Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Tiara Infrastructure Team. If you also belong to the team, you can get access from here

Tiara Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Tiara Infrastructure Project Manager Interview Questions and Answers

Updated 21 May 2021

Tiara Infrastructure Project Manager Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Experience and Salary Expected

Interview Preparation Tips

Interview preparation tips for other job seekers - Company is very good and asks very Frequently Question about our old Past Work Experience.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About previous projects
Round 3 - HR 

(1 Question)

  • Q1. Joining period Percentage of salary hike

I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. How to start the projects immediately
  • Ans. 

    To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.

    • Identify the project scope and objectives

    • Create a project plan with clear timelines and milestones

    • Assemble a team with the necessary skills and expertise

    • Assign tasks and responsibilities to team members

    • Establish communication channels and protocols

    • Monitor progress and adjust the plan as needed

  • Answered by AI
  • Q2. What is the initially project requirements to start.
  • Ans. 

    The initial project requirements include defining project goals, scope, timeline, budget, and team roles.

    • Define project goals and objectives

    • Determine project scope and deliverables

    • Create a project timeline and schedule

    • Establish a project budget and resource allocation

    • Assign team roles and responsibilities

  • Answered by AI
  • Q3. Preliminary investigation and procurements of projects execution.
  • Q4. Basic engineering information of project management.
  • Q5. Required manpower as per projects planning organization charts.
  • Q6. Required plant and machinery mobilization.

Interview Preparation Tips

Interview preparation tips for other job seekers - My advise timely design engineering,Manpower and Machinery mobilization.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Weight of steel and calculate the weight of steel in a structure given
  • Ans. 

    Calculate the weight of steel in a structure based on its dimensions and density

    • Determine the dimensions of the steel components (length, width, height)

    • Calculate the volume of each steel component using the formula: Volume = Length x Width x Height

    • Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight

    • Sum up the weights of all steel components to get the total

  • Answered by AI
  • Q2. About previous work experience
Round 2 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. About previous company roles and responsibilities and this company roles and responsibilities.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in technical and site progress and site activities from the basement to finishing work.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is Total Float?
  • Ans. 

    Total Float is the amount of time a schedule activity can be delayed without delaying the project completion date.

    • Total Float is calculated by subtracting the Early Start date of an activity from its Late Start date.

    • It indicates the flexibility in scheduling a particular activity.

    • Activities with zero Total Float are considered critical path activities.

    • Total Float helps project managers in managing project schedules eff

  • Answered by AI
  • Q2. Rate Analysis of Shuttering?
  • Ans. 

    Rate analysis of shuttering involves calculating the cost of materials, labor, and equipment for formwork used in construction projects.

    • Rate analysis of shuttering includes determining the quantity of materials needed for formwork, such as plywood, steel props, and scaffolding.

    • Labor costs for assembling and dismantling the formwork are also considered in the rate analysis.

    • Equipment costs, such as rental of concrete mix...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Ask about previous work & their company profile.
Round 2 - One-on-one 

(1 Question)

  • Q1. Ask about soil properties & PI value.

Interview Preparation Tips

Interview preparation tips for other job seekers - No worries about interview be confident.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Project duration
  • Ans. 

    The project duration can vary depending on the scope, complexity, and resources available.

    • Project duration is typically determined during the planning phase

    • Factors such as scope changes, resource availability, and unexpected challenges can impact project duration

    • It is important to regularly monitor and adjust the project timeline as needed

  • Answered by AI

I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Interview Preparation Tips

Topics to prepare for Rajapushpa Properties Project Manager Civil interview:
  • Civil Construction
  • Bilding
  • Quality Control
  • Shutaring
Interview preparation tips for other job seekers - Hardworking out put verry happy
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Asked about family background and overall experiences previously. Current CTC reason to leaveing the last branded firm Lodha group.
  • Ans. 

    How many children and studying in class?

  • Answered Anonymously
  • Q2. About the working day.
  • Q3. Asked about family members.
  • Q4. Living location and how many dependent.
  • Ans. 

    I currently live in New York City with my spouse and two children.

    • Living in New York City with spouse and two children

    • Total of four dependents including spouse and two children

  • Answered by AI
  • Q5. Finally the positive response received from the team.
  • Ans. 

    Yes , after successful interview round, received offer letter from the company and same day replied.

  • Answered Anonymously
  • Q6. After completing the interview process ,same day received the offer letter.
  • Ans. 

    Yes , after successful interview round, received offer.

  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good supporting senior and company culture.
Fast growing company in the real estate industry.

I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. How to start the projects immediately
  • Ans. 

    To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.

    • Identify the project scope and objectives

    • Create a project plan with clear timelines and milestones

    • Assemble a team with the necessary skills and expertise

    • Assign tasks and responsibilities to team members

    • Establish communication channels and protocols

    • Monitor progress and adjust the plan as needed

  • Answered by AI
  • Q2. What is the initially project requirements to start.
  • Ans. 

    The initial project requirements include defining project goals, scope, timeline, budget, and team roles.

    • Define project goals and objectives

    • Determine project scope and deliverables

    • Create a project timeline and schedule

    • Establish a project budget and resource allocation

    • Assign team roles and responsibilities

  • Answered by AI
  • Q3. Preliminary investigation and procurements of projects execution.
  • Q4. Basic engineering information of project management.
  • Q5. Required manpower as per projects planning organization charts.
  • Q6. Required plant and machinery mobilization.

Interview Preparation Tips

Interview preparation tips for other job seekers - My advise timely design engineering,Manpower and Machinery mobilization.

Tell us how to improve this page.

Tiara Infrastructure Project Manager Salary
based on 4 salaries
₹3.6 L/yr - ₹8.5 L/yr
64% less than the average Project Manager Salary in India
View more details
Senior Engineer
7 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Civil Engineer
6 salaries
unlock blur

₹3 L/yr - ₹3.5 L/yr

Site Engineer
5 salaries
unlock blur

₹2.6 L/yr - ₹3 L/yr

Surveyor
5 salaries
unlock blur

₹2.4 L/yr - ₹4.2 L/yr

Project Manager
4 salaries
unlock blur

₹3.6 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Tiara Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

IRB Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview