  • Q1. Have you maintained standard quality in your previous company?
  • Q2. Do you use drawing and technology in your work?
  • Q3. Are you doing to maintain time in your life
Round 2 - Aptitude Test 

Calculator for material quantity on site material

Round 3 - HR 

(2 Questions)

  • Q1. How do you calculate the quantity of a specific item or material?
  • Q2. What methods do you use to verify information?

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you for providing me with this opportunity.
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via AmbitionBox and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Different between Ndt and non ndt
  • Ans. 

    NDT (Non-Destructive Testing) involves testing materials without causing damage, while non-NDT methods may involve destructive testing.

    • NDT methods include ultrasonic testing, radiography, magnetic particle testing, and dye penetrant testing.

    • Non-NDT methods may include cutting, drilling, or breaking materials to test their properties.

    • NDT is commonly used in industries like aerospace, automotive, and construction to ensu...

  • Answered by AI
  • Q2. Which electrode is use welding purpose for corbon steel to alloy steel
  • Ans. 

    For welding carbon steel to alloy steel, the electrode commonly used is E7018.

    • E7018 electrode is commonly used for welding carbon steel to alloy steel

    • It is a low-hydrogen electrode that provides strong welds with good impact resistance

    • The electrode operates on DC current and is suitable for both vertical and overhead welding positions

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Ecinomiser coil material specification
  • Ans. 

    Economizer coil material specification is typically stainless steel or aluminum.

    • Economizer coils are commonly made of stainless steel or aluminum for corrosion resistance and durability.

    • The material specification for economizer coils may vary depending on the specific application and operating conditions.

    • Stainless steel economizer coils are preferred for high temperature and corrosive environments, while aluminum coils...

  • Answered by AI
  • Q2. Superheated coil material specification
  • Ans. 

    Superheated coil material specification is typically stainless steel due to its high temperature resistance and durability.

    • Stainless steel is commonly used for superheated coil material due to its high temperature resistance

    • Other materials like nickel alloys may also be used for specific applications

    • Material specifications should meet the required temperature and pressure ratings for the superheated coil

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Different between accounts and accountability
  • Ans. 

    Accounts are financial records, while accountability is the responsibility to justify actions and decisions.

    • Accounts refer to financial records of transactions, while accountability refers to the obligation to explain and justify actions.

    • Accounts are used to track financial activities and performance, while accountability ensures transparency and integrity in decision-making.

    • Examples: Keeping accurate accounts of proje...

  • Answered by AI
  • Q2. How to check materials
  • Ans. 

    Materials can be checked by conducting visual inspections, performing tests, and verifying documentation.

    • Conduct visual inspections to check for any defects or damages

    • Perform tests such as strength tests, hardness tests, and chemical tests

    • Verify documentation such as certificates of conformity and material test reports

    • Ensure materials meet specifications and standards set by the project

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Site Engineer interview:
  • thermal power project
Interview preparation tips for other job seekers - Knowledge is very important for engineering
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - HR 

(2 Questions)

  • Q1. Asking last company description
  • Q2. When I am free for interview
Round 2 - One-on-one 

(2 Questions)

  • Q1. What is my experience
  • Q2. What I have done in my past companies
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. How make staging Hight 3.5m
  • Ans. 

    To make staging at a height of 3.5m, use sturdy materials like steel or aluminum for the frame and platform.

    • Use steel or aluminum for the frame and platform for stability.

    • Ensure proper bracing and support to prevent collapse.

    • Consider using adjustable legs for uneven ground.

    • Use safety rails and toe boards for fall protection.

    • Regularly inspect and maintain the staging for safety.

  • Answered by AI
  • Q2. Brick work Enlish bond flemis bond
  • Q3. How make Messer stair case shuttering
  • Ans. 

    To make Messer staircase shuttering, follow these steps: mark the layout, prepare the formwork, install the formwork, pour the concrete, and remove the formwork after the concrete has set.

    • Mark the layout of the staircase on the ground to determine the dimensions and shape.

    • Prepare the formwork by cutting the plywood sheets to the required size and assembling them to create the mold for the staircase.

    • Install the formwork...

  • Answered by AI
  • Q4. What is stander size steel lepping
  • Ans. 

    Standard size steel rebar used for reinforcement in construction projects.

    • Standard size steel rebar is typically available in diameters ranging from 6mm to 50mm.

    • Common sizes include 8mm, 10mm, 12mm, 16mm, 20mm, and 25mm.

    • The length of standard size steel rebar can vary based on project requirements.

    • Steel rebar is commonly used for reinforcement in concrete structures to improve strength and durability.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge good job
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Jul 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Have u any experience in this work
  • Ans. Sorry I don't have any experience in this work but I will try my level best
  • Answered Anonymously
Round 3 - HR 

(1 Question)

  • Q1. If u don't have any experience in the work so how u do it ?
  • Ans. Sir like computers build human but a computer can't build a human computer just build human carrer nothing else so I a human will try so his/her hand full world
  • Answered Anonymously
Round 4 - Aptitude Test 

Please tell us u how to make customer's

Round 5 - HR 

(1 Question)

  • Q1. Ok at first tell about u and ur dedication and journey hwhy u select this company
  • Ans. Hello sir my name is sourav Banerjee from nalhati Birbhum I am hs passed diploma in computer application hardware networking and I have 17 years experience in medicine retail counter there was some problems then I think I need a better life for me and my family
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't take call me
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Just asked job related questions and previous work experience
  • Q2. What work you do

Interview Preparation Tips

Interview preparation tips for other job seekers - Just well prepared about your current work experience

I applied via Referral and was interviewed in Dec 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. BBS, SHUTTERING, MATERIALS
Round 2 - HR 

(1 Question)

  • Q1. Details of company and responsibilities

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company, good team members, good relations all stap
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via campus placement at Visvesvaraya National Institute of Technology (VNIT), Nagpur and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Shear force and bmd
  • Q2. Types of beam ,propped cantiliver beam
  • Ans. 

    A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.

    • Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.

    • The prop helps to reduce the bending moment and deflection at the free end of the beam.

    • These beams are commonly used in construction to support overhanging structures or balconies.

    • Example...

  • Answered by AI
  • Q3. Which beam will have highest thickness
  • Ans. 

    The beam with the highest thickness will depend on the specific design and requirements of the structure.

    • The beam with the highest thickness will typically be a main load-bearing beam in the structure.

    • Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.

    • For example, a bridge beam supporting heavy traffic will likely have a higher thickness than

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Site Engineer interview:
  • Concrete
  • RCC
Interview preparation tips for other job seekers - basic core questions
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. There are many questions about previous experience and personal background.
  • Q2. Why are you losing your current Job?
Round 2 - Technical 

(1 Question)

  • Q1. How to manage team in EPC project.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 704 Interviews
Senco Gold Interview Questions
4.5
 • 484 Interviews
Swiggy Interview Questions
3.8
 • 425 Interviews
Quess Interview Questions
3.9
 • 392 Interviews
TCS iON Interview Questions
3.9
 • 363 Interviews
Planet Spark Interview Questions
3.7
 • 358 Interviews
Udaan Interview Questions
4.0
 • 334 Interviews
Meesho Interview Questions
3.7
 • 328 Interviews
Zomato Interview Questions
3.7
 • 315 Interviews
Ekart Logistics Interview Questions
4.0
 • 296 Interviews
View all
Veenus Engineering Site Manager Salary
based on 5 salaries
₹7.2 L/yr - ₹12.8 L/yr
6% more than the average Site Manager Salary in India
View more details
Electrical Engineer
6 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Desk Engineer
6 salaries
unlock blur

₹2 L/yr - ₹2.7 L/yr

Mechanical Engineer
5 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Site Manager
5 salaries
unlock blur

₹7.2 L/yr - ₹12.9 L/yr

Senior Engineer
4 salaries
unlock blur

₹4.2 L/yr - ₹5 L/yr

Explore more salaries
Compare Veenus Engineering with

Quess

3.9
Compare

L&T Construction

4.0
Compare

Udaan

4.0
Compare

Ekart Logistics

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview