Filter interviews by
Top trending discussions
I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
BBS stands for Behavior-Based Safety. It is a type of survey used to identify and prevent workplace hazards.
BBS focuses on observing and analyzing employee behavior to identify potential safety hazards
The survey involves collecting data on the frequency and severity of unsafe behaviors
The goal of BBS is to create a safer work environment by addressing the root causes of unsafe behavior
Examples of BBS surveys include sa...
I applied via AmbitionBox and was interviewed in Mar 2024. There was 1 interview round.
Density of steel, concrete, and PCC varies based on composition and materials used.
Density of steel is around 7850 kg/m^3
Density of normal concrete is around 2400 kg/m^3
Density of PCC (Plain Cement Concrete) is around 2200 kg/m^3
Density can vary based on the mix design and additives used
posted on 20 Dec 2020
I appeared for an interview before Dec 2019.
I applied via Indeed and was interviewed in Nov 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.
I passed HSLC in 2015.
I passed HSLC in 2015.
I completed my HSLC in 2015.
I cleared the HSLC examination in 2015.
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
posted on 21 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
9
salaries
| ₹3.6 L/yr - ₹7 L/yr |
Executive Accountant
8
salaries
| ₹2.4 L/yr - ₹3.4 L/yr |
Project Manager
6
salaries
| ₹7.8 L/yr - ₹16 L/yr |
Head Human Resources
4
salaries
| ₹8.4 L/yr - ₹8.8 L/yr |
Graduate Engineer Trainee (Get)
4
salaries
| ₹1.1 L/yr - ₹2.4 L/yr |
GAMMON INDIA
McNally Bharat Engineering
Military Engineer Services
Chetak Enterprises