Filter interviews by
Different types of heat exchangers include shell and tube, plate, finned tube, and double pipe.
Shell and tube heat exchanger
Plate heat exchanger
Finned tube heat exchanger
Double pipe heat exchanger
FEED stands for Front End Engineering Design.
FEED is a phase in the project development process where the basic engineering of a project is conducted before detailed design.
It helps in defining the scope, budget, and schedule of a project.
FEED is essential for identifying potential issues early on and minimizing risks.
Examples of FEED documents include process flow diagrams, equipment lists, and preliminary layouts.
Challenges in procurement process include supplier management, cost control, and supply chain disruptions.
Supplier management - Ensuring timely delivery, quality control, and relationship management.
Cost control - Balancing quality and price, negotiating contracts, and managing budget constraints.
Supply chain disruptions - Dealing with delays, shortages, and unexpected events like natural disasters or political issues.
I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.
Design parameters for steel structure
Load capacity and distribution
Material strength and durability
Environmental factors such as wind and seismic activity
Connection details and joint design
Fire resistance and protection measures
I have 5 years of exposure to STAAD software.
I have used STAAD for various structural analysis and design projects.
I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.
I have experience in using STAAD for seismic analysis and design of structures.
I have also used STAAD for foundation design and analysis.
I keep myself updated with the latest versions and features of STAAD so
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
posted on 22 Feb 2022
I applied via LinkedIn and was interviewed in Oct 2022. There were 3 interview rounds.
I appeared for an interview in Nov 2023.
Commercial criteria for awarding orders include price, quality, delivery time, payment terms, and supplier reputation.
Price competitiveness is a key factor in awarding orders.
Quality of the product or service being offered is crucial.
Delivery time must meet the buyer's requirements.
Favorable payment terms can influence the decision.
Supplier reputation for reliability and customer service is important.
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Tell us about yourself, type of questions
I appeared for an interview before Jun 2021.
DCA and PLC are commonly used acronyms in the field of engineering.
DCA stands for Direct Current Amplifier, which is a device used to amplify direct current signals.
PLC stands for Programmable Logic Controller, which is a digital computer used for automation of electromechanical processes.
DCA and PLC are essential components in various engineering applications such as industrial automation and control systems.
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Accountant
223
salaries
| ₹5 L/yr - ₹9 L/yr |
Process Engineer
114
salaries
| ₹4.8 L/yr - ₹11.2 L/yr |
Billing Accountant
102
salaries
| ₹5.5 L/yr - ₹9.5 L/yr |
Accounts Payable Accountant
68
salaries
| ₹5 L/yr - ₹8.2 L/yr |
Payroll Administrator
65
salaries
| ₹5.3 L/yr - ₹13 L/yr |
Baker Hughes
Schlumberger
Halliburton
TechnipFMC