Procure to pay process involves obtaining goods or services from suppliers and paying for them.
The process starts with identifying the need for goods or services
Next, a purchase order is created and sent to the supplier
Goods or services are received and inspected
An invoice is received from the supplier
Payment is made to the supplier
Hindrances in the supply chain can include delays in transportation, lack of communication, quality control issues, and unexpected disruptions.
Delays in transportation can lead to late deliveries and increased costs
Lack of communication between stakeholders can result in misunderstandings and inefficiencies
Quality control issues can lead to defective products and customer dissatisfaction
Unexpected disruptions such as n...
Warehousing involves the storage of goods and materials in a designated location for easy access and distribution.
Warehousing is essential for storing inventory and raw materials before they are needed for production or distribution.
It helps in maintaining inventory levels, reducing lead times, and improving overall supply chain efficiency.
Different types of warehousing include public warehouses, private warehouses, an...
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
Geotechnical design involves analyzing soil properties to determine the stability of structures and foundations.
Understanding soil composition and behavior
Evaluating soil strength and stability
Selecting appropriate foundation types
Considering environmental factors
Using geotechnical software for analysis
Examples: calculating bearing capacity for a building foundation, designing retaining walls based on soil properties
The basic aspects of a wall include structure, material, insulation, and finish.
Structure: Walls can be load-bearing or non-load-bearing.
Material: Common materials include brick, concrete, wood, and drywall.
Insulation: Insulation helps regulate temperature and soundproofing.
Finish: Walls can be finished with paint, wallpaper, tiles, or other materials.
Utracon Structural Systems interview questions for popular designations
I applied via Referral and was interviewed before Nov 2020. There was 1 interview round.
ACI 318 and AISC are commonly used code books for RCC steel post tension seismic design.
ACI 318 is the American Concrete Institute's code book for concrete design.
AISC is the American Institute of Steel Construction's code book for steel design.
Post-tensioning is a technique used to reinforce concrete with high-strength steel strands.
Seismic design involves designing structures to withstand earthquakes.
RCC stands for r
Top trending discussions
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
I applied via Indeed and was interviewed in Feb 2024. There was 1 interview round.
I am from a small town in the Midwest called Springfield.
I grew up in a close-knit community surrounded by farmland.
Springfield is known for its annual corn festival.
The town has a population of around 10,000 people.
I am a detail-oriented accountant with 5 years of experience in financial reporting and analysis.
I have a Bachelor's degree in Accounting from XYZ University.
I am proficient in using accounting software such as QuickBooks and SAP.
I have experience preparing monthly financial statements and analyzing variances.
I am a Certified Public Accountant (CPA) and stay updated on accounting regulations.
I have excellent communicat...
I am a detail-oriented accountant with a strong track record of accuracy and efficiency in financial reporting.
I have a Bachelor's degree in Accounting and 5 years of experience in the field.
I am proficient in using accounting software such as QuickBooks and Excel.
I have a proven ability to analyze financial data and identify areas for improvement.
I am a team player and have excellent communication skills, allowing me ...
It is not acceptable to not provide PF and pay salary in cash as it is against labor laws and can lead to legal issues.
It is illegal to not provide PF as it is a mandatory benefit for employees.
Cash payments can lead to tax evasion and are not traceable.
It is important to have a proper payroll system in place for transparency and compliance.
Employees may face difficulties in proving their income for loans or other purp
Yes, it is okay if travelling is not provided.
I am comfortable with not being provided travelling for work.
I am willing to make my own travel arrangements if necessary.
I understand that travelling may not be a part of the job requirements.
I am open to remote work options if travelling is not provided.
I applied via Referral
Give coding test as per your expert area, you will have options in the code test to select programming language. please do not copy code in test and allocate dedicated time of 2 to 3 hours for coding test.
posted on 1 Sep 2023
I applied via Walk-in
posted on 21 May 2023
I applied via Referral and was interviewed in Apr 2023. There were 4 interview rounds.
I am an experienced Warehouse Supervisor with a strong track record in managing warehouse operations and leading teams.
I have 5 years of experience in warehouse management, ensuring efficient and accurate inventory control.
I have successfully implemented process improvements that resulted in a 20% increase in productivity.
I have a proven ability to lead and motivate teams, resulting in high employee satisfaction and lo...
The process of purchase involves identifying the need, selecting a supplier, placing an order, receiving the goods, and making payment.
Identify the need for the product or service
Select a supplier based on factors such as price, quality, and delivery time
Place an order with the supplier, specifying the quantity, delivery date, and payment terms
Receive the goods and inspect them for quality and quantity
Make payment to t
I will review the request and determine if it is within our capabilities and budget. If so, I will assign the task to a qualified mechanic.
Review the request thoroughly
Determine if it is within our capabilities and budget
Assign the task to a qualified mechanic
Ensure that all necessary parts and equipment are available
Monitor progress and ensure that the job is completed on time
I would prefer good quality tires for the tractor.
Good quality tires will ensure better performance and durability of the tractor.
They will also provide better traction and stability on different terrains.
Low quality tires may save money in the short term but will cost more in the long run due to frequent replacements and repairs.
Examples of good quality tire brands are Michelin, Goodyear, and Bridgestone.
For a Tripper Truck, I would prefer good quality tires.
Good quality tires will ensure better performance and safety on the road.
They will also last longer and require less maintenance.
Examples of good quality tire brands include Michelin, Bridgestone, and Goodyear.
Tyres will be stored in a designated area based on their type and size.
Sort tyres based on type and size
Store them in a designated area
Ensure proper labeling and organization
Regularly check for damages or wear and tear
I follow a strict process to ensure the battery is issued correctly and safely.
Check the equipment or machine's battery requirements
Ensure the battery is fully charged and in good condition
Properly label the battery with the equipment or machine's identification number
Record the battery issuance in a logbook
Train the equipment or machine operator on proper battery handling and charging procedures
Upon receiving materials, I check the documents for accuracy and completeness before inspecting the materials.
Verify the accuracy and completeness of the documents accompanying the materials
Inspect the materials for any damage or discrepancies
Ensure that the materials are properly labeled and stored in the appropriate location
Update inventory records and communicate any issues to the appropriate parties
Maintain a clean
I would politely inform them that a requisition copy is required for issuing material and guide them through the process.
Explain the importance of requisition copy in maintaining inventory accuracy and avoiding discrepancies
Offer to assist them in filling out a requisition form if needed
If the situation is urgent, contact the appropriate authority for approval before issuing the material
Document the incident for future
Civil materials include cement, bricks, and steel. Mechanical materials include gears, bearings, and bolts. Electrical materials include wires, switches, and transformers.
Civil materials are used in construction and infrastructure projects
Mechanical materials are used in machinery and equipment
Electrical materials are used in electrical systems and circuits
Examples of civil materials include cement, bricks, and steel
Ex...
I ensure safety by implementing proper training, regular inspections, and enforcing safety protocols.
Conduct regular safety training for all employees
Perform routine safety inspections and address any hazards immediately
Enforce safety protocols such as wearing appropriate PPE and following proper lifting techniques
Maintain clear and organized aisles to prevent tripping hazards
Ensure all equipment is properly maintained...
I am an experienced warehouse supervisor with strong leadership skills and a track record of improving efficiency and productivity.
I have 5 years of experience in warehouse management
I have successfully implemented lean principles to reduce waste and increase productivity
I have trained and supervised a team of 20 warehouse staff
I have implemented inventory control systems to ensure accurate stock levels
I have a strong ...
I would expect a salary that is competitive for the role and reflects my experience and skills.
Research the average salary range for Warehouse Supervisors in your area
Consider your years of experience and any relevant certifications
Highlight your skills and accomplishments that make you deserving of a higher salary
Be prepared to negotiate and discuss benefits and opportunities for growth
based on 4 interviews
Interview experience
based on 87 reviews
Rating in categories
Site Engineer
29
salaries
| â‚ą1.6 L/yr - â‚ą4 L/yr |
Design Engineer
21
salaries
| â‚ą2.2 L/yr - â‚ą5.6 L/yr |
Civil Site Engineer
21
salaries
| â‚ą1.5 L/yr - â‚ą4.6 L/yr |
Structural Design Engineer
20
salaries
| â‚ą3.3 L/yr - â‚ą6.6 L/yr |
Project Engineer
10
salaries
| â‚ą3.5 L/yr - â‚ą5 L/yr |
Sterling & Wilson
ITD Cementation India
Simplex Infrastructures
Nagarjuna Construction Company