Filter interviews by
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
PLC troubleshooting involves identifying the issue, checking power supply, examining connections, reviewing program logic, and testing inputs/outputs.
Identify the issue by checking for error messages or abnormal behavior
Check the power supply to ensure it is functioning properly
Examine connections to make sure they are secure and not damaged
Review the program logic to identify any errors or malfunctions
Test inputs and
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
posted on 12 Aug 2024
I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.
IBR stage wise inspection procedures involve thorough examination at different stages of a project to ensure quality and compliance.
IBR stands for In-Process Inspection, Testing, and Review
Inspection procedures are carried out at various stages of a project to check for quality and compliance
Each stage of inspection involves specific criteria and checks to be performed
Documentation of inspection results is crucial for
posted on 27 Sep 2021
I applied via Naukri.com and was interviewed before Sep 2022. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Sep 2021. There was 1 interview round.
Types of connections refer to the different ways in which devices or components can be linked together.
Wired connections: Ethernet, USB, HDMI, VGA, etc.
Wireless connections: Wi-Fi, Bluetooth, NFC, etc.
Optical connections: Fiber optic cables, Toslink, etc.
Analog connections: RCA, 3.5mm audio jack, etc.
Digital connections: HDMI, DisplayPort, Thunderbolt, etc.
posted on 12 Oct 2021
posted on 11 Oct 2024
AMC stands for Annual Maintenance Contract.
AMC is a contract between a service provider and a client for the maintenance of equipment or property.
It typically covers regular maintenance, repairs, and replacements.
AMC can be for various types of equipment such as computers, air conditioners, elevators, etc.
The contract can be for a year or more depending on the agreement between the parties.
AMC ensures that the equipmen...
AQC stands for Air Quality Control.
AQC is a system that monitors and controls the quality of air in a given environment.
It is used in various industries such as manufacturing, healthcare, and hospitality.
AQC systems can detect and remove pollutants, regulate temperature and humidity, and prevent the spread of airborne diseases.
Examples of AQC systems include air purifiers, HVAC systems, and ventilation systems.
posted on 18 Jul 2023
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Coordinator
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Interarch Building Product
Everest Industries
Tata BlueScope Steel
Jindal Steel and Power