I applied via campus placement at Institute of Technology, Banaras Hindu University and was interviewed in Jul 2024. There were 3 interview rounds.
20 questions 40 minutes, 3 type of question easy, medium and hard each of 1, 3 and 5 points respectively, if you answer correct then you move above in difficulty else go down.
Implementing binary search and bubble sort algorithms in Python
Binary search: Divide and conquer algorithm to find a target value in a sorted array
Bubble sort: Iteratively swap adjacent elements if they are in the wrong order
Example for binary search: def binary_search(arr, target):
Example for bubble sort: def bubble_sort(arr):
I applied via Approached by Company
Implemented and maintained network infrastructure, managed servers, and provided technical support.
Implemented network upgrades to improve performance and security
Managed Windows and Linux servers, ensuring uptime and security
Provided technical support to end users for hardware and software issues
posted on 27 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There were 2 interview rounds.
Gave me a coding assignment and let them know when its done
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
I am a dedicated and experienced retail professional with a passion for customer service and sales.
Over 5 years of experience in retail sales
Strong communication and interpersonal skills
Proven track record of exceeding sales targets
Passionate about providing excellent customer service
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
Change management for supplier change involves assessing the impact, communicating with stakeholders, implementing the change, and monitoring the results.
Assess the impact of the supplier change on current processes, products, and stakeholders
Communicate the change to all relevant stakeholders, including employees, customers, and suppliers
Implement the change by updating contracts, agreements, and processes as needed
Mo...
Managing supplier delays and shortages
Dealing with unexpected delays in receiving shipments
Finding alternative suppliers to fulfill orders on time
Communicating with internal teams and customers about delays
Negotiating with suppliers for expedited shipping or additional inventory
Implementing inventory management strategies to mitigate future shortages
Low volumes will be handled by optimizing production processes, utilizing efficient inventory management, and exploring alternative suppliers.
Optimizing production processes to reduce costs associated with low volumes
Utilizing efficient inventory management to minimize excess stock and storage costs
Exploring alternative suppliers who can accommodate smaller order quantities
Implementing flexible manufacturing strategies...
Degassing in GDC casting process involves removing gases from the molten metal to improve casting quality.
Degassing is typically achieved by using a degassing unit that removes dissolved gases from the molten metal.
Common methods of degassing include rotary degassing, fluxing, and vacuum degassing.
Degassing helps prevent porosity and improve mechanical properties of the castings.
Proper degassing is essential for achiev
posted on 10 Oct 2024
I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.
Root Cause Analysis is a method used to identify the underlying cause of a problem, while Design of Experiments is a systematic approach to conducting experiments to optimize processes.
Root Cause Analysis involves identifying the primary cause of a problem by asking 'why' multiple times to get to the root issue.
Design of Experiments is a structured method for planning, conducting, analyzing, and interpreting controlled...
Stress strain curves show the relationship between stress and strain in a material under tension.
Stress strain curves typically have three main regions: elastic deformation, plastic deformation, and necking.
The elastic region shows linear relationship between stress and strain, where the material returns to its original shape once the stress is removed.
The plastic region shows non-linear relationship between stress and...
Different kinds of CNC milling include vertical milling, horizontal milling, and 5-axis milling.
Vertical milling: Spindle is vertical and workpiece is mounted on top of the table.
Horizontal milling: Spindle is horizontal and workpiece is mounted on the side of the table.
5-axis milling: Allows for cutting on multiple axes simultaneously, increasing precision and complexity.
Other types include gantry milling, high-speed
The number of customer events varies depending on the project and its scope.
The number of customer events can range from a few to several dozen, depending on the size and complexity of the project.
Customer events may include meetings, presentations, workshops, trainings, and feedback sessions.
Examples of customer events could be product demos, focus groups, user testing sessions, and milestone reviews.
posted on 23 Nov 2024
I applied via Recruitment Consulltant and was interviewed in May 2024. There were 3 interview rounds.
Product development process involves idea generation, market research, design, testing, and launch.
Idea generation: Brainstorming sessions, customer feedback, market trends.
Market research: Analyzing competition, target audience needs, pricing strategies.
Design: Creating prototypes, refining features, ensuring usability.
Testing: Conducting beta tests, gathering feedback, making improvements.
Launch: Marketing campaigns,