i
Tiara Infrastructure
Filter interviews by
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.
Identify the project scope and objectives
Create a project plan with clear timelines and milestones
Assemble a team with the necessary skills and expertise
Assign tasks and responsibilities to team members
Establish communication channels and protocols
Monitor progress and adjust the plan as needed
The initial project requirements include defining project goals, scope, timeline, budget, and team roles.
Define project goals and objectives
Determine project scope and deliverables
Create a project timeline and schedule
Establish a project budget and resource allocation
Assign team roles and responsibilities
Calculate the weight of steel in a structure based on its dimensions and density
Determine the dimensions of the steel components (length, width, height)
Calculate the volume of each steel component using the formula: Volume = Length x Width x Height
Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight
Sum up the weights of all steel components to get the total
Total Float is the amount of time a schedule activity can be delayed without delaying the project completion date.
Total Float is calculated by subtracting the Early Start date of an activity from its Late Start date.
It indicates the flexibility in scheduling a particular activity.
Activities with zero Total Float are considered critical path activities.
Total Float helps project managers in managing project schedules eff
Rate analysis of shuttering involves calculating the cost of materials, labor, and equipment for formwork used in construction projects.
Rate analysis of shuttering includes determining the quantity of materials needed for formwork, such as plywood, steel props, and scaffolding.
Labor costs for assembling and dismantling the formwork are also considered in the rate analysis.
Equipment costs, such as rental of concrete mix...
I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.
The project duration can vary depending on the scope, complexity, and resources available.
Project duration is typically determined during the planning phase
Factors such as scope changes, resource availability, and unexpected challenges can impact project duration
It is important to regularly monitor and adjust the project timeline as needed
posted on 9 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
How many children and studying in class?
I currently live in New York City with my spouse and two children.
Living in New York City with spouse and two children
Total of four dependents including spouse and two children
Yes , after successful interview round, received offer letter from the company and same day replied.
Yes , after successful interview round, received offer.
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.
Identify the project scope and objectives
Create a project plan with clear timelines and milestones
Assemble a team with the necessary skills and expertise
Assign tasks and responsibilities to team members
Establish communication channels and protocols
Monitor progress and adjust the plan as needed
The initial project requirements include defining project goals, scope, timeline, budget, and team roles.
Define project goals and objectives
Determine project scope and deliverables
Create a project timeline and schedule
Establish a project budget and resource allocation
Assign team roles and responsibilities
Senior Engineer
7
salaries
| ₹3 L/yr - ₹6 L/yr |
Civil Engineer
6
salaries
| ₹3 L/yr - ₹3.5 L/yr |
Site Engineer
5
salaries
| ₹2.6 L/yr - ₹3 L/yr |
Surveyor
5
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Project Manager
4
salaries
| ₹3.6 L/yr - ₹8.5 L/yr |
Larsen & Toubro Limited
GMR Group
Hindustan Construction Company
IRB Infrastructure