I applied via Job Portal and was interviewed in Mar 2024. There was 1 interview round.
The turbine erection procedure involves the step-by-step process of assembling and installing a turbine.
Prepare the foundation for the turbine installation
Assemble the turbine components, including the rotor, blades, and generator
Install the turbine tower and secure it to the foundation
Connect the turbine to the electrical grid
Perform necessary tests and inspections to ensure proper functioning
Site management practices involve overseeing and coordinating various aspects of a site to ensure efficiency and safety.
Developing and implementing site policies and procedures
Managing site resources and equipment
Ensuring compliance with safety regulations
Coordinating with different teams and stakeholders
Monitoring and evaluating site performance
Addressing any issues or challenges that arise
Toshiba JSW Power Systems interview questions for popular designations
Yes
I am willing to relocate near the workplace.
I understand the importance of being close to work for better productivity and availability.
I have previously relocated for job opportunities and have adapted well to new environments.
I am open to exploring new areas and experiencing different cultures.
I applied via Referral and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 4 interview rounds.
The power plant project life cycle involves planning, design, construction, operation, and decommissioning.
Planning phase involves site selection, feasibility studies, and obtaining permits.
Design phase includes creating detailed engineering plans and selecting equipment.
Construction phase involves building the power plant according to the design.
Operation phase includes testing, commissioning, and regular maintenance.
...
I applied via Campus Placement and was interviewed in May 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
I handle pressure by prioritizing tasks, taking breaks, and seeking support when needed.
I prioritize tasks based on urgency and importance
I take breaks to clear my mind and recharge
I seek support from colleagues or supervisors when necessary
I practice stress-reducing techniques such as meditation or exercise
I maintain a positive attitude and focus on solutions rather than problems
Top trending discussions
based on 12 interviews
Interview experience
based on 322 reviews
Rating in categories
Manager
105
salaries
| ₹14.6 L/yr - ₹38 L/yr |
Deputy Manager
103
salaries
| ₹10 L/yr - ₹28 L/yr |
Assistant Manager
100
salaries
| ₹7 L/yr - ₹19 L/yr |
Senior Engineer
58
salaries
| ₹5.5 L/yr - ₹14.4 L/yr |
Senior Manager
56
salaries
| ₹14 L/yr - ₹43 L/yr |
BHEL
Siemens
GE
Thermax Limited