i
VIKRAN Engineering & Exim
Filter interviews by
I appeared for an interview before Sep 2022.
posted on 12 Oct 2021
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
posted on 20 Apr 2024
posted on 2 Nov 2022
I applied via Recruitment Consulltant
posted on 1 Sep 2022
I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.
Surveyors measure and map land, airspace, and water features to determine property boundaries and prepare construction sites.
Surveyors use specialized equipment such as GPS, total stations, and drones to collect data.
They analyze the data to create maps, legal descriptions, and other documents.
Surveyors work in various industries including construction, engineering, and government.
They must have knowledge of math, phys...
To do a detailed survey, a surveyor must use precise instruments and techniques to accurately measure and record data.
Use high-precision instruments such as total stations and GPS receivers
Take multiple measurements to ensure accuracy
Record data in a clear and organized manner
Consider environmental factors that may affect measurements
Collaborate with other professionals to ensure comprehensive data collection
Use softwa...
Layout and line level check can be done using various tools and techniques.
Use a theodolite or total station to measure angles and distances accurately.
Use a level to ensure that the ground is level and the lines are straight.
Use string lines and pegs to mark out the layout of the site.
Check the measurements and levels regularly to ensure accuracy.
Make adjustments as necessary to ensure that the layout and lines are co
Surveyor work involves measuring and mapping land, buildings, and other physical features.
Using specialized equipment to take precise measurements
Creating maps and drawings to represent the data collected
Working with architects, engineers, and construction teams
Ensuring compliance with local regulations and laws
Surveying land for potential development or construction projects
posted on 28 Oct 2024
Aptitude ,logical reasoning and quant aptitude
posted on 27 Nov 2024
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Senior Engineer
61
salaries
| ₹3.2 L/yr - ₹8.1 L/yr |
Assistant Manager
44
salaries
| ₹5.2 L/yr - ₹10.3 L/yr |
Engineer
43
salaries
| ₹2 L/yr - ₹6.2 L/yr |
Deputy Manager
28
salaries
| ₹7.5 L/yr - ₹12.6 L/yr |
Site Engineer
23
salaries
| ₹2.5 L/yr - ₹4.4 L/yr |
ABCI Infrastructures
The Louis Berger Group
Nesma & Partners
El Seif Engineering Contracting