i
vConstruct
Filter interviews by
Clear (1)
I applied via Campus Placement
Designing a model and site in Revit involves creating a 3D model of a building and its surroundings.
Start by creating a new project and setting up the project settings.
Import the site plan and create topography.
Create the building's footprint and extrude the walls to the desired height.
Add doors, windows, and other architectural elements.
Include MEP systems and structural elements.
Use rendering tools to visualize the f...
Top trending discussions
posted on 4 May 2019
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
posted on 30 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
based on 40 reviews
Rating in categories
Project Engineer
147
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Project Engineer
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
37
salaries
| ₹0 L/yr - ₹0 L/yr |
Data Analyst
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Software Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd