I applied via Company Website and was interviewed in Dec 2021. There were 3 interview rounds.
I want to join this company because of its strong reputation, innovative culture, and opportunities for growth.
Strong reputation: The company has a proven track record of success and is highly regarded in the industry.
Innovative culture: The company encourages creativity and embraces new ideas, which aligns with my own values and aspirations.
Opportunities for growth: The company offers various training and development ...
The main objective of WBSETCL is to operate and maintain the power transmission system in West Bengal.
To ensure uninterrupted power supply to the state of West Bengal
To maintain and upgrade the power transmission infrastructure
To promote renewable energy sources
To ensure safety and reliability of the power transmission system
To provide efficient and cost-effective power transmission services
Transmission companies transmit electricity from power plants to substations while distribution companies distribute electricity to end-users.
Transmission companies operate high voltage power lines and transformers.
Distribution companies operate low voltage power lines and transformers.
Transmission companies transmit electricity over long distances while distribution companies distribute electricity over short distance...
A circuit breaker is an electrical switch that automatically interrupts the flow of current when there is an overload or short circuit.
It is a safety device that protects electrical circuits from damage caused by excess current.
It works by detecting when the current exceeds a certain level and then quickly opening the circuit to stop the flow of electricity.
Once the fault has been corrected, the circuit breaker can be ...
Latest Development in his/her field of work.
Situation to be analyzed
Top trending discussions
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
I appeared for an interview in Sep 2020.
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.
Collect data on equipment usage and fuel consumption
Calculate fuel efficiency by dividing fuel consumption by equipment usage
Compare fuel efficiency across different equipment to identify outliers
Identify factors that may affect fuel efficiency, such as maintenance or operator behavior
I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Greenhouse gases trap heat in the atmosphere, contributing to global warming. Their Global Warming Potential (GWP) varies significantly.
Carbon Dioxide (CO2) - GWP of 1, the most prevalent greenhouse gas.
Methane (CH4) - GWP of 25, significantly more effective than CO2 over 100 years.
Nitrous Oxide (N2O) - GWP of 298, emitted from agricultural and industrial activities.
Fluorinated gases - GWP ranges from 1,000 to over 10,
EIA (Environmental Impact Assessment) evaluates the potential environmental effects of proposed projects.
1. Screening: Determine if a project requires EIA. Example: A new highway may need an EIA.
2. Scoping: Identify key issues and impacts to be assessed. Example: Assessing effects on local wildlife.
3. Impact Assessment: Analyze potential environmental impacts. Example: Evaluating air quality changes due to construction...
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
Junior Engineer Electrical
5
salaries
| ₹4.1 L/yr - ₹11 L/yr |
Divisional Engineer
5
salaries
| ₹10.4 L/yr - ₹12 L/yr |
Electrical Engineer
4
salaries
| ₹5.5 L/yr - ₹13 L/yr |
Junior Engineer
4
salaries
| ₹4 L/yr - ₹7.2 L/yr |
Assistant Electrical Engineer
4
salaries
| ₹8.4 L/yr - ₹14 L/yr |