Filter interviews by
PNGRB guidelines for CGD regulate the development and operation of city gas distribution networks in India.
PNGRB stands for Petroleum and Natural Gas Regulatory Board
CGD refers to City Gas Distribution
The guidelines outline the process for authorization, tariff determination, and monitoring of CGD networks
They also cover safety standards, quality of service, and consumer protection measures
Examples of CGD companies in ...
American Society of Mechanical Engineers
ASME is a professional organization that promotes the art, science, and practice of multidisciplinary engineering and allied sciences around the globe.
It sets codes and standards for mechanical devices to ensure safety, quality, and efficiency.
Examples of ASME standards include ASME B31.1 for power piping and ASME BPVC for pressure vessels.
I appeared for an interview before Feb 2024.
I appeared for an interview before Feb 2024.
Self introduction about myself and work experiences
Abouts operations and you deal with driver's at previous Logistics company
posted on 19 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Consists of 10 questions
Consists of 20 questions
posted on 28 Mar 2024
posted on 28 Mar 2024
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.
SDLC consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables to ensure the software meets the requirements and quality standards.
Examples of SDLC models include...
CAN protocol is a communication standard used in automotive and industrial applications.
CAN protocol stands for Controller Area Network
It is a message-based protocol used for communication between electronic control units (ECUs)
CAN protocol allows for high-speed communication and real-time data transmission
It is commonly used in automotive applications for functions such as engine control, transmission control, and bod...
posted on 16 Jan 2021
posted on 9 Apr 2021
I applied via Naukri.com and was interviewed before Apr 2020. There were 4 interview rounds.
In case of Incomer failure, auxiliary supply can be restored by following these steps.
Check the power source and ensure it is functioning properly.
Identify the cause of the incomer failure and rectify it.
Switch to the backup power source.
Ensure that the auxiliary supply is stable and functioning properly.
Monitor the system to ensure that there are no further issues.
based on 2 interviews
Interview experience
Bombardier Transportation
Indian Railway Catering and Tourism
Hyva
Keolis Hyderabad Metro