Development length is the length of reinforcement required to transfer the stresses from the steel to the concrete.
Development length is influenced by factors such as bond strength between steel and concrete, diameter of the reinforcement, and concrete strength.
It is important to ensure that the development length is adequate to prevent premature failure of the structure.
Examples of development length include lap lengt...
Escalation refers to the increase in costs of materials, labor, etc. over time. Reconciliation is the process of comparing estimated costs with actual costs.
Escalation is the adjustment of costs to account for inflation, market trends, etc.
Reconciliation involves comparing estimated costs in the initial budget with the actual costs incurred during the project.
Escalation and reconciliation are important in ensuring the ...
BOQ stands for Bill of Quantities, which is a document used in construction projects to list the materials, parts, and labor needed for a project.
BOQ is a detailed list of items, quantities, and rates needed for a construction project.
It helps in estimating the total cost of the project and serves as a basis for tendering and billing.
BOQ is prepared based on the drawings and specifications of the project.
It includes de...