Filter interviews by
I applied via Approached by Company and was interviewed in Jun 2022. There was 1 interview round.
Top trending discussions
I was interviewed in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes, which is 2 fishes.
To make the red fishes 98%, subtract 1% (2 fishes) from 99% (198 fishes).
To find the number of fishes to be removed, divide the difference by 1% (2 fishes).
Therefore, 50 fishes have to be removed to make the red fishes 98%.
I was interviewed in Feb 2017.
I was interviewed in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes to find the number of red fishes.
Subtract the number of red fishes from 200 to find the number of non-red fishes.
Calculate 2% of the total number of fishes to find the desired number of red fishes.
Subtract the desired number of red fishes from the current number of red fishes to find the number of fishes to be removed.
posted on 3 May 2017
I was interviewed before May 2016.
posted on 28 Jun 2017
I was interviewed in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes to find out how many fishes represent 1%.
Multiply the result by 2 to find out how many fishes represent 2%.
Subtract the result from 200 to find out how many fishes represent 98%.
I was interviewed before May 2016.
posted on 19 Aug 2024
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Handling overall plant operations requires effective leadership, communication, and problem-solving skills.
Establish clear goals and objectives for the plant
Delegate tasks and responsibilities to team members based on their strengths and skills
Regularly communicate with staff to ensure everyone is on the same page
Monitor plant performance and address any issues or concerns promptly
Implement continuous improvement initi...
The schedule for the PM machines includes regular maintenance checks and servicing to ensure optimal performance.
Regular maintenance checks are typically scheduled every 3 months.
Servicing is usually done annually to prevent breakdowns.
Emergency repairs may be scheduled as needed to minimize downtime.
Machine downtime for maintenance should be factored into production schedules.
During plant shutdowns, time can be utilized for maintenance, training, planning, and improvement projects.
Schedule maintenance activities to ensure equipment is in optimal condition for when the plant reopens.
Provide training sessions for employees to enhance their skills and knowledge.
Use the downtime to plan upcoming projects and set goals for the team.
Implement improvement initiatives to increase efficiency and pro...
posted on 15 Sep 2022
I applied via Referral and was interviewed before Sep 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
Meat and share advice with everyone
All detail filled with coding
Know ur knowledge and feel ur interview
based on 24 reviews
Rating in categories
Quality Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
QA Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Supreme Industries
Nilkamal
Finolex Industries
Prince Pipes & Fittings