Upload Button Icon Add office photos

Filter interviews by

William Hare Junior Detailer Interview Questions and Answers

Updated 12 Nov 2022

William Hare Junior Detailer Interview Experiences

1 interview found

I applied via LinkedIn and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Ther are 3 round of aptitude test related to the job after this the tool test will be conducted.

Round 3 - Technical 

(2 Questions)

  • Q1. Technical round need to create model
  • Q2. After that HR interview will be conducted.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the interview they will ask about the projects.

Interview questions from similar companies

Interview Preparation Tips

Round: Resume Shortlist
Experience: CGPA will be a criterion for initial shortlist. A well-written and edited resume helps a lot.

Round: Test
Experience: There are two parts with structural and construction management/architecture with basic questions like bending moment, influence lines from structural and on planning and scheduling, site layout, identification of parts of building components, concrete technology from construction management.

Round: Interview
Experience: In interview questions were all based on the resume, internship and BTP as both matched the work profile.

College Name: IIT Madras
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it

I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffrence between quantity survey and billing
  • Ans. 

    Quantity survey involves estimating and managing costs of construction projects while billing is the process of invoicing clients for work done.

    • Quantity survey involves cost estimation, cost control, and cost management of construction projects.

    • Billing is the process of invoicing clients for work done on a project.

    • Quantity surveyors work closely with architects, engineers, and contractors to ensure that projects are co...

  • Answered by AI
  • Q2. Asking what type of work you did there

Interview Preparation Tips

Interview preparation tips for other job seekers - Before attending interview , to learn your field related things.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me M25 ratio
  • Ans. 

    M25 ratio refers to the mix ratio of concrete, commonly used in construction projects.

    • M25 ratio is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This mix is commonly used for structural concrete works like columns, beams, and slabs.

    • The strength of concrete with M25 ratio is typically around 25 megapascals after 28 days of curing.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. As usual like previous experiences, qualifications, present Company, Present CTC, Expected CTC, etc.
  • Q2. As per my actual executions
Round 3 - Technical 

(2 Questions)

  • Q1. Asked about Rate Analysis, BOQ preparation, EOT proposal, Structure Quantities, Structure Knowledge, Highway Knowledge, etc.
  • Q2. As answered all the questions satisfactory as per my knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Please share your actual knowledge in your CV and actual CTC in CV. Thank you.

I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffrence between quantity survey and billing
  • Ans. 

    Quantity survey involves estimating and managing costs of construction projects, while billing is the process of invoicing clients for work done.

    • Quantity survey involves cost estimation, cost control, and contract administration.

    • Billing involves invoicing clients for work done, including labor, materials, and other expenses.

    • Quantity surveyors work closely with architects, engineers, and contractors to ensure projects a...

  • Answered by AI
  • Q2. Asking what type of work you did there

Interview Preparation Tips

Interview preparation tips for other job seekers - Before attending interview , to learn your field related things.

I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. When I services
  • Q2. Are you pass higher secondary exam?
  • Q3. What is your birthday
  • Q4. When are you pass civil engineering diploma
  • Q5. When are you pass higher secondary
  • Q6. When are you pass HSLC
  • Ans. 

    I passed HSLC in 2015.

    • I passed HSLC in 2015.

    • I completed my HSLC in 2015.

    • I cleared the HSLC examination in 2015.

  • Answered by AI
  • Q7. Are you experiencing
  • Q8. Please Adress?
  • Ans. Vill: Bagariguri , PO: Jajori , DIST.: Nagaon, pin: 782142
  • Answered by Sanjib Bordoloi
  • Q9. Your father name?

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes, share my job, I have passed civil engineering diploma in 1996 year

I applied via Company Website and was interviewed before Jul 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Technical questions on irc and structural analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with basic knowledge of some structure like retaining wall, irc codes
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Everything is asked from CV

Interview Preparation Tips

Interview preparation tips for other job seekers - GOOD COMPANY TO WORK

William Hare Interview FAQs

How many rounds are there in William Hare Junior Detailer interview?
William Hare interview process usually has 3 rounds. The most common rounds in the William Hare interview process are Technical, Resume Shortlist and Aptitude Test.
How to prepare for William Hare Junior Detailer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at William Hare. The most common topics and skills that interviewers at William Hare expect are Detailing, Editing, Modeler and Tekla Structures.
What are the top questions asked in William Hare Junior Detailer interview?

Some of the top questions asked at the William Hare Junior Detailer interview -

  1. After that HR interview will be conduct...read more
  2. Technical round need to create mo...read more

Tell us how to improve this page.

Design Engineer
33 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Senior Engineer
12 salaries
unlock blur

₹7 L/yr - ₹11.3 L/yr

Tekla Modeller
12 salaries
unlock blur

₹5 L/yr - ₹12 L/yr

Quantity Surveyor
11 salaries
unlock blur

₹3.6 L/yr - ₹8 L/yr

Engineer
9 salaries
unlock blur

₹3.6 L/yr - ₹6.5 L/yr

Explore more salaries
Compare William Hare with

GAMMON INDIA

3.8
Compare

McNally Bharat Engineering

4.1
Compare

Gammon Engineers And Contractors

4.0
Compare

Military Engineer Services

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview