Filter interviews by
Tell me about your self
I applied via Referral and was interviewed before Mar 2020. There were 3 interview rounds.
I am a dedicated and experienced Production Officer with a strong background in managing production processes and ensuring quality standards are met.
Over 5 years of experience in production management
Skilled in optimizing production processes to increase efficiency
Strong knowledge of quality control measures and standards
Excellent communication and leadership skills
Managed a team of production workers to meet daily pro
I am passionate about production processes and believe in the company's mission and values.
I have a strong background in production management and am excited about the opportunity to contribute to the team.
I admire the company's commitment to innovation and sustainability in their production practices.
I am impressed by the company's reputation for quality and efficiency in their production operations.
I may have low experience but I am eager to learn, dedicated, and have a strong work ethic.
I may have low experience but I bring fresh perspectives and innovative ideas to the table.
I am a quick learner and have a strong willingness to adapt and grow in the role.
I am highly motivated, dedicated, and have a strong work ethic which will drive me to excel in the position.
I am confident that my skills and enthusiasm make m
Seeking new challenges and opportunities for growth.
Looking for career advancement
Seeking new challenges
Opportunity for professional growth
Company restructuring or downsizing
Relocation to a new area
Lack of opportunities for growth and development
Limited training programs available
Few opportunities for advancement within the company
Lack of support for professional development goals
My first step when I start my work is to review the production schedule and prioritize tasks accordingly.
Review the production schedule to understand the tasks for the day
Prioritize tasks based on deadlines and importance
Coordinate with team members to assign responsibilities and ensure smooth workflow
Line clearance is the process of ensuring that a production line is safe and ready for operation.
Line clearance involves inspecting and cleaning the production line before starting a new batch or product.
It ensures that all equipment, tools, and materials are in place and in good working condition.
Line clearance also involves verifying that the previous batch or product has been completely removed from the line.
It incl...
There are three types of Line Clearance: Full Line Clearance, Partial Line Clearance, and No Line Clearance.
Full Line Clearance involves completely clearing the production line before starting a new product or process.
Partial Line Clearance involves clearing only specific parts of the production line that are relevant to the new product or process.
No Line Clearance occurs when there is no need to clear the production l...
CIP stands for Clean-in-Place, a method used in production to clean equipment without disassembly.
CIP is a cleaning technique used in various industries such as food and beverage, pharmaceuticals, and manufacturing.
It involves cleaning equipment and pipelines without the need for disassembly, saving time and resources.
CIP systems typically use a combination of cleaning agents, heat, and mechanical action to remove cont...
The steps to tablet manufacturing involve formulation, granulation, compression, coating, and packaging.
Formulation: The active ingredients and excipients are mixed to create a uniform blend.
Granulation: The blend is moistened and then dried to form granules.
Compression: The granules are compressed into tablets using a tablet press.
Coating: Some tablets may undergo a coating process to improve appearance, taste, or sta...
RMG stands for Ready Made Garments and FBD stands for Fluidized Bed Dryer.
RMG refers to the clothing items that are manufactured and ready to be worn by customers.
FBD is a type of industrial dryer that uses fluidization to efficiently dry materials.
RMG industry is a major sector in many countries, contributing to their economy and employment.
FBD is commonly used in pharmaceutical, chemical, and food industries for dryi...
LOD stands for Level of Detail.
LOD is a concept used in computer graphics and 3D modeling.
It refers to the amount of detail or complexity in a 3D model or scene.
Higher LOD means more detailed and realistic visuals, but also requires more processing power.
Lower LOD is used for objects or areas that are farther away or less important.
LOD can be dynamically adjusted based on the viewer's distance or performance requiremen...
Yes, I have worked in the compression section.
I have experience working in the compression section.
I am familiar with the equipment and processes involved in compression.
I have successfully operated compression machinery to meet production targets.
I have knowledge of troubleshooting and maintenance of compression equipment.
I have implemented safety protocols and ensured compliance in the compression section.
The output in an hour can be calculated by multiplying the machine's RPM by the number of minutes in an hour.
To calculate the output in an hour, multiply the machine's RPM by 60 (the number of minutes in an hour).
For example, if the machine runs at 60 RPM, the output in an hour would be 60 x 60 = 3600 units.
Primary packing refers to the packaging of individual products, while secondary packing involves grouping multiple products together.
Primary packing is the initial packaging that directly contains the product, such as a bottle or blister pack.
Secondary packing is the outer packaging that holds multiple primary packs, like a box or carton.
Primary packing ensures product integrity, while secondary packing provides conven...
There are two main types of PVC: rigid PVC and flexible PVC.
Rigid PVC is commonly used in construction for pipes, fittings, and window frames.
Flexible PVC is used in applications such as electrical cables, flooring, and medical tubing.
There are also variations of PVC such as chlorinated PVC (CPVC) and unplasticized PVC (uPVC).
The liquid used in leak tests can vary depending on the specific application and industry.
Water is commonly used as a liquid for leak tests in various industries.
In automotive industry, a mixture of water and soap solution is often used for leak tests.
In medical devices industry, sterile water or saline solution may be used for leak tests.
In HVAC industry, refrigerants or nitrogen gas can be used for leak tests.
Differe...
posted on 28 Oct 2022
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 3 interview rounds.
Not applicable , this was final round
posted on 12 Feb 2024
I applied via Walk-in and was interviewed in Jan 2024. There were 4 interview rounds.
They given some topic on gd
They gave some gd questions
I applied via Referral and was interviewed in Feb 2020. There were 6 interview rounds.
Good level question. I have qualified for the next round
Basic to intermediate question, Cleared the test
posted on 22 Jul 2024
I applied via Walk-in and was interviewed before Jul 2023. There were 4 interview rounds.
Coding test duration is 30 to 40 min
on paper pen and topic is simple like related to string,pattern and number's
posted on 6 Dec 2024
I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.
based on 1 interview
Interview experience
based on 25 reviews
Rating in categories
Officer
11
salaries
| ₹1.3 L/yr - ₹4 L/yr |
Senior Officer
7
salaries
| ₹2 L/yr - ₹4 L/yr |
Assistant Manager
6
salaries
| ₹3 L/yr - ₹6 L/yr |
Quality Officer
5
salaries
| ₹1 L/yr - ₹4.1 L/yr |
Junior Officer
5
salaries
| ₹0.9 L/yr - ₹2.7 L/yr |
Amazon Sellers Services
Primus Global Technologies
GAMMON INDIA
Practo