Filter interviews by
TPM stands for Trusted Platform Module.
TPM is a hardware-based security chip that provides secure storage and cryptographic functions.
It is used to enhance the security of computers and protect sensitive data.
TPM can be found in many devices such as laptops, desktops, and servers.
Examples of TPM manufacturers include Infineon, Nuvoton, and STMicroelectronics.
Losses in TPM refer to any reduction in overall equipment effectiveness (OEE) due to various factors.
Losses can be categorized into three types: availability losses, performance losses, and quality losses.
Availability losses occur when equipment is not available for production due to breakdowns, changeovers, or planned maintenance.
Performance losses occur when equipment operates at a slower speed than its maximum capab...
Japan in 1971 form the japanese
OEE stands for Overall Equipment Efficiency.
OEE is a measure of how effectively a manufacturing operation is utilized
It takes into account three factors: availability, performance, and quality
OEE is calculated by multiplying the availability, performance, and quality percentages
It is commonly used in TPM (Total Productive Maintenance) to assess equipment effectiveness
Pillars are vertical structures that provide support and stability to a building or structure.
Pillars are typically made of strong materials like concrete, steel, or stone.
They are strategically placed throughout a building to distribute the weight and provide structural integrity.
Pillars can be decorative elements as well, featuring intricate designs or carvings.
Examples of famous pillars include the columns of the Pa...
5s loss refers to the waste or inefficiency caused by the absence of the 5s principles in a workplace.
5s loss is the result of not implementing the 5s principles: Sort, Set in Order, Shine, Standardize, and Sustain.
It leads to disorganization, wasted time, increased errors, and reduced productivity.
Examples of 5s loss include searching for tools or materials, cluttered workspaces, and difficulty in finding information
posted on 19 Jan 2025
I applied via Approached by Company and was interviewed before Jan 2024. There was 1 interview round.
I have worked with several DCS systems including Honeywell Experion PKS, Emerson DeltaV, and Siemens PCS 7.
Honeywell Experion PKS
Emerson DeltaV
Siemens PCS 7
Yes, I am interested in joining your company as an Executive Engineer.
I have the necessary skills and experience for the role
I am excited about the opportunity to contribute to the company's success
I believe in the company's values and vision
posted on 6 Jul 2017
I appeared for an interview before Jul 2016.
posted on 3 May 2019
posted on 7 Mar 2021
I applied via Campus Placement
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
posted on 27 Mar 2024
I applied via Job Portal and was interviewed in Feb 2024. There were 2 interview rounds.
posted on 15 Mar 2024
I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
posted on 13 Jun 2024
I work on Siemens S7-1200 PLC for automation in industrial processes.
Siemens S7-1200 PLC is commonly used for automation in industrial processes
It offers high performance and reliability
It has a user-friendly interface for programming and monitoring
It supports various communication protocols for integration with other systems
based on 1 interview
Interview experience
Assistant Engineer
203
salaries
| ₹1.8 L/yr - ₹4.6 L/yr |
Production Engineer
154
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Manager
130
salaries
| ₹4.2 L/yr - ₹13 L/yr |
Senior Engineer
113
salaries
| ₹3 L/yr - ₹8.2 L/yr |
Engineer
109
salaries
| ₹2.2 L/yr - ₹6.6 L/yr |
Tata Steel
JSW Steel
Jindal Steel and Power
ArcelorMittal Nippon Steel