Cause and effect diagram is a visual tool used to identify and organize possible causes of a problem or effect.
Also known as fishbone diagram or Ishikawa diagram
Helps in identifying root causes of a problem
Categories of causes include people, methods, machines, materials, measurements, and environment
Example: If the problem is late delivery, causes could be transportation issues, production delays, or supplier problems
8 method is a problem-solving technique used in engineering to systematically analyze and solve complex issues.
8 method involves defining the problem, gathering data, analyzing the data, identifying root causes, developing solutions, implementing solutions, monitoring results, and standardizing processes.
It is often used in quality management and continuous improvement processes.
Example: A manufacturing company uses th...
Quality documents are essential for ensuring products meet standards and regulations.
Quality documents include procedures, work instructions, specifications, and records.
They provide guidelines for manufacturing processes and product testing.
Quality documents help ensure consistency, traceability, and compliance with regulations.
Examples of quality documents include quality manuals, inspection reports, and test protoco
Pareto chart is a type of chart that combines a bar graph and a line graph to highlight the most important factors in a dataset.
Pareto chart is used to prioritize issues or problems based on their frequency or impact.
The bars represent individual factors in descending order, while the line represents the cumulative total.
It follows the 80/20 rule, where 80% of the effects come from 20% of the causes.
Commonly used in qu...
Top trending discussions
I applied via Instahyre and was interviewed before Oct 2021. There were 2 interview rounds.
CNC machines are operated using computer programs to control the movement of tools and workpieces. PLCs are programmable logic controllers used to automate industrial processes.
CNC machines are controlled by G-code, a programming language that specifies tool movements and operations.
PLCs are used to control and monitor various devices and processes in industries.
PLC programming involves writing ladder logic or other pr...
I appeared for an interview before Feb 2024.
The seven quality control tools are essential for process improvement and problem-solving in engineering.
Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.
Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.
Cause-and-effect diagram (Fishbone diagram): Visuali...
Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.
Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.
Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.
Step 3: General Inspection - Operators visually inspect the ...
OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Possible Production.
Calculate Quality by dividing Good Units Produced by Total Units Started.
Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.
Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.
By implementing lean practices, organizations can improve quality control and reduce defects in products or services.
Lean practices promote continuous improvement and empower ...
Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.
Provide recognition for their hard work and achievements
Communicate clearly about goals, expectations, and feedback
Offer opportunities for growth and development, such as training or mentorship programs
Create a positive work environment through team-building activities a
Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.
Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.
It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.
By focusing on addressing the most critical fact...
A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.
Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.
Managers should focus on understanding the work being done and the challenges faced by employees.
Gemba walks help in building relationships with employees and fostering a culture of c...
Steps involved in performing safety risk assessments
Identify hazards and potential risks
Assess the likelihood and severity of each risk
Implement control measures to mitigate risks
Monitor and review the effectiveness of control measures
Document findings and recommendations
Communicate risks to relevant stakeholders
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves autonomous maintenance, planned maintenance, and focused improvement activities.
TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
As an assistant engineer, I plan the number of machines required and create monthly plans.
I plan the number of machines needed for various projects and tasks.
I consider factors like project timelines, workload, and resource availability.
I create monthly plans by analyzing project requirements and allocating resources accordingly.
I collaborate with team members and supervisors to ensure efficient planning and execution.
...
I create a daily report by summarizing the tasks completed, any issues encountered, and plans for the next day.
Start by listing all the tasks completed during the day
Note any issues encountered and how they were resolved
Include any progress made towards long-term goals
Outline plans for the next day, including any pending tasks
Ensure the report is concise and easy to understand
The capacity of my previous plant was 500 units per day.
The plant had a daily production capacity of 500 units.
We were able to meet the demand of our clients with this capacity.
The plant had a well-organized production line to ensure maximum output.
We regularly monitored and optimized the production process to increase efficiency.
The capacity was sufficient for the size of the plant and the demand of the market.
posted on 13 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 6 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
I have 2 years of experience working at XYZ Company as a Junior Engineer.
Worked on various projects related to mechanical engineering
Collaborated with senior engineers to design and implement solutions
Participated in testing and troubleshooting processes
Attended training sessions to enhance technical skills
I applied via Walk-in and was interviewed before Oct 2022. There were 3 interview rounds.
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
Typical water cement ratios range from 0.4 to 0.6 for normal strength concrete.
For high strength concrete, water cement ratios can be as low as 0.25.
posted on 12 Mar 2025
I appeared for an interview before Mar 2024.
A basic hydraulic circuit diagram illustrates fluid power systems using components like pumps, valves, and actuators.
Components include a hydraulic pump, which generates flow.
A directional control valve directs fluid to the actuator.
An actuator (cylinder or motor) converts hydraulic energy to mechanical work.
Pressure relief valves protect the system from overpressure.
Hydraulic fluid is typically oil, which transfers po
Key considerations for purchasing EOT crane ropes include material, load capacity, safety standards, and maintenance requirements.
Material: Choose between steel wire ropes or synthetic ropes based on application; steel is durable, while synthetic is lightweight.
Load Capacity: Ensure the rope can handle the maximum load of the crane; for example, a 10-ton crane requires a rope rated for at least 10 tons.
Safety Standards...
EOT cranes can face various issues affecting performance, safety, and efficiency, requiring regular maintenance and troubleshooting.
Electrical failures: Issues with the control panel or wiring can lead to operational failures.
Mechanical wear: Components like gears and bearings may wear out, causing noise and reduced efficiency.
Overloading: Exceeding the crane's load capacity can lead to structural damage or failure.
Bra...
based on 1 interview
Interview experience
Production Engineer
20
salaries
| ₹1.8 L/yr - ₹3.4 L/yr |
Senior Engineer
16
salaries
| ₹2.5 L/yr - ₹4.4 L/yr |
Assistant Manager
11
salaries
| ₹3 L/yr - ₹6 L/yr |
Senior Production Engineer
7
salaries
| ₹2.4 L/yr - ₹5.6 L/yr |
Design Engineer
6
salaries
| ₹2 L/yr - ₹2.6 L/yr |
Primus Global Technologies
Kiswok Industries
Elentec Power India (EPI) Pvt. Ltd.
Patil Group