Spread footings: used for individual columns or walls

    • Mat foundations: used for large structures with heavy loads

    • Pile foundations: used for structures on soft soil or...

  • Answered by AI
  • Q4. Why have your chosen this field of civil engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - One of good platforms for civil engineering.
Fully a desk based job. You will not be full time site candidate.

Junior Quantity Surveyor Interview Questions asked at other Companies

Q1. method of measurement for a wall paint
View answer (1)

Jobs at WTP Cost Management India

View all
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About mep packages
Round 2 - One-on-one 

(1 Question)

  • Q1. In detail of QS practises

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Interview Questionnaire 

1 Question

  • Q1. What is distance between 2 sprinklers
  • Ans. 

    The distance between 2 sprinklers depends on the type of sprinkler and the area it needs to cover.

    • The distance between sprinklers can vary depending on the type of sprinkler head used.

    • The area that needs to be covered by the sprinklers also affects the distance between them.

    • For example, a rotary sprinkler may have a distance of 15-30 feet between each head, while a spray sprinkler may have a distance of 8-15 feet.

    • The d...

  • Answered by AI

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Interview questions from similar companies

Interview Preparation Tips

Round: Resume Shortlist
Experience: I was fulfilling their criteria of 60% through out the academics.

Round: Test
Experience: Aptitude was easy. It contained basics of Quants & Logic . Verbal or English part was bit difficult and length. There was a sectional time and sectional cut off.

Round: Interview
Experience: There was only one interview. Both Technical and HR questions were asked in the same interview. Prepare puzzles from the book Puzzles to puzzle you by Shakuntala Devi. This book helped me a lot. Technical questions were very basic but nearly from every subject.

General Tips: BE CONFIDENT. Speak Confident in Interview even if you are not good with ur english.
Skills: English language, Communication Skills, Reasoning Abilities
College Name: Jawaharlal Nehru Engineering College Aurangabad

Assistant Trainee Interview Questions & Answers

TCS user image YATISH KUMAR KESHWANI

posted on 9 Feb 2015

Interview Questionnaire 

22 Questions

  • Q1. What are the subjects you have command in?
  • Q2. Tell me about your final year project?
  • Q3. Tell me about the industrial training you had?
  • Q4. How does an induction motor works?
  • Q5. Why motor is rated in KW whereas Transformer and generator in KVA?
  • Ans. 

    Motors are rated in KW because they consume power, while transformers and generators are rated in KVA because they produce power.

    • Motors convert electrical energy into mechanical energy, so they consume power and are rated in KW.

    • Transformers and generators produce electrical energy, so they are rated in KVA based on their apparent power.

    • KVA takes into account both the real power (KW) and the reactive power (KVAR) produc...

  • Answered by AI
  • Q6. What is the type of motor used in ceiling fans?
  • Ans. 

    The type of motor used in ceiling fans is an induction motor.

    • Ceiling fans typically use single-phase induction motors.

    • These motors are designed to provide a constant speed and are efficient in converting electrical energy into mechanical energy.

    • The motor consists of a stator and a rotor, with the stator being the stationary part and the rotor being the rotating part.

    • The stator contains windings that create a rotating m...

  • Answered by AI
  • Q7. Hoe does a thermal power plant works?
  • Ans. 

    A thermal power plant generates electricity by converting heat energy into mechanical energy.

    • Thermal power plants use fossil fuels or nuclear energy to heat water and produce steam.

    • The steam drives a turbine, which is connected to a generator that produces electricity.

    • The heat source can be coal, natural gas, oil, or nuclear reactions.

    • The steam is condensed back into water and recycled in a closed-loop system.

    • Thermal p...

  • Answered by AI
  • Q8. Write a program to make a GP
  • Ans. 

    A program to generate a geometric progression (GP).

    • Take the first term, common ratio and number of terms as input.

    • Use a loop to calculate each term of the GP.

    • Print the generated GP as output.

  • Answered by AI
  • Q9. Write a program to print factorial using recursion
  • Ans. 

    A program to print factorial using recursion

    • Define a function to calculate factorial recursively

    • Base case: if the number is 0 or 1, return 1

    • Recursive case: multiply the number with factorial of (number - 1)

    • Print the factorial of a given number

  • Answered by AI
  • Q10. Write the logic to reverse a string without using string fnctions
  • Ans. 

    Logic to reverse a string without using string functions

    • Iterate through the string from the last character to the first

    • Create a new string and append each character to it in reverse order

  • Answered by AI
  • Q11. Tell me about yourself?
  • Q12. What are your hobbies?
  • Q13. Apart from your technical pat and studies what have you done in college?
  • Q14. What do you prefer, ethics or values?
  • Q15. Suppose you are working in office and somebody came and slapped you, what will you do?
  • Q16. Tell me about yourself for 5 minutes
  • Q17. What are your views about Mr. Narendra Modi as PM of India
  • Q18. Any extra curricular activities you have participated in school or college
  • Q19. What are your strengths?
  • Q20. What are your weaknesses?
  • Q21. Being an Electrical engineer why do you want to join an IT company
  • Q22. What do you know about TCS?

Interview Preparation Tips

Round: Test
Experience: In email writing one question was given describing the situation and maximum word limit. It has the keywords given to be used. 1 question, 10 minutes.This section is generally used to check your verbal ability. Make sure to use all the keywords given and complete it within time, with no spelling mistakes of course. Missing a keyword or a spelling mistake could be your goodbye to qualified list.The second section had 30 questions of quantitative aptitude. Duration 70 mins. There are questions from various sections, such as Time and speed, Time and distance, Data interpretation,etc.There are 2-3 star marked questions which have more weight-age. There my also be a dummy question who doesn't have any matching answer. Make sure uh don't attempt these questions.26-27 questions is the cut-off for qualified list.But you have to do the email writing part correctly.
Tips: Practice email writing online from various websites such as technicalbaba.com, indiageeks.comPractice quantitative aptitude as it is a must in any interview you will face. you can use R.S.Agarwal or CAT material.
Duration: 90 minutes
Total Questions: 30 + 1

Round: Interview
Experience: Greeting the interviewer is a must. Be confident and enthusiastic. Have your resume properly ready. Technical questions from your subject will be asked. Not a must that you should know any programming language like C, C++, JAVA.
Tips: Prepare 3-4 subjects of your core branch. Never try to flatter the interviewer. Be confident and answer the questions appropriately. Dont say directly " I DON'T KNOW". Atleast try even if you dont know the answer.

Round: Interview
Experience: There are certain questions which doesnt have direct answers. You have to be diplomatic about them. You should be able to see all the possible situation when a question like that is asked.

Round: Interview
Experience: The HR head may manipulate you, try to stress you, etc. Be calm and confident.Think before you speak. Prepare your answers before hand for general questions. Write your introduction on a paper and prepare it well so that you speak it confidently...
Tips: Be yourself. Be confident. Never argue with the interviewer.All the best

General Tips: Be presentable in the interview. Wear a watch. Show respect to the interviewer. Prepare 3-4 technical subjects well. Read last 15 days newspaper. Be confident when you speak. Improve your English if you are weak in it.
Skill Tips: ""
Skills: Verbal ability, Attitude, Technical knowledge, General knowledge
College Name: IMS ENGINEERING COLLEGE, GHAZIABAD
Motivation: TCS is a semi government company with a decent package and high job security.

Skills evaluated in this interview

WTP Cost Management India Interview FAQs

How many rounds are there in WTP Cost Management India interview?
WTP Cost Management India interview process usually has 2 rounds. The most common rounds in the WTP Cost Management India interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for WTP Cost Management India interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at WTP Cost Management India. The most common topics and skills that interviewers at WTP Cost Management India expect are Quantity Surveying, Tendering, Budgeting, Cost Estimation and MEP.
What are the top questions asked in WTP Cost Management India interview?

Some of the top questions asked at the WTP Cost Management India interview -

  1. What is distance between 2 sprinkl...read more
  2. method of measurement for a wall pa...read more
  3. types of foundations and their u...read more

Tell us how to improve this page.

WTP Cost Management India Interview Process

based on 9 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Deloitte Interview Questions
3.8
 • 2.9k Interviews
PwC Interview Questions
3.4
 • 1.4k Interviews
Ernst & Young Interview Questions
3.4
 • 1.1k Interviews
KPMG India Interview Questions
3.5
 • 804 Interviews
Grant Thornton Interview Questions
3.7
 • 99 Interviews
Protiviti Interview Questions
3.2
 • 55 Interviews
RSM India Interview Questions
3.4
 • 53 Interviews
BDO Interview Questions
3.3
 • 45 Interviews
Crowe Horwath Interview Questions
4.1
 • 28 Interviews
View all

WTP Cost Management India Reviews and Ratings

based on 54 reviews

3.8/5

Rating in categories

3.5

Skill development

3.5

Work-life balance

3.3

Salary

3.9

Job security

3.7

Company culture

3.4

Promotions

3.5

Work satisfaction

Explore 54 Reviews and Ratings
Civil Cost Manager Interior Fit Out

Gandhinagar

5-7 Yrs

₹ 6-9 LPA

Senior Cost Manager-Civil

Mumbai

6-10 Yrs

Not Disclosed

MEP Senior Quantity Surveyor

Bangalore / Bengaluru

12-17 Yrs

Not Disclosed

Explore more jobs
Intermediate Quantity Surveyor
52 salaries
unlock blur

₹4.8 L/yr - ₹8.5 L/yr

Quantity Surveyor
44 salaries
unlock blur

₹2 L/yr - ₹8 L/yr

Junior Quantity Surveyor
30 salaries
unlock blur

₹2.4 L/yr - ₹4.5 L/yr

Senior Quantity Surveyor
24 salaries
unlock blur

₹6.5 L/yr - ₹13.1 L/yr

Manager Costing
16 salaries
unlock blur

₹6.2 L/yr - ₹13 L/yr

Explore more salaries
Compare WTP Cost Management India with

KPMG India

3.5
Compare

Deloitte

3.8
Compare

PwC

3.4
Compare

Ernst & Young

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview