Upload Button Icon Add office photos

Filter interviews by

Universal Mep Projects & Engineering Services Assistant Manager Interview Questions and Answers

Updated 6 Jan 2025

Universal Mep Projects & Engineering Services Assistant Manager Interview Experiences

3 interviews found

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is the function of heating and ventilation air conditioning
  • Ans. 

    Heating, ventilation, and air conditioning (HVAC) systems are responsible for regulating temperature, humidity, and air quality in indoor spaces.

    • HVAC systems control temperature by heating or cooling air as needed

    • Ventilation systems circulate fresh air and remove stale air to maintain indoor air quality

    • Air conditioning systems remove heat and humidity from the air to create a comfortable environment

    • HVAC systems can als...

  • Answered by AI
  • Q2. How can be CFM derived ?
  • Ans. 

    CFM can be derived using the formula: CFM = (Air velocity in feet per minute) x (Cross-sectional area in square feet)

    • Calculate the air velocity in feet per minute

    • Determine the cross-sectional area in square feet

    • Multiply the air velocity by the cross-sectional area to get the CFM value

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your salary expectation
  • Ans. 

    My salary expectation is based on my experience, qualifications, and the responsibilities of the role.

    • Consider the industry standards for the position

    • Factor in your level of experience and qualifications

    • Research the cost of living in the area where the job is located

    • Be prepared to negotiate based on the responsibilities of the role

  • Answered by AI
  • Q2. Will you relocate to ahmedabad
  • Ans. 

    Yes, I am willing to relocate to Ahmedabad for the Assistant Manager position.

    • I am open to relocating for the right career opportunity.

    • I have researched Ahmedabad and am excited about the potential of living and working there.

    • I have no personal commitments that would prevent me from relocating.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Water makup calculations
  • Q2. IS codes for pipe laying
  • Ans. 

    IS codes for pipe laying are standards set by the Bureau of Indian Standards for the laying of pipes in construction projects.

    • IS 7634: Code of practice for laying of asbestos cement pressure pipes

    • IS 7635: Code of practice for laying of asbestos cement drain pipes

    • IS 7636: Code of practice for laying of asbestos cement rain water pipes

    • IS 7637: Code of practice for laying of asbestos cement sewer pipes

    • IS 7638: Code of pra...

  • Answered by AI

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Subject matter questions with basic maths reasoning etc questions are asked.

Round 2 - One-on-one 

(1 Question)

  • Q1. Job related based on your experience related to the job description

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jan 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Aptitude Tests Basically tests your quantitative and qualitative skills related to the particular Job you have applied.

Round 3 - Group Discussion 

Through GD's interviewer wants to know how well communicate in a tough scenario and ho well you behave when upfronts are given back to back in real-time scenarios.

Round 4 - One-on-one 

(3 Questions)

  • Q1. Basic One is How would you like to define yourself? That's basically decides your capabilities to let interviewer thinks of the new question from your defination.
  • Q2. Some Technical questions but I must say intermediate level of questions you have to tackle when interviewer is on mood to level you down...!
  • Q3. Salay Negotiation, the main part of your whole and sole interview on which you're totally rely on, This has to be managed by yourself and your judgement on your past salary and accordingly you can strive t...

Interview Preparation Tips

Topics to prepare for Tata Projects Assistant Manager interview:
  • Project management
  • Strategic Planning
  • Construction Management
  • Material Procurement
  • Quality Management
  • Safety Management
  • Sub Contractor Billing
  • Bill Processing
  • ERP System
Interview preparation tips for other job seekers - The Quality of your Interview depends upon on what interpersonal skills you have and how solely you manage to express them when you have to upfront in real world.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. All About Elevated Metro related Questions. Like Pile foundation Pile cap Pier Pier cap
  • Q2. 1). About your self. 2). Pile foundation 3). Pile Cap 4). IS code

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare according to Company skill requirements for projects. otherwise you are not qualify in interview.

Interview Questionnaire 

3 Questions

  • Q1. Related to railway electrification
  • Ans. Having experience in both metro and railways project
  • Answered by Manish Kumar Singh
  • Q2. What type of testing we perform in TSS
  • Ans. 

    TSS performs various types of testing including functional, regression, performance, and security testing.

    • Functional testing ensures that the software meets the specified requirements.

    • Regression testing ensures that changes made to the software do not introduce new defects.

    • Performance testing checks the software's speed, scalability, and stability under various loads.

    • Security testing checks the software's vulnerability...

  • Answered by AI
  • Q3. We perform specific testing for specific equipment, Meger for all except LA

Interview Preparation Tips

Interview preparation tips for other job seekers - Financial crunch phase running out in this company , hr policy is good

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Experience related
  • Q2. Technical Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Quantity aptitude, numerical methods

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for Group discussion and personal interview

Universal Mep Projects & Engineering Services Interview FAQs

How many rounds are there in Universal Mep Projects & Engineering Services Assistant Manager interview?
Universal Mep Projects & Engineering Services interview process usually has 1-2 rounds. The most common rounds in the Universal Mep Projects & Engineering Services interview process are One-on-one Round, Aptitude Test and Technical.
What are the top questions asked in Universal Mep Projects & Engineering Services Assistant Manager interview?

Some of the top questions asked at the Universal Mep Projects & Engineering Services Assistant Manager interview -

  1. what is the function of heating and ventilation air condition...read more
  2. How can be CFM derive...read more
  3. IS codes for pipe lay...read more

Tell us how to improve this page.

Universal Mep Projects & Engineering Services Assistant Manager Interview Process

based on 3 interviews

Interview experience

3.3
  
Average
View more
Universal Mep Projects & Engineering Services Assistant Manager Salary
based on 40 salaries
₹5.8 L/yr - ₹13.4 L/yr
At par with the average Assistant Manager Salary in India
View more details

Universal Mep Projects & Engineering Services Assistant Manager Reviews and Ratings

based on 15 reviews

3.7/5

Rating in categories

3.8

Skill development

3.5

Work-life balance

4.0

Salary

3.7

Job security

3.4

Company culture

3.1

Promotions

3.5

Work satisfaction

Explore 15 Reviews and Ratings
Assistant Manager
40 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Executive
24 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Service Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager Commercial
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Universal Mep Projects & Engineering Services with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Sterling & Wilson

4.1
Compare

Voltas

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview