I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
posted on 19 Feb 2024
I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.
Type test of Transformer involves testing the transformer to ensure it meets specified requirements.
Type test includes routine tests like insulation resistance, ratio test, winding resistance, etc.
Special tests like temperature rise test, impulse test, and short circuit test are also conducted.
Type test ensures the transformer can handle specified loads and environmental conditions.
Results of type test determine the qu...
Testing of CT PT involves verifying accuracy, polarity, and insulation resistance.
Verify accuracy by comparing readings with known standards.
Check polarity to ensure correct connection of leads.
Test insulation resistance to prevent short circuits.
Perform ratio and burden tests to confirm proper functioning.
Calibrate equipment regularly for accurate results.
GIS in Substation stands for Gas Insulated Switchgear, which is a type of switchgear used in substations for high voltage transmission.
GIS is a type of switchgear that uses sulfur hexafluoride gas to insulate and protect electrical equipment.
It is compact and requires less space compared to traditional air-insulated switchgear.
GIS is commonly used in high voltage substations to improve reliability and reduce maintenanc
posted on 17 Apr 2024
I applied via Approached by Company and was interviewed in May 2024. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2022. There were 5 interview rounds.
posted on 19 Feb 2024
I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.
Type test of Transformer involves testing the transformer to ensure it meets specified requirements.
Type test includes routine tests like insulation resistance, ratio test, winding resistance, etc.
Special tests like temperature rise test, impulse test, and short circuit test are also conducted.
Type test ensures the transformer can handle specified loads and environmental conditions.
Results of type test determine the qu...
Testing of CT PT involves verifying accuracy, polarity, and insulation resistance.
Verify accuracy by comparing readings with known standards.
Check polarity to ensure correct connection of leads.
Test insulation resistance to prevent short circuits.
Perform ratio and burden tests to confirm proper functioning.
Calibrate equipment regularly for accurate results.
GIS in Substation stands for Gas Insulated Switchgear, which is a type of switchgear used in substations for high voltage transmission.
GIS is a type of switchgear that uses sulfur hexafluoride gas to insulate and protect electrical equipment.
It is compact and requires less space compared to traditional air-insulated switchgear.
GIS is commonly used in high voltage substations to improve reliability and reduce maintenanc
posted on 23 Jan 2023
I applied via Referral and was interviewed in Dec 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Fraud control at site is crucial and can be achieved through a combination of measures.
Implementing strict access control measures
Conducting regular audits and inspections
Establishing clear policies and procedures for reporting and investigating fraud
Training employees on fraud prevention and detection
Collaborating with law enforcement agencies
Using technology to monitor and detect fraudulent activities
Parameters of a project include scope, time, cost, quality, resources, and risks.
Scope defines the boundaries and deliverables of the project.
Time refers to the project schedule and deadlines.
Cost includes the budget and financial resources required for the project.
Quality refers to the standards and expectations for the project outcomes.
Resources include the people, equipment, and materials needed for the project.
Risk...
posted on 4 Apr 2022
I applied via Naukri.com and was interviewed before Apr 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.
Rate analysis of 1 cum of B/W
B/W stands for Brickwork
Rate analysis involves calculating the cost of materials, labor, and equipment required for a project
Factors that affect the rate analysis include location, availability of materials, and labor costs
The rate analysis for 1 cum of B/W would depend on the specific project requirements and materials used
based on 6 reviews
Rating in categories
Senior Engineer
52
salaries
| ₹3.5 L/yr - ₹7.5 L/yr |
Assistant Manager
47
salaries
| ₹6 L/yr - ₹13.1 L/yr |
Project Engineer
35
salaries
| ₹3.3 L/yr - ₹6 L/yr |
Engineer
33
salaries
| ₹2.1 L/yr - ₹5.1 L/yr |
Senior Sales Engineer
27
salaries
| ₹4.6 L/yr - ₹7.2 L/yr |
EMERSON PROCESS MANAGEMENT
Endress Hauser
ABB
Siemens