I applied via Campus Placement and was interviewed in Oct 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed before Aug 2023. There were 2 interview rounds.
No apti questions. Dont worry just do some basic questions.
Field oriented control (FOC) of permanent magnet synchronous motor (PMSM) is a control technique that allows for precise control of the motor's speed and torque.
FOC involves transforming the stator current and voltage into a rotating reference frame aligned with the rotor flux.
It allows for independent control of the motor's torque and flux, resulting in improved efficiency and performance.
Popular in electric vehicle p...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
I am a highly experienced Sr. Engineer with a strong background in various engineering disciplines.
Over 10 years of experience in mechanical, electrical, and civil engineering
Led multiple successful projects from concept to completion
Proficient in CAD software such as AutoCAD and SolidWorks
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 6 interview rounds.
Introduction and few case study intraction with MD sir
posted on 7 Nov 2023
I applied via Referral and was interviewed in Oct 2023. There were 3 interview rounds.
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
based on 2 interviews
Interview experience
based on 3 reviews
Rating in categories
Quality Engineer
333
salaries
| ₹1.2 L/yr - ₹6.8 L/yr |
Senior Engineer
259
salaries
| ₹2.8 L/yr - ₹9.4 L/yr |
Assistant Manager
239
salaries
| ₹5.5 L/yr - ₹13.9 L/yr |
Production Engineer
217
salaries
| ₹1.2 L/yr - ₹6.5 L/yr |
Maintenance Engineer
172
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
JBM Group
Subros
Endurance Technologies
Delphi TVS