Filter interviews by
Various instruments used in CNC machine operation
Calipers for measuring dimensions of workpieces
Micrometers for precise measurements
Dial indicators for checking alignment
Edge finders for locating edges of workpieces
Tool setters for setting tool lengths
Depth gauges for measuring depths of holes
Probes for automated part inspection
I applied via LinkedIn and was interviewed in Jun 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
They told to draw table in excel sheet
Top trending discussions
I appeared for an interview in Sep 2016.
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Graduated with a degree in Computer Science
Passionate about coding and problem-solving
Completed internships at tech companies
Participated in coding competitions
posted on 28 Jun 2024
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
Risk assessment involves identifying hazards, evaluating risks, implementing control measures, and reviewing effectiveness.
Identify hazards present in the workplace
Evaluate the risks associated with each hazard
Implement control measures to reduce or eliminate risks
Review the effectiveness of the control measures
Document the risk assessment process and findings
The machine total station can be set up using the bech mark as a reference point.
Place the total station over the bech mark.
Level the instrument using the built-in bubble level.
Enter the coordinates of the bech mark into the total station.
Perform a backsight measurement to the bech mark.
Perform a foresight measurement to the desired point.
Record the data and repeat for additional points.
Adjust the instrument as necessa
I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
PR stands for Purchase Request. It is a formal request made by an organization to purchase goods or services.
The PR process starts with the identification of a need for goods or services.
The requestor fills out a PR form with details such as the item description, quantity, and estimated cost.
The PR is then reviewed and approved by the relevant department or personnel.
Once approved, the PR is sent to the procurement dep...
I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
LOTO stands for Lockout/Tagout. It is a safety procedure used in industrial settings to ensure that dangerous machines are properly shut off and not started up again until maintenance or repair work is completed.
LOTO involves placing a lock and tag on the energy-isolating device of a machine to prevent accidental or unauthorized startup.
It is important to follow LOTO procedures to prevent injuries and fatalities.
Exampl...
I applied via Naukri.com
based on 3 interviews
Interview experience
based on 85 reviews
Rating in categories
Quality Engineer
19
salaries
| ₹3 L/yr - ₹6.3 L/yr |
Planning Engineer
17
salaries
| ₹2.8 L/yr - ₹5.8 L/yr |
Design Engineer
15
salaries
| ₹3 L/yr - ₹7.5 L/yr |
QC Engineer
12
salaries
| ₹3.2 L/yr - ₹7.5 L/yr |
Project Engineer
11
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Sterling Oil Exploration & Energy Production
Kuwait National Petroleum Company
Arabian Industries
Madina Group