Upload Button Icon Add office photos

Filter interviews by

United Engineering Construction Llc Interview Questions and Answers

Updated 9 Jan 2025

United Engineering Construction Llc Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Hose wiring other wiring
  • Q2. Networking
Round 2 - Technical 

(2 Questions)

  • Q1. All wiring, hoses etc
  • Q2. Networking etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience 10 years
Transformer Raparing
Ups Raparing

Maintenance Electrician Interview Questions asked at other Companies

Q1. What is motor in electrical engineering
View answer (4)

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. Working purpos
  • Q2. How to E. T. S work
  • Ans. 

    ETS (Educational Testing Service) is a non-profit organization that develops and administers standardized tests.

    • ETS develops and administers tests like the GRE, TOEFL, and Praxis exams.

    • The organization also offers research and assessment services for educational institutions.

    • ETS uses computer-based testing and scoring for many of its exams.

    • The organization has faced criticism for its role in the standardized testing in

  • Answered by AI

Interview Questionnaire 

4 Questions

  • Q1. What is Google sheets
  • Ans. 

    Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.

    • Allows users to create and edit spreadsheets online

    • Offers collaboration features for real-time editing and commenting

    • Can import and export various file formats, including Microsoft Excel

    • Offers add-ons and scripts for automation and customization

    • Accessible from any device with internet connection

  • Answered by AI
  • Q2. What is the MDD & OMC of soil
  • Ans. 

    MDD & OMC are important parameters for soil compaction and moisture content.

    • MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.

    • OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.

    • These parameters are important for determining the appropriate moisture content and compaction effort for...

  • Answered by AI
  • Q3. What is the velocity of steel
  • Ans. 

    The velocity of steel varies depending on the type and conditions.

    • The velocity of steel can range from 5000 to 6000 meters per second

    • The velocity of steel can be affected by factors such as temperature and pressure

    • The velocity of steel is important in industries such as construction and manufacturing

  • Answered by AI
  • Q4. What is the cube test result in 7 days
  • Ans. 

    The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.

    • The cube test can refer to various tests in different fields such as construction, engineering, and materials science.

    • For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.

    • The result of the cube test can vary depending on factors such as the ty...

  • Answered by AI

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous Project experience. Execution plan, Job responsibility, Technical for Electrical SLD, Chiller SLD, Functional test for all MEP items.

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to give correct answer, What you have mentioned in your CV the same question will be raise from Technical Board...

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your experience and ur self like education etc
  • Q2. What do you work in your profile.
  • Q3. Can you handle RVNL project
  • Ans. 

    Yes, I have experience in handling RVNL projects.

    • I have previously managed a similar railway project

    • I am familiar with the processes and regulations involved

    • I have a strong team to support me

    • I am confident in my ability to deliver the project on time and within budget

  • Answered by AI

I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is the previous job role ?
  • Q2. What is the percentage of bitumen in DBM ?
  • Ans. 

    The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.

    • DBM stands for Dense Bituminous Macadam, which is a type of road construction material.

    • The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.

    • The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.

    • Higher percentages of bitumen a...

  • Answered by AI
  • Q3. Why you want change your company ?
  • Q4. What is your salary expectation ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't expect genuine to salary hike, really so sad to genuine salary negotiation Person .

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.

Round 2 - Technical 

(1 Question)

  • Q1. It was all basic accounting question.mostly related to 12th standard c v raman book Friendly interviewers
Round 3 - HR 

(1 Question)

  • Q1. 5 min telephonic call with recruiter

Interview Preparation Tips

Interview preparation tips for other job seekers - Get yourself prepared with basic accounting questions and be confident

United Engineering Construction Llc Interview FAQs

How many rounds are there in United Engineering Construction Llc interview?
United Engineering Construction Llc interview process usually has 2 rounds. The most common rounds in the United Engineering Construction Llc interview process are Technical.
What are the top questions asked in United Engineering Construction Llc interview?

Some of the top questions asked at the United Engineering Construction Llc interview -

  1. Hose wiring other wir...read more
  2. All wiring, hoses ...read more
  3. Networking ...read more

Tell us how to improve this page.

United Engineering Construction Llc Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 757 Interviews
Tata Projects Interview Questions
4.2
 • 449 Interviews
KEC International Interview Questions
4.0
 • 309 Interviews
Tata Technologies Interview Questions
3.6
 • 263 Interviews
TCE Interview Questions
3.7
 • 251 Interviews
View all

United Engineering Construction Llc Reviews and Ratings

based on 32 reviews

4.4/5

Rating in categories

4.7

Skill development

4.4

Work-life balance

4.5

Salary

4.3

Job security

4.3

Company culture

4.3

Promotions

4.5

Work satisfaction

Explore 32 Reviews and Ratings
QA QC Engineer
4 salaries
unlock blur

₹2 L/yr - ₹10 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹3.2 L/yr - ₹3.8 L/yr

Data Entry Operator
4 salaries
unlock blur

₹2.2 L/yr - ₹2.7 L/yr

Ward Boy
4 salaries
unlock blur

₹4.1 L/yr - ₹4.1 L/yr

Engineer
3 salaries
unlock blur

₹4.2 L/yr - ₹27 L/yr

Explore more salaries
Compare United Engineering Construction Llc with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview