UltraTech Cement
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
IS code for testing of raw materials is essential for quality control in chemistry.
IS 3400: Methods for testing of raw materials for the paint industry
IS 1708: Methods for testing of raw materials for the rubber industry
IS 5402: Methods for testing of raw materials for the pharmaceutical industry
IS code of Slump Testing is IS: 1199-1959
IS code for Slump Testing is IS: 1199-1959
Slump test is conducted to measure the workability of concrete
The test involves filling a slump cone with concrete, then removing the cone and measuring the amount of slump
Cube sampling is a method used to collect representative samples from a larger batch or population.
Cube sampling involves dividing a larger batch or population into smaller cubes or sections.
Random cubes are then selected for sampling to ensure representativeness.
This method is commonly used in industries like pharmaceuticals, food production, and materials testing.
Precautions before loading concrete include checking the quality of materials, ensuring proper mixing, and inspecting the equipment.
Check the quality of materials such as cement, aggregates, and water to ensure they meet specifications.
Ensure proper mixing of the concrete to achieve the desired strength and consistency.
Inspect the equipment used for loading, such as trucks or conveyors, to ensure they are in good worki...
Handle customer complaints by listening, empathizing, investigating, resolving, and following up.
Listen actively to the customer's concerns without interrupting
Empathize with the customer and acknowledge their frustration
Investigate the issue thoroughly to understand the root cause
Resolve the issue promptly and effectively, offering solutions or compensation if necessary
Follow up with the customer to ensure their satis
Managing cost/m³ involves optimizing processes, reducing waste, and negotiating with suppliers.
Optimize processes to increase efficiency and reduce costs
Reduce waste by implementing recycling programs or using raw materials more efficiently
Negotiate with suppliers for better pricing or discounts
Monitor and track expenses to identify areas for cost savings
Implement cost-saving measures such as bulk purchasing or outsour
Site sampling can be managed by following proper protocols, ensuring representative samples, and maintaining accurate records.
Develop a sampling plan outlining the objectives, methods, and locations for sampling.
Use appropriate sampling techniques to ensure representative samples are collected.
Follow standard operating procedures for sample collection, handling, and storage.
Maintain accurate records of sampling activit...
Efficient supply to customers can be achieved by optimizing inventory management, streamlining production processes, and utilizing technology.
Optimize inventory management by implementing just-in-time inventory system
Streamline production processes to reduce lead times and increase production capacity
Utilize technology such as automated ordering systems and real-time tracking for better supply chain visibility
Maintain workability & quality by proper planning, monitoring, testing, and communication.
Develop a detailed quality control plan outlining procedures and specifications.
Regularly monitor and test materials and processes to ensure compliance with standards.
Communicate effectively with all stakeholders to address any issues or changes in requirements.
Implement corrective actions promptly to maintain quality and workabil...
In case of a crisis in raw material supply, it is important to take immediate actions to mitigate the impact on production and quality control.
Communicate with suppliers to understand the root cause of the supply crisis
Identify alternative sources of raw materials to ensure continuity of production
Prioritize critical products and allocate available raw materials accordingly
Implement strict quality control measures to e...
30 objectives questions including 10 each maths,reasoning and English in which we have to pass by obtaining 10 marks in 30 mint and I cleared 27 marks .
Group discussion along with other competitors 5 members to know about English fluency and skill Setup
RMC plant stands for Ready Mix Concrete plant, used for producing concrete in a centralized location and delivering it to construction sites.
RMC plant is used for producing concrete in large quantities at a centralized location.
It helps in ensuring consistent quality of concrete mixtures.
The concrete produced in RMC plants is transported to construction sites using transit mixers.
RMC plants are equipped with computeriz...
Different components used in a plant include pumps, valves, motors, compressors, and boilers, each with specific functions and maintenance requirements.
Pumps are used to transfer fluids within the plant and require regular inspection for leaks and proper functioning.
Valves control the flow of fluids and gases in the plant and need to be checked for leaks and corrosion.
Motors power various equipment in the plant and sho...
To reduce cost and increase sales in the cement business, focus on optimizing production processes, improving distribution channels, and implementing effective marketing strategies.
Optimize production processes to reduce manufacturing costs
Improve distribution channels to reach more customers and increase sales
Implement effective marketing strategies to promote the product and attract new customers
Ultratech will be good for me because of its strong reputation in the industry, advanced technology, and commitment to sustainability.
Ultratech has a strong reputation in the industry for quality products and services
They invest in advanced technology to improve efficiency and productivity
Ultratech is committed to sustainability practices, which align with my values
I was interviewed before Mar 2024.
What people are saying about UltraTech Cement
I was interviewed in Jan 2025.
I am a recent graduate with a diploma in engineering, eager to learn and grow in a professional setting.
Recent graduate with a diploma in engineering
Eager to learn and grow in a professional setting
Strong problem-solving skills
Good communication skills
Experience with relevant software/tools (mention specific ones if applicable)
Isothermic: constant temperature, Endothermic: absorbs heat, Exothermic: releases heat
Isothermic: process at constant temperature
Endothermic: absorbs heat from surroundings
Exothermic: releases heat to surroundings
Example: Isothermal expansion of ideal gas
Example: Endothermic reaction like photosynthesis
Example: Exothermic reaction like combustion
I completed a 6-month internship at a civil engineering firm, where I gained hands-on experience in structural design and project management.
Worked on designing structural elements for commercial buildings
Assisted in conducting site visits and inspections
Collaborated with senior engineers on project planning and scheduling
Prepared technical reports and presentations for clients
Types of reactions include synthesis, decomposition, single displacement, double displacement, combustion, and redox reactions.
Synthesis reaction: A + B -> AB
Decomposition reaction: AB -> A + B
Single displacement reaction: A + BC -> AC + B
Double displacement reaction: AB + CD -> AD + CB
Combustion reaction: Fuel + O2 -> CO2 + H2O
Redox reaction: Involves transfer of electrons
Types of flow include laminar flow, turbulent flow, and transitional flow.
Laminar flow: smooth and orderly flow with parallel layers of fluid moving in the same direction.
Turbulent flow: chaotic and irregular flow with mixing of fluid particles in all directions.
Transitional flow: flow that exhibits characteristics of both laminar and turbulent flow.
Examples: Water flowing in a pipe (laminar flow), river rapids (turbul...
Kinetic energy is the energy possessed by an object due to its motion.
Kinetic energy is directly proportional to the mass of the object and the square of its velocity.
The formula for kinetic energy is KE = 0.5 * m * v^2, where m is the mass of the object and v is its velocity.
Examples of kinetic energy include a moving car, a swinging pendulum, or a flying bird.
UltraTech Cement interview questions for popular designations
My notice period is one month.
Notice period is one month
I am required to give one month's notice before leaving my current position
I can start in one month's time
I have a Bachelor's degree in Occupational Health and Safety from XYZ University.
Bachelor's degree in Occupational Health and Safety
Completed courses in workplace safety regulations
Hands-on training in emergency response procedures
I have 10 years of experience in the Safety field, facing challenges in construction sites.
Ensuring compliance with safety regulations and protocols
Implementing safety training programs for construction workers
Conducting regular safety inspections and audits
Addressing hazards such as falls, electrical hazards, and equipment safety
Investigating accidents and near misses to prevent future incidents
Get interview-ready with Top UltraTech Cement Interview Questions
Diagnosing and troubleshooting IT network problems.
Identify the specific issue reported by the user
Check network connectivity and configuration settings
Use network monitoring tools to analyze traffic and identify bottlenecks
Test network devices and cables for faults
Update firmware and software patches as needed
The Oitds network problem is likely caused by a connectivity issue or configuration error.
Check network cables and connections for any physical damage or loose connections.
Verify network settings and configurations to ensure they are correct.
Run network diagnostic tools to identify any issues with the network infrastructure.
Restart network devices such as routers, switches, and modems to refresh connections.
Diagnosing and troubleshooting hardware problems in IT systems.
Identify the specific hardware component causing the issue
Check for loose connections or cables
Run diagnostic tests to pinpoint the problem
Update drivers or firmware if necessary
Consider hardware replacement if the issue persists
Troubleshooting IT and network problems requires a systematic approach and knowledge of various tools and technologies.
Identify the specific issue or symptom reported by the user
Check network connectivity and hardware status
Review logs and error messages for clues
Use diagnostic tools like ping, traceroute, and Wireshark
Consider potential causes such as misconfigurations, software bugs, or hardware failures
I applied via Company Website and was interviewed in Dec 2024. There were 3 interview rounds.
I am prepared for your aptitude test.
Yes, I am ready of trachinal round.
I am available to start immediately and can join as soon as required.
Available to start immediately
Flexible with joining date
Can join as soon as required
Yes, I am ready for joining immediately
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
The duration of UltraTech Cement interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 703 interviews
Interview experience
based on 7.2k reviews
Rating in categories
Assistant Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
528
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Officer
493
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
453
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
388
salaries
| ₹0 L/yr - ₹0 L/yr |
Ambuja Cements
ACC
Shree Cement
Dalmia Bharat Cement