Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Sep 2024.Ā There were 4 interview rounds.
To reclaim career growth, one must set clear goals, seek new opportunities, continuously learn and develop skills, network, and seek mentorship.
Set clear career goals to have a direction to work towards
Seek new opportunities within current organization or externally
Continuously learn and develop new skills to stay relevant in the industry
Network with professionals in the field to expand opportunities
Seek mentorship fro...
Financial benefits should be negotiated based on the candidate's qualifications, experience, industry standards, and company budget.
Consider the candidate's qualifications and experience when determining financial benefits.
Research industry standards to ensure the offer is competitive.
Take into account the company's budget and financial constraints.
Negotiate benefits such as salary, bonuses, stock options, and other pe...
Job responsibilities
For more information about company
I applied via Company Website and was interviewed in Mar 2023.Ā There was 1 interview round.
Prepare quant well.
Prepare for a on-spot case study
I applied via Campus Placement and was interviewed before Dec 2022.Ā There were 3 interview rounds.
English
Reasoning
Chemical engineering questions
Etc
Utkal Alumina International interview questions for popular designations
I applied via Walk-in and was interviewed before Nov 2022.Ā There were 3 interview rounds.
Yes, I am ready to join without housing.
I am open to finding my own housing arrangements.
I understand that joining without housing means I will need to secure accommodation on my own.
I am prepared to handle the logistics and costs associated with finding housing.
I have experience in relocating for work and have successfully found housing in the past.
Yes, I am still willing to join despite the lower CTC.
I am more interested in the growth opportunities and the potential to learn and develop my skills.
Salary is not the only factor that determines job satisfaction for me.
I believe in the long-term benefits of working in a challenging and rewarding role.
I am confident that my skills and experience will enable me to contribute significantly to the organization.
I am open...
As a botany student, I believe joining this industry will allow me to contribute to sustainable practices and conservation efforts.
I am passionate about finding ways to balance industrial needs with environmental preservation
I believe that by working in this industry, I can help promote sustainable practices and responsible resource management
I am interested in exploring alternative solutions to tree cutting, such as r...
I applied via Approached by Company and was interviewed before Aug 2021.Ā There were 4 interview rounds.
Aptitude and technical test
I applied via LinkedIn and was interviewed in Aug 2021.Ā There were 3 interview rounds.
I applied via Company Website and was interviewed in Apr 2021.Ā There were 3 interview rounds.
Equipment running hours can be controlled through regular maintenance, monitoring, and scheduling.
Implement a preventive maintenance program to ensure regular servicing and upkeep of the equipment.
Monitor the running hours of the equipment using hour meters or monitoring systems.
Set up a schedule for equipment usage to avoid excessive running hours.
Train operators and maintenance staff on proper equipment handling and ...
To run ESP normally, ensure proper maintenance, regular cleaning, and monitoring of operating parameters.
Perform routine maintenance to keep the ESP in good working condition.
Regularly clean the ESP to remove accumulated ash and prevent clogging.
Monitor operating parameters such as gas flow rate, temperature, and voltage to ensure optimal performance.
Adjust the ESP settings as needed to maintain efficient ash handling.
...
To maintain the bottom ash hopper, regular cleaning, inspection, and maintenance are required.
Regularly clean the bottom ash hopper to remove any accumulated ash or debris.
Inspect the hopper for any signs of damage or wear, such as cracks or leaks.
Repair or replace any damaged components to ensure proper functioning.
Check the hopper's discharge system to ensure smooth ash flow.
Monitor the hopper's temperature and press...
To stop ash splage at silo area and overall ash plant area, implement proper sealing measures and regular maintenance.
Install air-tight seals on silo doors and hatches to prevent ash leakage.
Regularly inspect and repair any cracks or gaps in the silo structure.
Implement a dust suppression system to minimize airborne ash particles.
Ensure proper ventilation and airflow in the ash plant area to prevent ash accumulation.
Re...
Emergency preparedness for ash leakage includes immediate response, containment measures, evacuation plans, and communication protocols.
Immediate response: Activate emergency alarms and notify relevant personnel.
Containment measures: Deploy barriers or containment systems to prevent further leakage.
Evacuation plans: Have pre-established evacuation routes and assembly points for personnel.
Communication protocols: Establ...
The AHP process log sheet is a document used to record and track the activities and progress of ash handling incharge.
Start by creating a table with columns for date, time, activity description, and remarks.
Record the date and time of each activity performed by the ash handling incharge.
Describe each activity in detail, including the equipment used and the specific task performed.
Include any observations or remarks rel...
To work a equipment with safety behavior, one must follow proper training, wear appropriate protective gear, and adhere to safety protocols.
Receive proper training on how to operate the equipment safely
Wear appropriate personal protective equipment (PPE) such as gloves, goggles, and helmets
Follow safety protocols and guidelines provided by the manufacturer or employer
Regularly inspect the equipment for any potential ha...
I applied via Walk-in and was interviewed in May 2021.Ā There was 1 interview round.
Process isolation is required in equipment maintenance jobs to ensure safety and prevent damage.
Process isolation involves disconnecting the equipment from its power source and locking out any potential sources of energy.
This is done to prevent accidental start-up or release of stored energy during maintenance.
Examples of process isolation methods include lockout/tagout procedures, electrical isolation, and mechanical ...
Safety requirements for plant entry include personal protective equipment, training, and following established procedures.
Wearing appropriate personal protective equipment (PPE) such as hard hats, safety glasses, and steel-toed boots
Completing required safety training before entering the plant
Following established procedures for entering and exiting the plant, including checking in with security and obtaining necessary...
I applied via Recruitment Consulltant and was interviewed before Mar 2021.Ā There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the Utkal Alumina International interview -
based on 8 interviews
Interview experience
based on 158 reviews
Rating in categories
Assistant Manager
31
salaries
| ā¹6.8 L/yr - ā¹15.5 L/yr |
Junior Engineer
30
salaries
| ā¹2.8 L/yr - ā¹8 L/yr |
Manager
23
salaries
| ā¹12.5 L/yr - ā¹21 L/yr |
Deputy Manager
21
salaries
| ā¹6.5 L/yr - ā¹16 L/yr |
Instrument Engineer
17
salaries
| ā¹3.6 L/yr - ā¹7 L/yr |
Hindalco Industries
Vedanta Limited
Nalco
Aditya Birla Group