Filter interviews by
I applied via Job Portal and was interviewed in Mar 2024. There was 1 interview round.
I applied via Campus Placement
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
Overhauling procedure of turbine and generator involves disassembly, inspection, repair, and reassembly.
Disassemble turbine and generator components
Inspect components for wear and damage
Repair or replace damaged components
Reassemble components and test for proper function
posted on 11 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.
Mathematics, English, Reasoning
An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.
Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.
Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...
Clean India
Corruption
posted on 14 Jul 2021
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I was interviewed before Sep 2016.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Manager
105
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
103
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
94
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
55
salaries
| ₹0 L/yr - ₹0 L/yr |
BHEL
Siemens
GE
Thermax Limited