I applied via LinkedIn and was interviewed in Nov 2021. There were 3 interview rounds.
Milestone activities are set by identifying key events in a project and assigning them a specific date or duration.
Identify key events in the project timeline
Assign a specific date or duration to each milestone activity
Ensure that milestone activities are achievable and measurable
Use project management software to track progress and adjust milestones as needed
Master Schedule is a comprehensive plan that outlines the project's timeline, milestones, and deliverables.
It is a detailed plan that includes all the tasks and activities required to complete a project.
It outlines the timeline, milestones, and deliverables of the project.
It is used to track progress and ensure that the project is on schedule.
It is often created using project management software such as Microsoft Proje...
Top trending discussions
posted on 22 Jul 2023
Yes, I am able to fill measurement books provided by clients.
I have experience in accurately recording measurements and quantities in measurement books.
I am familiar with the format and requirements of measurement books provided by clients.
I ensure all necessary details are included in the measurement book, such as date, location, description of work, measurements, and signatures.
I am proficient in using measurement to...
Rolling margin is the difference between the planned value and the earned value at a specific point in time.
Rolling margin helps in measuring the efficiency of a project by comparing planned and actual progress.
It is calculated by subtracting the earned value from the planned value.
A positive rolling margin indicates that the project is ahead of schedule, while a negative rolling margin indicates that the project is be
Consumption ratios in civil work refer to the quantities of materials used in construction projects.
Consumption ratios vary depending on the type of civil work being done.
Common consumption ratios include cement:sand:aggregate ratios for concrete mixes.
Other consumption ratios may include steel reinforcement ratios for structural elements.
Accurate consumption ratios are essential for cost estimation and project plannin
posted on 22 Jul 2023
Yes, I am able to fill measurement books provided by clients.
I have experience in accurately recording measurements and quantities in measurement books.
I am familiar with the format and requirements of measurement books provided by clients.
I ensure all necessary details are included in the measurement book, such as date, location, description of work, measurements, and signatures.
I am proficient in using measurement to...
Rolling margin is the difference between the planned value and the earned value at a specific point in time.
Rolling margin helps in measuring the efficiency of a project by comparing planned and actual progress.
It is calculated by subtracting the earned value from the planned value.
A positive rolling margin indicates that the project is ahead of schedule, while a negative rolling margin indicates that the project is be
Consumption ratios in civil work refer to the quantities of materials used in construction projects.
Consumption ratios vary depending on the type of civil work being done.
Common consumption ratios include cement:sand:aggregate ratios for concrete mixes.
Other consumption ratios may include steel reinforcement ratios for structural elements.
Accurate consumption ratios are essential for cost estimation and project plannin
I applied via Approached by Company and was interviewed in Sep 2022. There were 3 interview rounds.
Delete removes an activity from the project, while dissolve removes a relationship between activities.
Delete removes an activity from the project and all its relationships with other activities.
Dissolve removes a relationship between two activities, but the activities themselves remain in the project.
Deleting an activity can have a cascading effect on the rest of the project, while dissolving a relationship only affect...
I prepare programme by identifying objectives, breaking them down into tasks, assigning resources and setting timelines.
Identify objectives and goals
Break down objectives into smaller tasks
Assign resources and responsibilities to team members
Set timelines and deadlines for each task
Regularly review and update the programme to ensure progress is on track
Assistant Manager
5
salaries
| ₹10 L/yr - ₹15 L/yr |
Design Engineer
5
salaries
| ₹5.8 L/yr - ₹9.5 L/yr |
Structural Designer
4
salaries
| ₹9 L/yr - ₹9.6 L/yr |
Project Executive Engineer
4
salaries
| ₹15 L/yr - ₹19 L/yr |
Assistant Engineer
3
salaries
| ₹3.7 L/yr - ₹5 L/yr |
TCS
Accenture
Wipro
Cognizant