Upload Button Icon Add office photos

Filter interviews by

Usha Constructions Interview Questions and Answers

Updated 12 Jul 2022

Usha Constructions Interview Experiences

Popular Designations

2 interviews found

Land Surveyor Interview Questions & Answers

user image Anonymous

posted on 12 Jul 2022

I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

Utilizing information collected from the airport survey effort, 15 airports were selected for case study interviews based upon their survey responses. The airports that were chosen display. a variety of common themes; however, in many instances they have unique situations related to land use that can be drawn upon. Interviews were conducted through telephone and in-person site visits. During these interviews, the team gathered a more detailed assessment of land use top ics at each individual airport. This information was then analyzed and compiled into individual case study reports. The following reports have been developed to summarize the interpretation of each individual airport and situation.

Round 3 - Group Discussion 

A group discussion is a small-group discussion guided by a trained leader. It is used to learn about opinions on a designated topic, and to guide future action.

Interview Preparation Tips

Interview preparation tips for other job seekers - Job seeking is never fun, of course, but a well-prepared job seeker is more likely to find the process less stressful. Looking for work is not a science and there are many factors that come into play, but in conducting a job search in today's current market, there are a number of things that everyone will be happier to know from the outset.

Land Surveyor Interview Questions asked at other Companies

Q1. Convert quadrant bearing to whole circle bearing.
View answer (2)

I applied via Job Fair and was interviewed before Mar 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Discussed about work experience & technical work like erp software etc

Round 3 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why are you looking for a change?
Round 4 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?

Interview Preparation Tips

Interview preparation tips for other job seekers - I am working in usha constructions, so I feel better & my all work experience is going development and thanks to Usha constructions to give opportunity.

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)

Jobs at Usha Constructions

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What about last company working
  • Ans. 

    I worked at a software development company specializing in cloud solutions.

    • Developed and maintained cloud-based applications

    • Collaborated with cross-functional teams to troubleshoot and resolve technical issues

    • Participated in regular code reviews and testing processes

  • Answered by AI
  • Q2. How much experience you have in IT.
  • Ans. 

    I have 5 years of experience in IT, specializing in network infrastructure and system administration.

    • 5 years of experience in IT

    • Specializing in network infrastructure and system administration

    • Certifications in Cisco CCNA and Microsoft MCSA

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why you are looking for job in IRB
  • Ans. 

    I am looking for a job in IRB because of the company's reputation for innovation and growth opportunities.

    • Interested in working for a company known for innovation

    • Seeking growth opportunities within the organization

    • Impressed by IRB's reputation in the industry

  • Answered by AI
  • Q2. How much salary do you want in IRB.
  • Ans. 

    I am looking for a competitive salary that reflects my skills and experience in the industry.

    • Research the average salary range for System Engineers in the industry and location

    • Consider your level of experience, certifications, and skills when determining your salary expectations

    • Be prepared to negotiate based on the benefits package offered by the company

    • Provide a salary range rather than a specific number to allow for

  • Answered by AI

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Details about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Question from subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills

Usha Constructions Interview FAQs

How many rounds are there in Usha Constructions interview?
Usha Constructions interview process usually has 3-4 rounds. The most common rounds in the Usha Constructions interview process are Resume Shortlist, Group Discussion and HR.
How to prepare for Usha Constructions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Usha Constructions. The most common topics and skills that interviewers at Usha Constructions expect are Site Supervision, Boq, Civil Engineering, Quantity Surveying and Budget Management.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 426 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Usha Constructions Reviews and Ratings

based on 24 reviews

3.5/5

Rating in categories

3.4

Skill development

3.1

Work-life balance

3.2

Salary

3.2

Job security

3.3

Company culture

3.3

Promotions

3.4

Work satisfaction

Explore 24 Reviews and Ratings
Quantity Surveyor/Billing engineer

Ernakulam,

Bangalore / Bengaluru

2-7 Yrs

Not Disclosed

Explore more jobs
Site Engineer
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Incharge
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accountant
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Purchase Manager
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Usha Constructions with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview