Upload Button Icon Add office photos

Filter interviews by

Volta Green Structures Assistant Project Manager Interview Questions and Answers

Updated 17 Feb 2022

Volta Green Structures Assistant Project Manager Interview Experiences

1 interview found

I applied via Company Website and was interviewed in Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What is your salary expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Just stick to the basic for technical knowledge. Keep updating your knowledge as per current requirements e.g software knowledge etc.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Techno-commercial
  • Q2. About Power project
  • Q3. Soft skills as SAP, AutoCAD, Microsoft
  • Q4. Family background
Round 2 - Technical 

(2 Questions)

  • Q1. Project Related technical and commercial part
  • Q2. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on all previous and current work profile, skills and clear communication.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Dtr & PSS structure of SLD.
  • Ans. 

    Dtr & PSS structure of SLD refers to Distribution Transformer and Package Substation structure in Single Line Diagram.

    • Dtr stands for Distribution Transformer which is used to step down voltage for distribution purposes.

    • PSS stands for Package Substation which is a compact unit containing transformers, switchgear, and control equipment.

    • In a Single Line Diagram (SLD), Dtr and PSS are represented by symbols to show their l...

  • Answered by AI
  • Q2. Billing process
Round 2 - HR 

(2 Questions)

  • Q1. Salary dissuction
  • Q2. Work of experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Project monitoring, supervison of quality works.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Previous work experience related questions
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions
Round 3 - Joining 

(1 Question)

  • Q1. Previous work experience questions
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(5 Questions)

  • Q1. What is ptr full name
  • Ans. 

    PTR stands for Project Technical Report.

    • PTR is a document that summarizes the technical aspects of a project.

    • It includes details such as project scope, objectives, methodology, results, and conclusions.

    • PTRs are often used to communicate project progress and findings to stakeholders.

  • Answered by AI
  • Q2. What is lt pole election rull
  • Ans. 

    LT pole election rule refers to the guidelines and regulations for selecting and installing low tension electrical poles.

    • LT pole election rule specifies the criteria for selecting the appropriate location for installing low tension electrical poles.

    • It includes factors such as distance from buildings, roadways, and other structures, as well as soil conditions and accessibility.

    • Compliance with LT pole election rule ensur...

  • Answered by AI
  • Q3. Power transmission research
  • Q4. Distribution tarnsfarma reserch
  • Q5. Five fit depth with coil earthing
  • Ans. 

    Coil earthing is a method of grounding electrical systems to prevent electric shock and ensure safety.

    • Coil earthing involves burying a coil of wire in the ground to create a low-resistance path for electrical currents to flow safely.

    • The depth at which the coil should be buried depends on factors such as soil type, moisture content, and local regulations.

    • Proper installation of coil earthing is essential to protect equip...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1.33kv&11kv BOQ 2.Power transformer description 3.what CT/PT will do
  • Ans. 

    The interview question is about 1.33kv&11kv BOQ, power transformer description, and the role of CT/PT.

    • BOQ for 1.33kv and 11kv involves preparing a bill of quantities for electrical equipment and materials required for the project.

    • Power transformer description includes its specifications, such as voltage rating, power rating, winding configuration, cooling system, etc.

    • CT/PT (Current Transformer/Potential Transformer) ar...

  • Answered by AI
  • Q2. 4.how to find transformer is star connected or delta connected 5.APL/BPL/AGL material 6.what is ROW..
  • Ans. 

    Answering questions related to electrical engineering

    • To find if a transformer is star or delta connected, check the connection of the primary and secondary windings

    • APL/BPL/AGL materials refer to Above Poverty Line/Below Poverty Line/Anti-Graffiti materials used in construction

    • ROW stands for Right of Way, which is the legal right to pass through a property or land

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Tell me about family background
  • Q2. Salary expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident..

I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. I was asked about how to do complete a balance project work within 2 months time schedule as their Dullahapur Rail project ( Distt Ghazipur, U.P.) got delayed by 10 months. Interview was taken by JMD Mr. S...

Interview Preparation Tips

Interview preparation tips for other job seekers - I never suggest anyone to join because of their bad culture. Very worst HR rules. No weekly off or national holiday. Attendance of all staff including Sr. PM is monitored through Biometric system installed at Site. Working hours are of 12 hours. 11 hour attendance at site will be treated as half day attendence. There is no provision of deduction of PF, ESIC & other employees welfare scheme. Director Mr. Bhavesh Patel is a non technical person & unable to understand the site requirements. PPE KIt also not provided to employees. Salary holds for one & half months without any reason. Hence, I discontinued my service after 3 months with a bad experience.

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Related technical issues in regard to your domain
  • Q2. Answer specifically and to the point

Interview Preparation Tips

Interview preparation tips for other job seekers - Make CV according to your specific work experience. Drive interviewer to your area of expertise. Discuss thoroughly in your specific area of expertise. Be honest to say no in case some concepts are not known or clear.

Tell specifically where you are very much conversant.

Volta Green Structures Interview FAQs

How many rounds are there in Volta Green Structures Assistant Project Manager interview?
Volta Green Structures interview process usually has 2 rounds. The most common rounds in the Volta Green Structures interview process are Resume Shortlist and HR.

Tell us how to improve this page.

People are getting interviews through

based on 1 Volta Green Structures interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Volta Green Structures Assistant Project Manager Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

1.0

Skill development

2.0

Work-Life balance

3.0

Salary & Benefits

1.0

Job Security

1.0

Company culture

3.0

Promotions/Appraisal

1.0

Work Satisfaction

Explore 1 Review and Rating
Assistant Manager
13 salaries
unlock blur

₹4.5 L/yr - ₹13.5 L/yr

Production Engineer
9 salaries
unlock blur

₹2.5 L/yr - ₹4.8 L/yr

Deputy Manager
7 salaries
unlock blur

₹5.5 L/yr - ₹10 L/yr

Project Coordinator
6 salaries
unlock blur

₹4 L/yr - ₹6.4 L/yr

Safety Officer
6 salaries
unlock blur

₹2.7 L/yr - ₹5.7 L/yr

Explore more salaries
Compare Volta Green Structures with

Interarch Building Product

4.1
Compare

Everest Industries

4.0
Compare

Tata BlueScope Steel

3.7
Compare

Jindal Steel and Power

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview