i
Uflex
Filter interviews by
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
Market information, product knowledge, new market penetration
I applied via Naukri.com and was interviewed before Jun 2023. There were 4 interview rounds.
Logical, Decision making and IQ test
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
I am an experienced professional with a strong background in management and leadership.
I have over 10 years of experience in management roles, including leading teams of up to 50 people.
I have a proven track record of driving results and achieving goals, both individually and as part of a team.
I am skilled in strategic planning, project management, and process improvement.
I am a strong communicator and collaborator, ab...
BOPP and CPP are types of plastic films used for packaging. Coating is required for various reasons such as protection and aesthetics.
BOPP stands for Biaxially Oriented Polypropylene and CPP stands for Cast Polypropylene.
BOPP is commonly used for packaging snacks, confectionery, and other food items while CPP is used for packaging fresh produce, meat, and cheese.
Coating is required to protect the product from moisture,...
I am currently leading a team of professionals to develop a new marketing strategy to increase brand awareness and drive sales.
Leading a team to develop a new marketing strategy
Increasing brand awareness and driving sales
Analyzing market trends and consumer behavior
Collaborating with cross-functional teams
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
To reduce R&M costs, we need to implement preventive maintenance, use quality spare parts, and train staff on proper equipment usage.
Implement preventive maintenance schedule to avoid breakdowns
Use quality spare parts to reduce frequent replacements
Train staff on proper equipment usage to avoid damages
Negotiate with suppliers for better pricing on spare parts
Implement energy-saving measures to reduce utility costs
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.
VFD stands for Variable Frequency Drive, it is used to control the speed of an electric motor.
VFD is used to vary the speed of an electric motor by adjusting the frequency of the electrical supply to the motor.
Basic control for operating a VFD includes setting the desired speed or frequency, start/stop commands, and monitoring parameters like current and voltage.
Examples of basic controls for operating a VFD include ke...
To check a motor, perform visual inspection, check for unusual noises or vibrations, test electrical connections, measure voltage and current, and perform insulation resistance test.
Perform visual inspection for any signs of damage or wear
Check for unusual noises or vibrations during operation
Test electrical connections for tightness and proper wiring
Measure voltage and current to ensure they are within specifications
P...
The monthly electricity bill varies depending on usage and location.
The monthly electricity bill can be influenced by factors such as the size of the property, number of occupants, energy efficiency of appliances, and local electricity rates.
Usage of high-energy consuming appliances like air conditioners, heaters, and refrigerators can significantly impact the electricity bill.
Location plays a role as electricity rates...
Plant load refers to the amount of power being consumed by a plant or facility at a given time.
Plant load is measured in kilowatts (kW) or megawatts (MW).
It represents the total electrical demand of the plant's equipment and machinery.
Plant load can fluctuate throughout the day based on production needs and equipment usage.
Monitoring plant load is important for ensuring efficient operation and preventing overload.
Examp...
Power factor is the ratio of real power to apparent power in an electrical system. It needs to be maintained for efficient power transfer and to avoid penalties from utility companies.
Power factor impacts the efficiency of power transfer in electrical systems
Low power factor can result in higher energy costs and penalties from utility companies
It affects the quality of power supply and can lead to voltage drops and equ...
Proximity sensors detect the presence of an object without physical contact, while relays are used to control electrical circuits.
Proximity sensors use electromagnetic fields, light, or sound to detect objects nearby.
Relays are switches that open or close circuits based on an electrical signal.
Proximity sensors can be used in automated doors, smartphones, and industrial machinery.
Relays are used in control panels, HVAC
Preventive maintenance schedule involves regular inspections and maintenance tasks to prevent equipment breakdowns.
Create a detailed list of all equipment that needs maintenance
Establish a regular schedule for inspections and maintenance tasks
Document all maintenance activities and keep records for future reference
Prioritize maintenance tasks based on criticality and impact on operations
Train maintenance staff on prope
I applied via Recruitment Consulltant and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
based on 2 reviews
Rating in categories
Assistant Manager
577
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
519
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
387
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
166
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Officer
111
salaries
| ₹0 L/yr - ₹0 L/yr |
EPL Limited
Cosmo Films
Max Speciality Films
Jindal Poly Films