As Chief Manager, I oversee multiple power transmission lines and manage various gangs responsible for maintenance and operations.
I have multiple gangs under my supervision, each assigned to different sections of the power transmission line.
Each gang is responsible for specific tasks such as maintenance, repair, and inspection of the transmission line.
Examples of gangs include line crews, tower climbers, and maintenanc...
The completion of TL Ss will take approximately 6 months.
The completion of TL Ss typically takes around 6 months.
Factors such as project complexity, team size, and resources available can impact the timeline.
For example, a smaller project with a highly skilled team may be completed in less than 6 months, while a larger project with limited resources may take longer.
Top trending discussions
I applied via Referral and was interviewed before Jan 2023. There were 3 interview rounds.
Interview experience
based on 4 reviews
Rating in categories
Assistant Manager
112
salaries
| ₹5.3 L/yr - ₹12.7 L/yr |
Senior Engineer
71
salaries
| ₹4.3 L/yr - ₹9.4 L/yr |
Assistant Engineer
54
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Engineer
50
salaries
| ₹4 L/yr - ₹7.2 L/yr |
Deputy Manager
49
salaries
| ₹6 L/yr - ₹16.5 L/yr |
Crompton Greaves Consumer Electricals
Havells
Bajaj Electricals
Signify