Filter interviews by
Good quality can be achieved by implementing strict quality control measures, using high-quality materials, and continuous improvement processes.
Implement strict quality control measures to ensure consistency and reliability of products
Use high-quality materials to enhance the durability and performance of the products
Implement continuous improvement processes such as Six Sigma or Lean manufacturing to identify and eli...
Top trending discussions
I applied via Company Website and was interviewed in Feb 2023. There were 4 interview rounds.
Exam in your Tread and mathematics.
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Aptitude with logics, verbal and wuants
Experienced supervisor with a background in team management and project coordination.
Over 5 years of experience in supervisory roles
Skilled in team leadership and conflict resolution
Managed multiple projects simultaneously, ensuring timely completion
posted on 10 Jun 2024
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality produ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining th...
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross-trai...
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
I applied via Job Fair and was interviewed in Jan 2022. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Oct 2023. There were 3 interview rounds.
5S is a workplace organization method that improves efficiency and safety. 3M and 3K refer to the principles of Muda, Mura, and Muri in lean manufacturing. KANBAN is a visual scheduling system used to manage production flow.
5S involves Sort, Set in order, Shine, Standardize, and Sustain to create a clean and organized work environment.
3M (Muda, Mura, Muri) are the three types of waste in lean manufacturing - Muda (wast...
Manpower handling refers to managing and overseeing the workforce in a production setting. Kaizen is a continuous improvement philosophy aimed at making small, incremental changes for efficiency.
Manpower handling involves recruiting, training, scheduling, and supervising employees to ensure smooth production operations.
Kaizen is a Japanese term meaning 'continuous improvement'. It focuses on making small, incremental c...
I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.
Software Engineer
418
salaries
| ₹3.5 L/yr - ₹13.1 L/yr |
Senior Software Engineer
278
salaries
| ₹8 L/yr - ₹24 L/yr |
Senior Engineer
224
salaries
| ₹5.3 L/yr - ₹19.5 L/yr |
Design Engineer
215
salaries
| ₹3.9 L/yr - ₹12.1 L/yr |
CAD Engg
176
salaries
| ₹3.7 L/yr - ₹10.5 L/yr |
Bosch
Continental
Samvardhana Motherson Group
Mahindra & Mahindra