Filter interviews by
Be the first one to contribute and help others!
posted on 9 Nov 2022
I applied via Campus Placement and was interviewed before Nov 2021. There were 3 interview rounds.
Quants , Logical and Verbal reasoning are the three sections we were tested on
posted on 14 Nov 2021
I applied via Campus Placement and was interviewed in May 2021. There was 1 interview round.
posted on 16 May 2021
I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.
I can join within two weeks.
I am currently serving a two-week notice period at my current job.
I have already completed all necessary paperwork and background checks.
I am ready to start as soon as possible.
I can adjust my start date based on the company's requirements.
I left my last company to pursue new opportunities and challenges.
Seeking growth and advancement in my career
Looking for a company with a better cultural fit
Wanting to broaden my skill set
Desire for a higher level of responsibility
Company downsizing or restructuring
It was just a aptitude test
Managed a team to implement a new customer relationship management system
Led a team of 5 employees to successfully implement a new CRM system
Coordinated with IT department to ensure smooth integration of the system
Provided training to staff on how to use the new system effectively
I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.
Strong reputation in the industry
Opportunities for career growth and development
Alignment with my career goals and values
posted on 22 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
Assistant Manager
106
salaries
| ₹5.5 L/yr - ₹13.5 L/yr |
Senior Engineer
64
salaries
| ₹4.3 L/yr - ₹9.4 L/yr |
Assistant Engineer
54
salaries
| ₹2.8 L/yr - ₹5.2 L/yr |
Deputy Manager
53
salaries
| ₹6 L/yr - ₹18 L/yr |
Engineer
49
salaries
| ₹4 L/yr - ₹7.2 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International